Propuesta para el rediseño del plan de Mantenimiento del Remolcador Cartagena de la empresa Naviera Central ubicada en la ciudad de Barranquilla Atlántico

A proposal is presented to generate a redesign of an operational maintenance plan for a series of machinery components of the Cartagena Tugboat from the Central Shipping Company, a tug used for river transport from the port of Barrancabermeja to the port of Cartagena. The main purpose of the proposa...

Full description

Autores:
Almeida Garrido, Federico Ángel
Vega López, Camilo José
Tipo de recurso:
Trabajo de grado de pregrado
Fecha de publicación:
2022
Institución:
Universidad Antonio Nariño
Repositorio:
Repositorio UAN
Idioma:
spa
OAI Identifier:
oai:repositorio.uan.edu.co:123456789/6833
Acceso en línea:
http://repositorio.uan.edu.co/handle/123456789/6833
Palabra clave:
Gestión de la Productividad, la Competitividad y la Innovación
Management of Productivity, Competitiveness and Innovation
Rights
openAccess
License
Attribution-NonCommercial-NoDerivatives 4.0 International (CC BY-NC-ND 4.0)
Description
Summary:A proposal is presented to generate a redesign of an operational maintenance plan for a series of machinery components of the Cartagena Tugboat from the Central Shipping Company, a tug used for river transport from the port of Barrancabermeja to the port of Cartagena. The main purpose of the proposal is the opportunity to extend the useful life of the components of this tugboat, which in turn allows to contribute to the productivity of the organization by decreasing the replacement of components due to unexpected failures, the reduction of costs and unplanned resources. For the redesign of the maintenance plan in its development phase, an analysis of the current maintenance processes of the Cartagena Tugboat equipment must be carried out, and with it methods and tools focused on the preventive maintenance methodology are applied. With this, generate a new maintenance planning route for the equipment of the Cartagena Tugboat, improving the use of resources and operating times.