A continuous time model for a short-term multiproduct batch process scheduling
In the chemical industry, it is common to find production systems characterized by having a single stage or a previously identified bottleneck stage, with multiple non-identical parallel stations and with setup costs that depend on the production sequence. This paper proposes a mixed integer product...
- Autores:
-
Díaz Ramírez, Jenny
Huertas, Jose Ignacio
- Tipo de recurso:
- Article of journal
- Fecha de publicación:
- 2018
- Institución:
- Universidad Nacional de Colombia
- Repositorio:
- Universidad Nacional de Colombia
- Idioma:
- spa
- OAI Identifier:
- oai:repositorio.unal.edu.co:unal/67552
- Acceso en línea:
- https://repositorio.unal.edu.co/handle/unal/67552
http://bdigital.unal.edu.co/68581/
- Palabra clave:
- 62 Ingeniería y operaciones afines / Engineering
MIP modeling
goal programming
batch process scheduling
short-term scheduling
mathematical formulation
Monte Carlo simulation
programación entera mixta
programación de la producción por lotes
industria química
modelación matemática
simulación Monte Carlo
- Rights
- openAccess
- License
- Atribución-NoComercial 4.0 Internacional