Estandarización del proceso de obras civiles en el senado de la república

Public and private organizations are carrying out standardization processes that allow the application of different industrial engineering tools to eliminate activities that don’t add value. In the case of the Senate of the Republic, which is committed to the proper management of the waste generated...

Full description

Autores:
Torres Camargo, Laura Alexandra
Riaño Gutierrez, Luz Dary
Fuentes Rojas, Ever Ángel
Tipo de recurso:
Fecha de publicación:
2021
Institución:
Universidad Santo Tomás
Repositorio:
Repositorio Institucional USTA
Idioma:
spa
OAI Identifier:
oai:repository.usta.edu.co:11634/41672
Acceso en línea:
http://revistas.ustatunja.edu.co/index.php/ingeniomagno/article/view/2307
http://hdl.handle.net/11634/41672
Palabra clave:
procedures
standardization
time
indicators
waste
procedimientos
estandarización
tiempos
indicadores
residuos
procedimento
padronização
tempo
indicadores
resíduos
Rights
License
Derechos de autor 2021 Ingenio Magno
Description
Summary:Public and private organizations are carrying out standardization processes that allow the application of different industrial engineering tools to eliminate activities that don’t add value. In the case of the Senate of the Republic, which is committed to the proper management of the waste generated in civil works and part of the processes of continuous improvement, standardization is proposed based on a diagnosis of the current situation and the search of the procedures that are performed. For the development of the project, we worked a mixed background investigation, since it offers the possibility of generating calculations to express quantifiable results and we performed the description of the data obtained. We gave fulfilment to mentioned items and an analysis of the current situation is made, the documentation is carried out and six quantifiable indicators are proposed. Three procedures are proposed which the necessary formats for the management and final disposal of the waste generated are included, the times are addressed through experts and the impact evaluation is made using the logical framework matrix where the three most important achievements in the development of the project.