Planning open and closed-loop feeders with efficiency analysis

The evolution of distribution systems (DS) towards the smart-grid concept posses new challenges, triggered by the integration of distributed generation (DG) and the installation of new devices. These challenges raise the need to reconsider the traditional network operation during the planning stage,...

Full description

Autores:
Tipo de recurso:
Fecha de publicación:
2015
Institución:
Universidad del Rosario
Repositorio:
Repositorio EdocUR - U. Rosario
Idioma:
eng
OAI Identifier:
oai:repository.urosario.edu.co:10336/28929
Acceso en línea:
https://doi.org/10.1109/PTC.2015.7232656
https://repository.urosario.edu.co/handle/10336/28929
Palabra clave:
Substations
Planning
Reliability
Input variables
Joining processes
Smart grids
Indexes
Rights
License
Restringido (Acceso a grupos específicos)