Effects of uncertainty on scheduling of highway construction projects

Time and cost overruns in highway construction are usual in Colombia. Contractors regularly fail in cost estimation and construction scheduling. An analysis of important factors on time and cost overruns in highway construction in southwest Colombia is presented in this paper. Forty highway construc...

Full description

Autores:
Gómez, Hernán Darío
Orobio, Armando
Tipo de recurso:
Article of journal
Fecha de publicación:
2015
Institución:
Universidad Nacional de Colombia
Repositorio:
Universidad Nacional de Colombia
Idioma:
spa
OAI Identifier:
oai:repositorio.unal.edu.co:unal/60657
Acceso en línea:
https://repositorio.unal.edu.co/handle/unal/60657
http://bdigital.unal.edu.co/58989/
Palabra clave:
62 Ingeniería y operaciones afines / Engineering
Highway Infrastructure
construction scheduling
time overrun
cost overrun
Rights
openAccess
License
Atribución-NoComercial 4.0 Internacional
id UNACIONAL2_2c14d67503d38e1c1ddce8a84462ed8b
oai_identifier_str oai:repositorio.unal.edu.co:unal/60657
network_acronym_str UNACIONAL2
network_name_str Universidad Nacional de Colombia
repository_id_str
spelling Atribución-NoComercial 4.0 InternacionalDerechos reservados - Universidad Nacional de Colombiahttp://creativecommons.org/licenses/by-nc/4.0/info:eu-repo/semantics/openAccesshttp://purl.org/coar/access_right/c_abf2Gómez, Hernán Darío0a4e8dc5-0a44-4b1d-ad4f-8e64b072aded300Orobio, Armando877c31fc-2194-40ff-9e77-bbda0b355fcb3002019-07-02T18:49:02Z2019-07-02T18:49:02Z2015-09-01ISSN: 2346-2183https://repositorio.unal.edu.co/handle/unal/60657http://bdigital.unal.edu.co/58989/Time and cost overruns in highway construction are usual in Colombia. Contractors regularly fail in cost estimation and construction scheduling. An analysis of important factors on time and cost overruns in highway construction in southwest Colombia is presented in this paper. Forty highway construction projects were reviewed. Data from construction documents were collected to prepare a data base for probabilistic analysis. Data collected include scheduled construction time and cost, actual construction time and cost, and unexpected events which could have affected the construction process. Data were used in a probabilistic cost and schedule risk analysis to identify critical factors in construction time and cost overruns in the region. It was found that the activities that most affect the time and cost overruns are the construction of the granular base and the asphalt layer. The most common causes of construction overruns were found to be poor cost and duration estimates, rain, and materials supply problems.application/pdfspaUniversidad Nacional de Colombia (Sede Medellín). Facultad de Minas.https://revistas.unal.edu.co/index.php/dyna/article/view/47453Universidad Nacional de Colombia Revistas electrónicas UN DynaDynaGómez, Hernán Darío and Orobio, Armando (2015) Effects of uncertainty on scheduling of highway construction projects. DYNA, 82 (193). pp. 155-164. ISSN 2346-218362 Ingeniería y operaciones afines / EngineeringHighway Infrastructureconstruction schedulingtime overruncost overrunEffects of uncertainty on scheduling of highway construction projectsArtículo de revistainfo:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionhttp://purl.org/coar/resource_type/c_6501http://purl.org/coar/resource_type/c_2df8fbb1http://purl.org/coar/version/c_970fb48d4fbd8a85Texthttp://purl.org/redcol/resource_type/ARTORIGINAL47453-264011-1-PB.pdfapplication/pdf1562161https://repositorio.unal.edu.co/bitstream/unal/60657/1/47453-264011-1-PB.pdf2a8b047145889cf404cd2e02479fa3d2MD51THUMBNAIL47453-264011-1-PB.pdf.jpg47453-264011-1-PB.pdf.jpgGenerated Thumbnailimage/jpeg8837https://repositorio.unal.edu.co/bitstream/unal/60657/2/47453-264011-1-PB.pdf.jpg9d16c9ef3430aac823f4d63777f27df4MD52unal/60657oai:repositorio.unal.edu.co:unal/606572024-04-14 23:11:25.226Repositorio Institucional Universidad Nacional de Colombiarepositorio_nal@unal.edu.co
dc.title.spa.fl_str_mv Effects of uncertainty on scheduling of highway construction projects
title Effects of uncertainty on scheduling of highway construction projects
spellingShingle Effects of uncertainty on scheduling of highway construction projects
62 Ingeniería y operaciones afines / Engineering
Highway Infrastructure
construction scheduling
time overrun
cost overrun
title_short Effects of uncertainty on scheduling of highway construction projects
title_full Effects of uncertainty on scheduling of highway construction projects
title_fullStr Effects of uncertainty on scheduling of highway construction projects
title_full_unstemmed Effects of uncertainty on scheduling of highway construction projects
title_sort Effects of uncertainty on scheduling of highway construction projects
dc.creator.fl_str_mv Gómez, Hernán Darío
Orobio, Armando
dc.contributor.author.spa.fl_str_mv Gómez, Hernán Darío
Orobio, Armando
dc.subject.ddc.spa.fl_str_mv 62 Ingeniería y operaciones afines / Engineering
topic 62 Ingeniería y operaciones afines / Engineering
Highway Infrastructure
construction scheduling
time overrun
cost overrun
dc.subject.proposal.spa.fl_str_mv Highway Infrastructure
construction scheduling
time overrun
cost overrun
description Time and cost overruns in highway construction are usual in Colombia. Contractors regularly fail in cost estimation and construction scheduling. An analysis of important factors on time and cost overruns in highway construction in southwest Colombia is presented in this paper. Forty highway construction projects were reviewed. Data from construction documents were collected to prepare a data base for probabilistic analysis. Data collected include scheduled construction time and cost, actual construction time and cost, and unexpected events which could have affected the construction process. Data were used in a probabilistic cost and schedule risk analysis to identify critical factors in construction time and cost overruns in the region. It was found that the activities that most affect the time and cost overruns are the construction of the granular base and the asphalt layer. The most common causes of construction overruns were found to be poor cost and duration estimates, rain, and materials supply problems.
publishDate 2015
dc.date.issued.spa.fl_str_mv 2015-09-01
dc.date.accessioned.spa.fl_str_mv 2019-07-02T18:49:02Z
dc.date.available.spa.fl_str_mv 2019-07-02T18:49:02Z
dc.type.spa.fl_str_mv Artículo de revista
dc.type.coar.fl_str_mv http://purl.org/coar/resource_type/c_2df8fbb1
dc.type.driver.spa.fl_str_mv info:eu-repo/semantics/article
dc.type.version.spa.fl_str_mv info:eu-repo/semantics/publishedVersion
dc.type.coar.spa.fl_str_mv http://purl.org/coar/resource_type/c_6501
dc.type.coarversion.spa.fl_str_mv http://purl.org/coar/version/c_970fb48d4fbd8a85
dc.type.content.spa.fl_str_mv Text
dc.type.redcol.spa.fl_str_mv http://purl.org/redcol/resource_type/ART
format http://purl.org/coar/resource_type/c_6501
status_str publishedVersion
dc.identifier.issn.spa.fl_str_mv ISSN: 2346-2183
dc.identifier.uri.none.fl_str_mv https://repositorio.unal.edu.co/handle/unal/60657
dc.identifier.eprints.spa.fl_str_mv http://bdigital.unal.edu.co/58989/
identifier_str_mv ISSN: 2346-2183
url https://repositorio.unal.edu.co/handle/unal/60657
http://bdigital.unal.edu.co/58989/
dc.language.iso.spa.fl_str_mv spa
language spa
dc.relation.spa.fl_str_mv https://revistas.unal.edu.co/index.php/dyna/article/view/47453
dc.relation.ispartof.spa.fl_str_mv Universidad Nacional de Colombia Revistas electrónicas UN Dyna
Dyna
dc.relation.references.spa.fl_str_mv Gómez, Hernán Darío and Orobio, Armando (2015) Effects of uncertainty on scheduling of highway construction projects. DYNA, 82 (193). pp. 155-164. ISSN 2346-2183
dc.rights.spa.fl_str_mv Derechos reservados - Universidad Nacional de Colombia
dc.rights.coar.fl_str_mv http://purl.org/coar/access_right/c_abf2
dc.rights.license.spa.fl_str_mv Atribución-NoComercial 4.0 Internacional
dc.rights.uri.spa.fl_str_mv http://creativecommons.org/licenses/by-nc/4.0/
dc.rights.accessrights.spa.fl_str_mv info:eu-repo/semantics/openAccess
rights_invalid_str_mv Atribución-NoComercial 4.0 Internacional
Derechos reservados - Universidad Nacional de Colombia
http://creativecommons.org/licenses/by-nc/4.0/
http://purl.org/coar/access_right/c_abf2
eu_rights_str_mv openAccess
dc.format.mimetype.spa.fl_str_mv application/pdf
dc.publisher.spa.fl_str_mv Universidad Nacional de Colombia (Sede Medellín). Facultad de Minas.
institution Universidad Nacional de Colombia
bitstream.url.fl_str_mv https://repositorio.unal.edu.co/bitstream/unal/60657/1/47453-264011-1-PB.pdf
https://repositorio.unal.edu.co/bitstream/unal/60657/2/47453-264011-1-PB.pdf.jpg
bitstream.checksum.fl_str_mv 2a8b047145889cf404cd2e02479fa3d2
9d16c9ef3430aac823f4d63777f27df4
bitstream.checksumAlgorithm.fl_str_mv MD5
MD5
repository.name.fl_str_mv Repositorio Institucional Universidad Nacional de Colombia
repository.mail.fl_str_mv repositorio_nal@unal.edu.co
_version_ 1814089414258720768