Discrete event simulation applying lean methodologies: case study. Wooden sector

In productive processes where parts are assembled, the assembly time is one of the most important problems that should be solved. Due to this, a case study was carried out in one company in the wooden sector, in which the Lean methodologies and the Discrete Events Simulation are integrated, to evalu...

Full description

Autores:
Reyes-Mejia, Raiza
Troncoso-Mendoza, Blass
Troncoso Palacio, Alexander
Tipo de recurso:
Article of journal
Fecha de publicación:
2019
Institución:
Corporación Universidad de la Costa
Repositorio:
REDICUC - Repositorio CUC
Idioma:
eng
OAI Identifier:
oai:repositorio.cuc.edu.co:11323/6569
Acceso en línea:
https://hdl.handle.net/11323/6569
https://doi.org/10.17981/ijmsor.04.01.02
https://repositorio.cuc.edu.co/
Palabra clave:
Assembly stowage wooden
Delivery time improvements
Lean Six Sigma
Operational processes improvements
Wooden sector
Rights
openAccess
License
CC0 1.0 Universal