Mixed-integer programming model for transmission network expansion planning with Battery Energy Storage Systems (BESS)

This article assesses the costs and benefits of incorporating battery energy storage systems (BESS) in transmission network expansion planning (TEP) over multiple time periods. We propose a mixed-integer programming model (MIP) for joint planning of the installation of battery energy storage systems...

Full description

Autores:
Mora, Camilo Andres
Montoya, Oscar Danilo
Rivas Trujillo, Edwin
Tipo de recurso:
Fecha de publicación:
2020
Institución:
Universidad Tecnológica de Bolívar
Repositorio:
Repositorio Institucional UTB
Idioma:
eng
OAI Identifier:
oai:repositorio.utb.edu.co:20.500.12585/9548
Acceso en línea:
https://hdl.handle.net/20.500.12585/9548
https://www.mdpi.com/1996-1073/13/17/4386
Palabra clave:
Mixed-integer linear programming
Transmission expansion planning
Battery energy storage systems
Rights
openAccess
License
http://creativecommons.org/licenses/by-nc-nd/4.0/