An approach for scheduling a bi-objective flexible flow shop
This work considers a hybrid flow shop scheduling problem, a well-known production systems problem. It has been largely studied in the literature as a single objective optimization problem. We analyze a flow shop with two stages and ms identical and unrelated parallel machines at each stage s. Given...
- Autores:
-
Miguel Rojas, Santiago
Hulett, María
Muthuswamy, Shanthi
Niebles Atencio, Fabricio Andres
- Tipo de recurso:
- Article of journal
- Fecha de publicación:
- 2015
- Institución:
- Corporación Universidad de la Costa
- Repositorio:
- REDICUC - Repositorio CUC
- Idioma:
- eng
- OAI Identifier:
- oai:repositorio.cuc.edu.co:11323/1046
- Acceso en línea:
- https://hdl.handle.net/11323/1046
https://repositorio.cuc.edu.co/
- Palabra clave:
- Bi-Objective scheduling
Cmax
Flexible flow shop
PSO
Tmax
- Rights
- openAccess
- License
- Atribución – No comercial – Compartir igual