Multicriteria methodology for decoupling point placement under production postponement strategy

The accelerated growth of global markets and the increased bargaining power of customers, has generated a highly competitive environment with a lot of risks for manufacturing companies. In response, the literature has shown mass customization and, in particular way, the postponement strategy as new...

Full description

Autores:
Gómez Jiménez, Iván Darío
Tipo de recurso:
Fecha de publicación:
2016
Institución:
Universidad Nacional de Colombia
Repositorio:
Universidad Nacional de Colombia
Idioma:
spa
OAI Identifier:
oai:repositorio.unal.edu.co:unal/57867
Acceso en línea:
https://repositorio.unal.edu.co/handle/unal/57867
http://bdigital.unal.edu.co/54319/
Palabra clave:
62 Ingeniería y operaciones afines / Engineering
67 Manufactura / Manufacturing
Aplazamiento en la producción
Metodología multicriterio
Personalización masiva
Punto de desacople
Sistemas de producción
Production postponement
Multicriteria methodology
Mass customization
Decoupling point
Production systems
Rights
openAccess
License
Atribución-NoComercial 4.0 Internacional
Description
Summary:The accelerated growth of global markets and the increased bargaining power of customers, has generated a highly competitive environment with a lot of risks for manufacturing companies. In response, the literature has shown mass customization and, in particular way, the postponement strategy as new paradigms of production that allows offering simultaneously high levels of flexibility and efficiency to consumers. Regarding this issue, the decoupling point location is positioned as the most important decision in the implementation of postponement. Starting from the importance of this topic and from a review of the state of the art, it was detected the need to develop a methodology to locate the decoupling point, by integrating qualitative and quantitative criteria and that additionally allows the participation of panel of experts. Thereby, this thesis shows the development of a new multi-criteria methodology; which consists of 7 steps that allow locating the decoupling point, in a production system, according to the needs of the system and relying on the experience and knowledge of experts. Additionally, in order to validate the performance of the methodology in real cases, two study cases developed in the companies Herragro S.A. and Muebles Marco Gomez, are presented