Estudio de geosintéticos usados para la rehabilitación de las patologías en el pavimento, relacionadas a las cámaras de inspección del tramo de la carrera 19c y calle 48c sur, barrio Tunal localidad de Tunjuelito, Bogotá.

This project was carried out due to the lack of studies on the subject of the implications that inspection cameras can have on pavement structures, currently the state of the road between Carrera 19c and Calle 48c Sur in the Tunal neighborhood has presented for more than ten years affectations in th...

Full description

Autores:
Lozano Flórez, Sergio Andrés
Tipo de recurso:
Trabajo de grado de pregrado
Fecha de publicación:
2022
Institución:
Universidad Antonio Nariño
Repositorio:
Repositorio UAN
Idioma:
spa
OAI Identifier:
oai:repositorio.uan.edu.co:123456789/7552
Acceso en línea:
http://repositorio.uan.edu.co/handle/123456789/7552
Palabra clave:
Geosintéticos
Pavimento
Cámaras de Inspección
Rehabilitación
T 48.22 L925e
Geosynthetics
Pavement
Inspection Chambers
Rehabilitation
Rights
openAccess
License
Attribution-NonCommercial-NoDerivatives 4.0 International (CC BY-NC-ND 4.0)
Description
Summary:This project was carried out due to the lack of studies on the subject of the implications that inspection cameras can have on pavement structures, currently the state of the road between Carrera 19c and Calle 48c Sur in the Tunal neighborhood has presented for more than ten years affectations in the same area, presenting a very short useful life due to more rehabilitations that are carried out on it, for this reason it is sought to implement a design alternative with the implementation of geosynthetics that allow to increase its useful life by mitigating the damage by improving its bearing capacity, resistance of its layers and a way to reduce leakage from the chambers to the structure. In this way, a pavement design is proposed using the FORTGRIND biaxial geosynthetic in the subbase and covering the structure of the inspection chamber, obtaining favorable results by reducing damage by 5% at the structural level and semiwaterproofing the area against possible leaks. providing a series of advantages when implementing this method in the pavement structure.