Mixed-integer programming model for transmission network expansion planning with Battery Energy Storage Systems (BESS)
This article assesses the costs and benefits of incorporating battery energy storage systems (BESS) in transmission network expansion planning (TEP) over multiple time periods. We propose a mixed-integer programming model (MIP) for joint planning of the installation of battery energy storage systems...
- Autores:
-
Mora, Camilo Andres
Rivas-Trujillo, Edwin
Montoya Giraldo, Oscar Danilo
- Tipo de recurso:
- Article of journal
- Fecha de publicación:
- 2020
- Institución:
- Universidad Tecnológica de Bolívar
- Repositorio:
- Repositorio Institucional UTB
- Idioma:
- eng
- OAI Identifier:
- oai:repositorio.utb.edu.co:20.500.12585/9548
- Palabra clave:
- Mixed-integer linear programming
Transmission expansion planning
Battery energy storage systems
- Rights
- openAccess
- License
- http://creativecommons.org/licenses/by-nc-nd/4.0/
