Diseño y Puesta En Marcha De Instalación Eléctrica Para Máquina Hielera AV400CR En Piscícola Berlín
To guarantee the cold chain in the production and transport process of tilapia for the company Piscícola Berlin S . A . S The support and accompaniment of the energy companies A&C ELECTRICIDAD INDUSTRIAL S . A . S and HAGESA GROUP S . A . S was requir ed for the design and implementation of an e...
- Autores:
-
Pérez Jaramillo, Andrew Jordy
- Tipo de recurso:
- Trabajo de grado de pregrado
- Fecha de publicación:
- 2021
- Institución:
- Universidad Antonio Nariño
- Repositorio:
- Repositorio UAN
- Idioma:
- spa
- OAI Identifier:
- oai:repositorio.uan.edu.co:123456789/6294
- Acceso en línea:
- http://repositorio.uan.edu.co/handle/123456789/6294
https://www.larepublica.co/especiales/estado-de-la-economia-2020/balance-yperspectivas-del-sector-de-generacion-electrica-para-los-proximos-anos-2960063
https://www1.upme.gov.co/PromocionSector/SeccionesInteres/Documents/Boletines/Bol etin_Estadistico_2018.pdf
http://prepaenlineaaliciaaine.blogspot.com/2017/05/cargas-y-campos-electricos.html Colcha Chacón, A. M. (2015). ANÁLISIS TÉCNICO ECONÓMICO PARA LA ELECTRIFICACIÓN DEL RECINTO 10 DE AGOSTO UBICADO EN EL CANTÓN LA TRONCAL, PROVINCIA DEL CAÑAR, UTILIZANDO ENERGÍA CONVENCIONAL TRIFÁSICA.
https://www.foronuclear.org/descubre-la-energia-nuclear/preguntas-y-respuestas/sobredistintas-fuentes-de-energia/que-es-la-electricidad/
https://riunet.upv.es/bitstream/handle/10251/53520/TFG%20Ferran%20Cremades%20G radol%c3%ad_1436215519961934505705600412513.pdf?sequence=2&isAllowed=y
- Palabra clave:
- Instalación eléctrica
Gestión energética
Voltaje
Corriente
Temperatura
Piscicultura
RETIE.
Electrical installation
Energy management,
Voltage
Current
Temperature
Fish farming
RETIE.
- Rights
- openAccess
- License
- Attribution-NonCommercial-NoDerivatives 4.0 International (CC BY-NC-ND 4.0)
Summary: | To guarantee the cold chain in the production and transport process of tilapia for the company Piscícola Berlin S . A . S The support and accompaniment of the energy companies A&C ELECTRICIDAD INDUSTRIAL S . A . S and HAGESA GROUP S . A . S was requir ed for the design and implementation of an energy system as an account New that guarantees the correct operation of an Ice Machine type AV400CR. The work is based on a correct understanding and implementation of all the parameters, rules and norms that the E RETIE governs and that is required as a requirement for the supply of energy by lectrificadora del Huila (Electro Huila). The total energy demand was calculated from the data related to the location and the intensity of current required together with the knowledge of the operating modes of this equipment. From these data, the necessary power of the power supply, load transformation and the number of elements necessary for an adequate installation, measurement and distribution of energy was obtained. |
---|