Effects of uncertainty on scheduling of highway construction projects
Time and cost overruns in highway construction are usual in Colombia. Contractors regularly fail in cost estimation and construction scheduling. An analysis of important factors on time and cost overruns in highway construction in southwest Colombia is presented in this paper. Forty highway construc...
- Autores:
-
Gómez, Hernán Darío
Orobio, Armando
- Tipo de recurso:
- Article of journal
- Fecha de publicación:
- 2015
- Institución:
- Universidad Nacional de Colombia
- Repositorio:
- Universidad Nacional de Colombia
- Idioma:
- spa
- OAI Identifier:
- oai:repositorio.unal.edu.co:unal/60657
- Acceso en línea:
- https://repositorio.unal.edu.co/handle/unal/60657
http://bdigital.unal.edu.co/58989/
- Palabra clave:
- 62 Ingeniería y operaciones afines / Engineering
Highway Infrastructure
construction scheduling
time overrun
cost overrun
- Rights
- openAccess
- License
- Atribución-NoComercial 4.0 Internacional