Diseño de un plan acción para la reducción del tiempo de ciclo en la línea de producción de tops en la organización Tulipán S.A.S.

The project of reduction of manufacturing cycle times in the line of tops, was carried out in the company Tulipán SAS, an PYME located in the city of Santiago de Cali, which had as objective to reduce to 22 minutes the manufacturing time of each unit of top, which was in 26.9 minutes, because of the...

Full description

Autores:
Cardona Cuero, Andrés Felipe
Vela Ospina, Juan David
Tipo de recurso:
Fecha de publicación:
2018
Institución:
Universidad de San Buenaventura
Repositorio:
Repositorio USB
Idioma:
spa
OAI Identifier:
oai:bibliotecadigital.usb.edu.co:10819/5543
Acceso en línea:
http://hdl.handle.net/10819/5543
Palabra clave:
5’s, Kanban
Reducción de tiempos de fabricación
Lean Six Sigma
Reduction of manufacturing times
Lean Six Sigma
Six Sigma (Normas de control de calidad)
Estudios de tiempos y movimientos
Mejoramientos de procesos
Rights
License
Atribución-NoComercial-SinDerivadas 2.5 Colombia
Description
Summary:The project of reduction of manufacturing cycle times in the line of tops, was carried out in the company Tulipán SAS, an PYME located in the city of Santiago de Cali, which had as objective to reduce to 22 minutes the manufacturing time of each unit of top, which was in 26.9 minutes, because of the above the company lost retail sales and generated inconvenience among its customers by request. For the elaboration of this project, the Lean Six Sigma philosophy applied with the DMAIC methodology was used, reducing waste, variability and manufacturing times. We obtained 3 root causes on which the actions were carried out, the improvements were implemented and the impact of each one was studied separately and, a final control was carried out with all the improvements implemented, which was achieved by an adjusted and focused process, managing to produce 47.5% of the tops manufactured within the specifications, which previously did not occur at all.