Apoyo técnico en el proceso de revisión de proyectos e instalaciones hidráulicas, en la sección de disponibilidades del acueducto metropolitano de Bucaramanga S.A esp
Se Presenta El Informe Del Trabajo De Grado Desarrollado En La Modalidad De Práctica Empresarial En El Acueducto Metropolitano De Bucaramanga (Amb). El Objetivo Planteado Para El Proyecto Fue Prestar Apoyo Técnico En El Proceso De Revisión De Proyectos E Instalaciones Hidráulicas, En La Sección De D...
- Autores:
-
Latorre Vesga, Isabel Cristina
- Tipo de recurso:
- http://purl.org/coar/version/c_b1a7d7d4d402bcce
- Fecha de publicación:
- 2016
- Institución:
- Universidad Industrial de Santander
- Repositorio:
- Repositorio UIS
- Idioma:
- spa
- OAI Identifier:
- oai:noesis.uis.edu.co:20.500.14071/34030
- Palabra clave:
- Instalaciones Hidráulicas
Proyecto Hidráulico
Revisión De Proyectos Hidráulicos
Golpe De Ariete
Fraccionamiento De Caudal
Variadores De Velocidad.
This document contents the grade work report developed in the mode of practice business in the Aqueduct Metropolitan of Bucaramanga (amb). The target raised for the project was to give technical support in the process of project review and hydraulic facilities
in the section of availability of the company. In this sense
the work supported the review of hydraulic projects verification exceeding ten (10) units or three (3) floors of height; of premises destined to housing
industry or trade; with over 1m3 /h manning; or commercial establishments with greater than 500 m2 area. In addition
within the framework of practice it was conducted visits to hydraulic installations
to verify that achievement was done in accordance with the design approved by the amb. The review of hydraulic projects and the visits to the buildings fulfillment two of the targets raised for the practice. On record
this report contains statistics of the results of review of projects
discriminating between buildings of small
medium-sized and big height; and a photographic record of the review realized to one of the facilities visited during the practice. The third objective proposed to write a technical document
as an update proposal to the current norm in the amb for the design and construction of hydraulic facilities. For that purpose
it was studied water-hammer
flow rates fractioning and variable frequency drives. The study allowed to include these topics in the update proposal to the norm. That way
the indicated topics complemented the updates that was proposed on the subject of onslaught
water meters
units of expenses
losses
tanks and fire protection.
- Rights
- License
- Attribution-NonCommercial 4.0 International (CC BY-NC 4.0)