Revitalizador educativo : la estrategia de la verticalidad

"Starting from the concern for the ideal proposal to construct the metro line that would transform the composition of the city of Bogota in aspects of mobility, urbanism, social, and therefore architectonic; a strategy emerged that would intervene a certain part along Avenida Caracas. The secto...

Full description

Autores:
Andrade Navarro, Natalia
Tipo de recurso:
Trabajo de grado de pregrado
Fecha de publicación:
2016
Institución:
Universidad de los Andes
Repositorio:
Séneca: repositorio Uniandes
Idioma:
spa
OAI Identifier:
oai:repositorio.uniandes.edu.co:1992/61575
Acceso en línea:
http://hdl.handle.net/1992/61575
Palabra clave:
Espacio público
Urbanismo
Rights
openAccess
License
http://creativecommons.org/licenses/by-nc-nd/4.0/
Description
Summary:"Starting from the concern for the ideal proposal to construct the metro line that would transform the composition of the city of Bogota in aspects of mobility, urbanism, social, and therefore architectonic; a strategy emerged that would intervene a certain part along Avenida Caracas. The sector that was chosen as area of ??study was MARLY, the zone that includes from 45th street to 60th street, and between the fifth and seventh avenues. In first place, it was took into account the location of the metro line station on Caracas Avenue from 47th Street to 51st Street; by being the direct connection with this new massive medium of transport one of the main objectives of the project... Therefore, the second objective is to propose a project that will provide a new profile to the Caracas Avenue." -- Tomado del Formato de Documento de Grado.