Direct stockpile scheduling: Mathematical formulation

In a mining context, production scheduling’s main objective is to determine the best mining sequence of blocks to achieve the largest net present value and to maximize ore reserve exploitation. Stockpiling and blending procedures may represent very helpful alternatives for mine planning to ensure th...

Full description

Autores:
Souza, Felipe Ribeiro
Soares Chaves, Leonardo
Burgarelli, Hudson
Nader, Alizeibek
Arroyo, Carlos
Alberto, Luiz
Tipo de recurso:
Article of journal
Fecha de publicación:
2018
Institución:
Universidad Nacional de Colombia
Repositorio:
Universidad Nacional de Colombia
Idioma:
spa
OAI Identifier:
oai:repositorio.unal.edu.co:unal/68543
Acceso en línea:
https://repositorio.unal.edu.co/handle/unal/68543
http://bdigital.unal.edu.co/69576/
Palabra clave:
62 Ingeniería y operaciones afines / Engineering
stockpile
goal programing
blending constraints
stockpile scheduling
bulk ore blending
pilas de acopio
goal programing
restricciones de mezcla
agendamiento de pilas
mezcla de concetrado
Rights
openAccess
License
Atribución-NoComercial 4.0 Internacional
Description
Summary:In a mining context, production scheduling’s main objective is to determine the best mining sequence of blocks to achieve the largest net present value and to maximize ore reserve exploitation. Stockpiling and blending procedures may represent very helpful alternatives for mine planning to ensure the ore quality and amount required by the processing plant. In order to satisfy industrial requirements of grades and tones, reducing stockpile fluctuations may represent a very important tool especially for medium and short term mine planning. Classical linear programing has been widely used to model blending problems at the mining industry, however this formulation allows only one objective formulation. The current work describes a system based on goal programing able to reach blending constraints desired by short/medium term planning. The proposed formulation achieves the best schedule scenario, ensuring cost constrains are respected. Hence, this study aims to provide support for both short and long term mine planning.