Experimental investigation of the performance of 6 kW BIPV system applied in laboratory building

This paper describes the operational performance results of 6 kW grid-connected building integrated photovoltaic system (BIPV) applied in laboratory building, installed in Colombia (in Bogotá, at 4°35’ latitude and 2.580m altitude) after one year of monitoring (September 2015-August 2016). The BIPV...

Full description

Autores:
Tipo de recurso:
Fecha de publicación:
2017
Institución:
Universidad de Bogotá Jorge Tadeo Lozano
Repositorio:
Expeditio: repositorio UTadeo
Idioma:
OAI Identifier:
oai:expeditiorepositorio.utadeo.edu.co:20.500.12010/9113
Acceso en línea:
http://dx.doi.org/doi:10.1016/j.enbuild.2017.07.030
http://hdl.handle.net/20.500.12010/9113
Palabra clave:
BIPV system
Distributed energy
PV performance
Monitoring
Efficiency
Generadores de energía fotovoltaica
Conversión directa de energía
Rights
License
Abierto (Texto Completo)