Discrete event simulation applying lean methodologies: case study. Wooden sector
In productive processes where parts are assembled, the assembly time is one of the most important problems that should be solved. Due to this, a case study was carried out in one company in the wooden sector, in which the Lean methodologies and the Discrete Events Simulation are integrated, to evalu...
- Autores:
-
Reyes-Mejia, Raiza
Troncoso-Mendoza, Blass
Troncoso Palacio, Alexander
- Tipo de recurso:
- Article of journal
- Fecha de publicación:
- 2019
- Institución:
- Corporación Universidad de la Costa
- Repositorio:
- REDICUC - Repositorio CUC
- Idioma:
- eng
- OAI Identifier:
- oai:repositorio.cuc.edu.co:11323/6569
- Acceso en línea:
- https://hdl.handle.net/11323/6569
https://doi.org/10.17981/ijmsor.04.01.02
https://repositorio.cuc.edu.co/
- Palabra clave:
- Assembly stowage wooden
Delivery time improvements
Lean Six Sigma
Operational processes improvements
Wooden sector
- Rights
- openAccess
- License
- CC0 1.0 Universal