Selection and Location of Fixed-Step Capacitor Banks in Distribution Grids for Minimization of Annual Operating Costs: A Two-Stage Approach

The problem regarding the optimal location and sizing of fixed-step capacitor banks in distribution networks with radial configuration is studied in this research by applying a two-stage optimization approach. The first stage consists of determining the nodes where the capacitor banks will be placed...

Full description

Autores:
Montoya, Oscar Danilo
Rivas-Trujillo, Edwin
Giral-Ramírez, Diego Armando
Tipo de recurso:
Fecha de publicación:
2022
Institución:
Universidad Tecnológica de Bolívar
Repositorio:
Repositorio Institucional UTB
Idioma:
eng
OAI Identifier:
oai:repositorio.utb.edu.co:20.500.12585/12181
Acceso en línea:
https://hdl.handle.net/20.500.12585/12181
Palabra clave:
Annual operating cost minimization
Daily load variations
Fixed-step capacitor banks
Successive approximation power flow method
Two-stage optimization approach
Rights
openAccess
License
http://creativecommons.org/licenses/by-nc-nd/4.0/