Pasantía proyecto Iflat 63 Seny SAS

An internship was carried out in the Iflat 63 project of the Seny SAS Construction Company, in the town of Chapinero on Calle 63 # 9-40 Bogotá, several construction processes were worked on, including the structure, gray work and white work, where They handled and carried out quantities of work with...

Full description

Autores:
Acosta Ávila, Maciel Esther
Tipo de recurso:
Trabajo de grado de pregrado
Fecha de publicación:
2022
Institución:
Universidad Antonio Nariño
Repositorio:
Repositorio UAN
Idioma:
spa
OAI Identifier:
oai:repositorio.uan.edu.co:123456789/7535
Acceso en línea:
http://repositorio.uan.edu.co/handle/123456789/7535
Palabra clave:
estructura
obra gris
obra blanca
T48.23 A185p
structure
gray work
white work
Rights
closedAccess
License
Attribution-NonCommercial-NoDerivatives 4.0 International (CC BY-NC-ND 4.0)
id UAntonioN2_86a4b73264d45cfa513a2ce8eee51608
oai_identifier_str oai:repositorio.uan.edu.co:123456789/7535
network_acronym_str UAntonioN2
network_name_str Repositorio UAN
repository_id_str
dc.title.es_ES.fl_str_mv Pasantía proyecto Iflat 63 Seny SAS
title Pasantía proyecto Iflat 63 Seny SAS
spellingShingle Pasantía proyecto Iflat 63 Seny SAS
estructura
obra gris
obra blanca
T48.23 A185p
structure
gray work
white work
title_short Pasantía proyecto Iflat 63 Seny SAS
title_full Pasantía proyecto Iflat 63 Seny SAS
title_fullStr Pasantía proyecto Iflat 63 Seny SAS
title_full_unstemmed Pasantía proyecto Iflat 63 Seny SAS
title_sort Pasantía proyecto Iflat 63 Seny SAS
dc.creator.fl_str_mv Acosta Ávila, Maciel Esther
dc.contributor.advisor.spa.fl_str_mv Molina Gallego, Carlos Martin
dc.contributor.author.spa.fl_str_mv Acosta Ávila, Maciel Esther
dc.subject.es_ES.fl_str_mv estructura
obra gris
obra blanca
topic estructura
obra gris
obra blanca
T48.23 A185p
structure
gray work
white work
dc.subject.ddc.es_ES.fl_str_mv T48.23 A185p
dc.subject.keyword.es_ES.fl_str_mv structure
gray work
white work
description An internship was carried out in the Iflat 63 project of the Seny SAS Construction Company, in the town of Chapinero on Calle 63 # 9-40 Bogotá, several construction processes were worked on, including the structure, gray work and white work, where They handled and carried out quantities of work with their orders. On the other hand, in the development of the administration system, the billing and budget were managed, for which basic concepts were used for the applicability in the development of the activity, additionally, a manageability of the schedule was made where it shows some nonconformities and it was carried out a readjustment in the programming of the work so that its delivery times were met and optimal performance was obtained. Finally, an analysis work was carried out by the work team in which quantities and prices were verified, revealing some flaws in the initial budget and a restructuring of the same was made for delivery to the directors.
publishDate 2022
dc.date.issued.spa.fl_str_mv 2022-11-30
dc.date.accessioned.none.fl_str_mv 2023-02-14T20:20:33Z
dc.date.available.none.fl_str_mv 2023-02-14T20:20:33Z
dc.type.spa.fl_str_mv Trabajo de grado (Pregrado y/o Especialización)
dc.type.coar.spa.fl_str_mv http://purl.org/coar/resource_type/c_7a1f
dc.type.coarversion.none.fl_str_mv http://purl.org/coar/version/c_970fb48d4fbd8a85
format http://purl.org/coar/resource_type/c_7a1f
dc.identifier.uri.none.fl_str_mv http://repositorio.uan.edu.co/handle/123456789/7535
dc.identifier.bibliographicCitation.spa.fl_str_mv (18 de junio de 2013). Obtenido de Obras por expansion: https://obras.expansion.mx/construccion/2013/06/19/la-medida-exacta
Albiol, X. F. (2018). Costes directos, indirectos y gastos generales de una obra. Telemalte , 1.
Arcus global. (2017). Funciones de un maestro de contruccion. Mexico.
Arqhys Contenidos. (2022). Estructuras de ingenieria. Arqhys, 1. Obtenido de https://www.arqhys.com/contenidos/estructuras-ingenieria.html
Cifuentes, D. L. (2015). HISTORIA DE LA INGENIERIA CIVIL: RECONOCIMIENTO DE LOS ESCENARIOS OCUPACIONALES DE LA INGENIERIA CIVIL EN COLOMBIA, EN FUNCION DE LAS NECESIDADES DE INFRAESTRUCTURA Y DE LAS TENDENCIAS DE FORMACION. Bogota
contraloría general de medellin. (2019). CIRCULAR No.01. Medellin. Obtenido de https://www.cgm.gov.co/cgm/Paginaweb/N/Resoluciones%20Circulares%20y%20Otros %20actos%20administr11/001%20Circular%20AIU%20De%202019%20Directrices%20 De%20La%20Contralora%20201900001283.pdf
Contreras, A. G. (2018). LA OBRA GRIS EN LA EDIFICACION BASICA. Nuevo leon. Obtenido de http://eprints.uanl.mx/20638/1/20638.pdf
Gerencie.com. (2022).
Guillermo, C. A. (2011). DiSEÑO DE UN PL AN DE MEJORAS . Guayaquil: repositorios. Obtenido de https://docplayer.es/164916743-Universidad-de-guayaquil-facultad-defilosofia-letras-y-ciencias-de-la-educacion-instituto-superior-de-postgrado-y-educacioncontinua.html
Massieu, W. (2008). ACABADOS EN LA CONSTRUCCIÓN. MEXICO. Obtenido de https://www.ipn.mx/assets/files/cecyt11/docs/Guias/UATecnologicas/Construccion/5toSe mestre/acabados-en-construccion.pdf
dc.identifier.instname.spa.fl_str_mv instname:Universidad Antonio Nariño
dc.identifier.reponame.spa.fl_str_mv reponame:Repositorio Institucional UAN
dc.identifier.repourl.spa.fl_str_mv repourl:https://repositorio.uan.edu.co/
url http://repositorio.uan.edu.co/handle/123456789/7535
identifier_str_mv (18 de junio de 2013). Obtenido de Obras por expansion: https://obras.expansion.mx/construccion/2013/06/19/la-medida-exacta
Albiol, X. F. (2018). Costes directos, indirectos y gastos generales de una obra. Telemalte , 1.
Arcus global. (2017). Funciones de un maestro de contruccion. Mexico.
Arqhys Contenidos. (2022). Estructuras de ingenieria. Arqhys, 1. Obtenido de https://www.arqhys.com/contenidos/estructuras-ingenieria.html
Cifuentes, D. L. (2015). HISTORIA DE LA INGENIERIA CIVIL: RECONOCIMIENTO DE LOS ESCENARIOS OCUPACIONALES DE LA INGENIERIA CIVIL EN COLOMBIA, EN FUNCION DE LAS NECESIDADES DE INFRAESTRUCTURA Y DE LAS TENDENCIAS DE FORMACION. Bogota
contraloría general de medellin. (2019). CIRCULAR No.01. Medellin. Obtenido de https://www.cgm.gov.co/cgm/Paginaweb/N/Resoluciones%20Circulares%20y%20Otros %20actos%20administr11/001%20Circular%20AIU%20De%202019%20Directrices%20 De%20La%20Contralora%20201900001283.pdf
Contreras, A. G. (2018). LA OBRA GRIS EN LA EDIFICACION BASICA. Nuevo leon. Obtenido de http://eprints.uanl.mx/20638/1/20638.pdf
Gerencie.com. (2022).
Guillermo, C. A. (2011). DiSEÑO DE UN PL AN DE MEJORAS . Guayaquil: repositorios. Obtenido de https://docplayer.es/164916743-Universidad-de-guayaquil-facultad-defilosofia-letras-y-ciencias-de-la-educacion-instituto-superior-de-postgrado-y-educacioncontinua.html
Massieu, W. (2008). ACABADOS EN LA CONSTRUCCIÓN. MEXICO. Obtenido de https://www.ipn.mx/assets/files/cecyt11/docs/Guias/UATecnologicas/Construccion/5toSe mestre/acabados-en-construccion.pdf
instname:Universidad Antonio Nariño
reponame:Repositorio Institucional UAN
repourl:https://repositorio.uan.edu.co/
dc.language.iso.spa.fl_str_mv spa
language spa
dc.rights.none.fl_str_mv Acceso a solo metadatos
dc.rights.license.spa.fl_str_mv Attribution-NonCommercial-NoDerivatives 4.0 International (CC BY-NC-ND 4.0)
dc.rights.uri.spa.fl_str_mv https://creativecommons.org/licenses/by-nc-nd/4.0/
dc.rights.accessrights.spa.fl_str_mv info:eu-repo/semantics/closedAccess
dc.rights.coar.spa.fl_str_mv http://purl.org/coar/access_right/c_14cb
rights_invalid_str_mv Attribution-NonCommercial-NoDerivatives 4.0 International (CC BY-NC-ND 4.0)
Acceso a solo metadatos
https://creativecommons.org/licenses/by-nc-nd/4.0/
http://purl.org/coar/access_right/c_14cb
eu_rights_str_mv closedAccess
dc.publisher.spa.fl_str_mv Universidad Antonio Nariño
dc.publisher.program.spa.fl_str_mv Ingeniería Civil
dc.publisher.faculty.spa.fl_str_mv Facultad de Ingeniería Civil
dc.publisher.campus.spa.fl_str_mv Bogotá - Sur
institution Universidad Antonio Nariño
bitstream.url.fl_str_mv https://repositorio.uan.edu.co/bitstreams/89dca5cc-1a4b-460a-83f6-d6532238c4db/download
https://repositorio.uan.edu.co/bitstreams/0ad21b05-655b-4121-935a-12846a9849d4/download
https://repositorio.uan.edu.co/bitstreams/101bf633-643a-4929-a037-7a145d22c3a5/download
https://repositorio.uan.edu.co/bitstreams/33383730-fa87-420f-b8cf-fb98385466b9/download
bitstream.checksum.fl_str_mv 98ed7b21368150968b764433ff60c71d
54b3a0e5345740965c11634911515c96
c5e1c495a78f677c2c05a8af6aca597c
9868ccc48a14c8d591352b6eaf7f6239
bitstream.checksumAlgorithm.fl_str_mv MD5
MD5
MD5
MD5
repository.name.fl_str_mv Repositorio Institucional UAN
repository.mail.fl_str_mv alertas.repositorio@uan.edu.co
_version_ 1814300335088336896
spelling Attribution-NonCommercial-NoDerivatives 4.0 International (CC BY-NC-ND 4.0)Acceso a solo metadatoshttps://creativecommons.org/licenses/by-nc-nd/4.0/info:eu-repo/semantics/closedAccesshttp://purl.org/coar/access_right/c_14cbMolina Gallego, Carlos MartinAcosta Ávila, Maciel Esther104818175582023-02-14T20:20:33Z2023-02-14T20:20:33Z2022-11-30http://repositorio.uan.edu.co/handle/123456789/7535(18 de junio de 2013). Obtenido de Obras por expansion: https://obras.expansion.mx/construccion/2013/06/19/la-medida-exactaAlbiol, X. F. (2018). Costes directos, indirectos y gastos generales de una obra. Telemalte , 1.Arcus global. (2017). Funciones de un maestro de contruccion. Mexico.Arqhys Contenidos. (2022). Estructuras de ingenieria. Arqhys, 1. Obtenido de https://www.arqhys.com/contenidos/estructuras-ingenieria.htmlCifuentes, D. L. (2015). HISTORIA DE LA INGENIERIA CIVIL: RECONOCIMIENTO DE LOS ESCENARIOS OCUPACIONALES DE LA INGENIERIA CIVIL EN COLOMBIA, EN FUNCION DE LAS NECESIDADES DE INFRAESTRUCTURA Y DE LAS TENDENCIAS DE FORMACION. Bogotacontraloría general de medellin. (2019). CIRCULAR No.01. Medellin. Obtenido de https://www.cgm.gov.co/cgm/Paginaweb/N/Resoluciones%20Circulares%20y%20Otros %20actos%20administr11/001%20Circular%20AIU%20De%202019%20Directrices%20 De%20La%20Contralora%20201900001283.pdfContreras, A. G. (2018). LA OBRA GRIS EN LA EDIFICACION BASICA. Nuevo leon. Obtenido de http://eprints.uanl.mx/20638/1/20638.pdfGerencie.com. (2022).Guillermo, C. A. (2011). DiSEÑO DE UN PL AN DE MEJORAS . Guayaquil: repositorios. Obtenido de https://docplayer.es/164916743-Universidad-de-guayaquil-facultad-defilosofia-letras-y-ciencias-de-la-educacion-instituto-superior-de-postgrado-y-educacioncontinua.htmlMassieu, W. (2008). ACABADOS EN LA CONSTRUCCIÓN. MEXICO. Obtenido de https://www.ipn.mx/assets/files/cecyt11/docs/Guias/UATecnologicas/Construccion/5toSe mestre/acabados-en-construccion.pdfinstname:Universidad Antonio Nariñoreponame:Repositorio Institucional UANrepourl:https://repositorio.uan.edu.co/An internship was carried out in the Iflat 63 project of the Seny SAS Construction Company, in the town of Chapinero on Calle 63 # 9-40 Bogotá, several construction processes were worked on, including the structure, gray work and white work, where They handled and carried out quantities of work with their orders. On the other hand, in the development of the administration system, the billing and budget were managed, for which basic concepts were used for the applicability in the development of the activity, additionally, a manageability of the schedule was made where it shows some nonconformities and it was carried out a readjustment in the programming of the work so that its delivery times were met and optimal performance was obtained. Finally, an analysis work was carried out by the work team in which quantities and prices were verified, revealing some flaws in the initial budget and a restructuring of the same was made for delivery to the directors.Se realizó una pasantía en el proyecto Iflat 63 de la constructora Seny SAS, en la localidad de Chapinero en la calle 63 # 9-40 Bogotá, se trabajaron varios procesos de la construcción entre ellos la estructura, obra gris y obra blanca, donde se manejaron y se realizaron cantidades de obra con pedidos de los mismos. Por otra parte, en el desarrollo del sistema de administración se dio manejo a la facturación y presupuesto, para ello se utilizaron conceptos básicos para la aplicabilidad en el desarrollo de la actividad, adicionalmente se hizo una manejabilidad del cronograma donde muestra algunas inconformidades y se realizó un reajuste en la programación de la obra para que sus tiempos de entrega fueran cumplidos y se obtuviera un óptimo rendimiento. Por último, se realizó un trabajo de análisis por el equipo de obra en el que se verificaron cantidades y precios dejando en evidencia algunas fallas en el presupuesto inicial y se hizo una reestructuración del mismo para entrega a los directivos.Ingeniero(a) CivilPregradoPresencialPasantíaspaUniversidad Antonio NariñoIngeniería CivilFacultad de Ingeniería CivilBogotá - Surestructuraobra grisobra blancaT48.23 A185pstructuregray workwhite workPasantía proyecto Iflat 63 Seny SASTrabajo de grado (Pregrado y/o Especialización)http://purl.org/coar/resource_type/c_7a1fhttp://purl.org/coar/version/c_970fb48d4fbd8a85EspecializadaORIGINAL2023_Maciel Esther Acosta Ávila_Acta.pdf2023_Maciel Esther Acosta Ávila_Acta.pdfapplication/pdf201825https://repositorio.uan.edu.co/bitstreams/89dca5cc-1a4b-460a-83f6-d6532238c4db/download98ed7b21368150968b764433ff60c71dMD512023_Maciel Esther Acosta Ávila_Autorización.pdf2023_Maciel Esther Acosta Ávila_Autorización.pdfapplication/pdf577991https://repositorio.uan.edu.co/bitstreams/0ad21b05-655b-4121-935a-12846a9849d4/download54b3a0e5345740965c11634911515c96MD522023_Maciel Esther Acosta Ávila.pdf2023_Maciel Esther Acosta Ávila.pdfapplication/pdf1805614https://repositorio.uan.edu.co/bitstreams/101bf633-643a-4929-a037-7a145d22c3a5/downloadc5e1c495a78f677c2c05a8af6aca597cMD53CC-LICENSElicense_rdflicense_rdfapplication/rdf+xml; charset=utf-8811https://repositorio.uan.edu.co/bitstreams/33383730-fa87-420f-b8cf-fb98385466b9/download9868ccc48a14c8d591352b6eaf7f6239MD54123456789/7535oai:repositorio.uan.edu.co:123456789/75352024-10-09 23:34:43.721https://creativecommons.org/licenses/by-nc-nd/4.0/Acceso a solo metadatosrestrictedhttps://repositorio.uan.edu.coRepositorio Institucional UANalertas.repositorio@uan.edu.co