Production scheduling with sequence-dependent setups and job release times

This paper studies a shortterm production scheduling problem inspired from reallife manufacturing systems consisting on the scheduling a set of jobs (production orders) on both a single machine and identical parallel machines with the objective of minimizing the makespan or maximum completion time o...

Full description

Autores:
Montoya Torres, Jairo Rafael
Soto Ferrari, Milton Rene
González Solano, Fernando
Tipo de recurso:
Article of journal
Fecha de publicación:
2010
Institución:
Universidad Nacional de Colombia
Repositorio:
Universidad Nacional de Colombia
Idioma:
spa
OAI Identifier:
oai:repositorio.unal.edu.co:unal/37605
Acceso en línea:
https://repositorio.unal.edu.co/handle/unal/37605
http://bdigital.unal.edu.co/27689/
Palabra clave:
Scheduling
sequence-dependent setup times
release dates
randomness
heuristic.
Rights
openAccess
License
Atribución-NoComercial 4.0 Internacional