Heuristic for production scheduling on job-shop plants considering preventive maintenance tasks

The simultaneous analysis of production scheduling and preventive maintenance task attracts special attention of researchers due to its complexity and therefore the necessity to seek efficient methods for solving this kind of combinatorial problems. This paper presents a heuristic approach to solve...

Full description

Autores:
Díaz Cazaña, Ronald
Costa Salas, Yasel José
Sarache Castro, William Ariel
Tipo de recurso:
Article of journal
Fecha de publicación:
2014
Institución:
Universidad Nacional de Colombia
Repositorio:
Universidad Nacional de Colombia
Idioma:
spa
OAI Identifier:
oai:repositorio.unal.edu.co:unal/50623
Acceso en línea:
https://repositorio.unal.edu.co/handle/unal/50623
http://bdigital.unal.edu.co/44621/
Palabra clave:
simultaneous programming
production scheduling
preventive maintenance
linear programming model.
Rights
openAccess
License
Atribución-NoComercial 4.0 Internacional
id UNACIONAL2_a27b566b60f7173c83a53d96284412de
oai_identifier_str oai:repositorio.unal.edu.co:unal/50623
network_acronym_str UNACIONAL2
network_name_str Universidad Nacional de Colombia
repository_id_str
spelling Atribución-NoComercial 4.0 InternacionalDerechos reservados - Universidad Nacional de Colombiahttp://creativecommons.org/licenses/by-nc/4.0/info:eu-repo/semantics/openAccesshttp://purl.org/coar/access_right/c_abf2Díaz Cazaña, Ronald88fd95cf-7c18-4a2d-b8df-7d3c1115e68e300Costa Salas, Yasel José21d5a91e-58e0-4caa-a967-74671153bc08300Sarache Castro, William Arielc269c5fd-4b02-4b2d-8549-c49d0c9db88d3002019-06-29T10:33:53Z2019-06-29T10:33:53Z2014-10-24https://repositorio.unal.edu.co/handle/unal/50623http://bdigital.unal.edu.co/44621/The simultaneous analysis of production scheduling and preventive maintenance task attracts special attention of researchers due to its complexity and therefore the necessity to seek efficient methods for solving this kind of combinatorial problems. This paper presents a heuristic approach to solve this issue on job shop plants. The solution method includes a linear programming model, based on the Traveling Salesman Problem, where the setup time is considered as distance measure. The method´s aim is to obtain a sequence of production orders and preventive maintenance tasks that reduce the idle time and the backlogs simultaneously, accomplishing the maintenance program. After finding an optimal solution for each machine a Correction Factor (CF) is determined as new distance measure. The CF considers the structure of the initial solution, the machine utilization and the product priorities. Then, the final solution is reached running the linear programming model using the distance updated values. Finally, the proposed heuristic is applied to real case study of the Cuban industry. The experimental results indicated a significant idle time reduction for the company under examination.application/pdfspaUniversidad Nacional de Colombia Sede Medellínhttp://revistas.unal.edu.co/index.php/dyna/article/view/46103Universidad Nacional de Colombia Revistas electrónicas UN DynaDynaDyna; Vol. 81, núm. 187 (2014); 215-222 DYNA; Vol. 81, núm. 187 (2014); 215-222 2346-2183 0012-7353Díaz Cazaña, Ronald and Costa Salas, Yasel José and Sarache Castro, William Ariel (2014) Heuristic for production scheduling on job-shop plants considering preventive maintenance tasks. Dyna; Vol. 81, núm. 187 (2014); 215-222 DYNA; Vol. 81, núm. 187 (2014); 215-222 2346-2183 0012-7353 .Heuristic for production scheduling on job-shop plants considering preventive maintenance tasksArtículo de revistainfo:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionhttp://purl.org/coar/resource_type/c_6501http://purl.org/coar/resource_type/c_2df8fbb1http://purl.org/coar/version/c_970fb48d4fbd8a85Texthttp://purl.org/redcol/resource_type/ARTsimultaneous programmingproduction schedulingpreventive maintenancelinear programming model.ORIGINAL46103-227066-1-PB.pdfapplication/pdf492458https://repositorio.unal.edu.co/bitstream/unal/50623/1/46103-227066-1-PB.pdf56247a8c701062fb922845d916c9fd92MD51THUMBNAIL46103-227066-1-PB.pdf.jpg46103-227066-1-PB.pdf.jpgGenerated Thumbnailimage/jpeg9503https://repositorio.unal.edu.co/bitstream/unal/50623/2/46103-227066-1-PB.pdf.jpg96ae85d2b6f2e0fd1547a7b8be17c919MD52unal/50623oai:repositorio.unal.edu.co:unal/506232022-12-21 23:04:02.507Repositorio Institucional Universidad Nacional de Colombiarepositorio_nal@unal.edu.co
dc.title.spa.fl_str_mv Heuristic for production scheduling on job-shop plants considering preventive maintenance tasks
title Heuristic for production scheduling on job-shop plants considering preventive maintenance tasks
spellingShingle Heuristic for production scheduling on job-shop plants considering preventive maintenance tasks
simultaneous programming
production scheduling
preventive maintenance
linear programming model.
title_short Heuristic for production scheduling on job-shop plants considering preventive maintenance tasks
title_full Heuristic for production scheduling on job-shop plants considering preventive maintenance tasks
title_fullStr Heuristic for production scheduling on job-shop plants considering preventive maintenance tasks
title_full_unstemmed Heuristic for production scheduling on job-shop plants considering preventive maintenance tasks
title_sort Heuristic for production scheduling on job-shop plants considering preventive maintenance tasks
dc.creator.fl_str_mv Díaz Cazaña, Ronald
Costa Salas, Yasel José
Sarache Castro, William Ariel
dc.contributor.author.spa.fl_str_mv Díaz Cazaña, Ronald
Costa Salas, Yasel José
Sarache Castro, William Ariel
dc.subject.proposal.spa.fl_str_mv simultaneous programming
production scheduling
preventive maintenance
linear programming model.
topic simultaneous programming
production scheduling
preventive maintenance
linear programming model.
description The simultaneous analysis of production scheduling and preventive maintenance task attracts special attention of researchers due to its complexity and therefore the necessity to seek efficient methods for solving this kind of combinatorial problems. This paper presents a heuristic approach to solve this issue on job shop plants. The solution method includes a linear programming model, based on the Traveling Salesman Problem, where the setup time is considered as distance measure. The method´s aim is to obtain a sequence of production orders and preventive maintenance tasks that reduce the idle time and the backlogs simultaneously, accomplishing the maintenance program. After finding an optimal solution for each machine a Correction Factor (CF) is determined as new distance measure. The CF considers the structure of the initial solution, the machine utilization and the product priorities. Then, the final solution is reached running the linear programming model using the distance updated values. Finally, the proposed heuristic is applied to real case study of the Cuban industry. The experimental results indicated a significant idle time reduction for the company under examination.
publishDate 2014
dc.date.issued.spa.fl_str_mv 2014-10-24
dc.date.accessioned.spa.fl_str_mv 2019-06-29T10:33:53Z
dc.date.available.spa.fl_str_mv 2019-06-29T10:33:53Z
dc.type.spa.fl_str_mv Artículo de revista
dc.type.coar.fl_str_mv http://purl.org/coar/resource_type/c_2df8fbb1
dc.type.driver.spa.fl_str_mv info:eu-repo/semantics/article
dc.type.version.spa.fl_str_mv info:eu-repo/semantics/publishedVersion
dc.type.coar.spa.fl_str_mv http://purl.org/coar/resource_type/c_6501
dc.type.coarversion.spa.fl_str_mv http://purl.org/coar/version/c_970fb48d4fbd8a85
dc.type.content.spa.fl_str_mv Text
dc.type.redcol.spa.fl_str_mv http://purl.org/redcol/resource_type/ART
format http://purl.org/coar/resource_type/c_6501
status_str publishedVersion
dc.identifier.uri.none.fl_str_mv https://repositorio.unal.edu.co/handle/unal/50623
dc.identifier.eprints.spa.fl_str_mv http://bdigital.unal.edu.co/44621/
url https://repositorio.unal.edu.co/handle/unal/50623
http://bdigital.unal.edu.co/44621/
dc.language.iso.spa.fl_str_mv spa
language spa
dc.relation.spa.fl_str_mv http://revistas.unal.edu.co/index.php/dyna/article/view/46103
dc.relation.ispartof.spa.fl_str_mv Universidad Nacional de Colombia Revistas electrónicas UN Dyna
Dyna
dc.relation.ispartofseries.none.fl_str_mv Dyna; Vol. 81, núm. 187 (2014); 215-222 DYNA; Vol. 81, núm. 187 (2014); 215-222 2346-2183 0012-7353
dc.relation.references.spa.fl_str_mv Díaz Cazaña, Ronald and Costa Salas, Yasel José and Sarache Castro, William Ariel (2014) Heuristic for production scheduling on job-shop plants considering preventive maintenance tasks. Dyna; Vol. 81, núm. 187 (2014); 215-222 DYNA; Vol. 81, núm. 187 (2014); 215-222 2346-2183 0012-7353 .
dc.rights.spa.fl_str_mv Derechos reservados - Universidad Nacional de Colombia
dc.rights.coar.fl_str_mv http://purl.org/coar/access_right/c_abf2
dc.rights.license.spa.fl_str_mv Atribución-NoComercial 4.0 Internacional
dc.rights.uri.spa.fl_str_mv http://creativecommons.org/licenses/by-nc/4.0/
dc.rights.accessrights.spa.fl_str_mv info:eu-repo/semantics/openAccess
rights_invalid_str_mv Atribución-NoComercial 4.0 Internacional
Derechos reservados - Universidad Nacional de Colombia
http://creativecommons.org/licenses/by-nc/4.0/
http://purl.org/coar/access_right/c_abf2
eu_rights_str_mv openAccess
dc.format.mimetype.spa.fl_str_mv application/pdf
dc.publisher.spa.fl_str_mv Universidad Nacional de Colombia Sede Medellín
institution Universidad Nacional de Colombia
bitstream.url.fl_str_mv https://repositorio.unal.edu.co/bitstream/unal/50623/1/46103-227066-1-PB.pdf
https://repositorio.unal.edu.co/bitstream/unal/50623/2/46103-227066-1-PB.pdf.jpg
bitstream.checksum.fl_str_mv 56247a8c701062fb922845d916c9fd92
96ae85d2b6f2e0fd1547a7b8be17c919
bitstream.checksumAlgorithm.fl_str_mv MD5
MD5
repository.name.fl_str_mv Repositorio Institucional Universidad Nacional de Colombia
repository.mail.fl_str_mv repositorio_nal@unal.edu.co
_version_ 1814089743199109120