Planificación de estructuras temporales de un proyecto de construcción con base en modelos bim 5d y dinámica de sistemas

La deficiente planificación de estructuras temporales en proyectos de construcción ocasiona graves problemas de apilamiento de estas estructuras, generando perdida de espacio, incomodidad, y principalmente pérdida de tiempo involucrado directamente todos los aspectos económicos del proyecto. Buildin...

Full description

Autores:
Galvis Guerra, Jose Alberto
Ruiz Sarmiento, Jonathan Javier
Tipo de recurso:
http://purl.org/coar/version/c_b1a7d7d4d402bcce
Fecha de publicación:
2016
Institución:
Universidad Industrial de Santander
Repositorio:
Repositorio UIS
Idioma:
spa
OAI Identifier:
oai:noesis.uis.edu.co:20.500.14071/34004
Acceso en línea:
https://noesis.uis.edu.co/handle/20.500.14071/34004
https://noesis.uis.edu.co
Palabra clave:
Estructuras Temporales
Planificación
Building Information Modeling
Dinámica De Sistemas.
Poor planning of temporary structures in construction projects causes serious problems stacking of these structures
generating waste of space
inconvenience
loss of time and mainly involved directly all economic aspects of the project. Building Information Modeling (BIM) is the automated digital representation of the various dimensions of a project using commercially available software. System dynamics
allows to model and study the temporal behavior of a system as a function of time. This study aimed to propose a methodology for the planning of temporary structures
based on BIM 5D models and system dynamics. The methodology was divided into three phases: the first phase
a set of variables that affect the planning of temporary structures identified; in the second phase
temporary structures planning a case study applying BIM 5D and system dynamics performed; finally
in phase three an algorithm was developed to develop the planning of temporary structures with BIM models and system dynamics. It was found that the use of BIM 5D and system dynamics is possible to plan the installation of temporary structures in construction projects reinforced concrete and allows availability
consistency
accessibility and reliability of information project towards reducing identifying uncertainty in planning downtime of temporary structures adding value to the construction process
increasing the quality of decision-making process for continuous improvement of the planning process. .