Design of a methodology to generate a maintenance plan through the integration of RCM, WCM and Lean Manufacturing in wire drawing processes
The development of five phases based on Design Thinking (Empathize, Define, Ideate, Prototype, Evaluate) is presented in order to design a methodology integrating Reliability Centered Maintenance (RCM), World Class Manufacturing (WCM) and Lean Manufacturing tools, which allows generating a maintenan...
- Autores:
- Tipo de recurso:
- Article of journal
- Fecha de publicación:
- 2020
- Institución:
- Universidad Católica de Pereira
- Repositorio:
- Repositorio Institucional - RIBUC
- Idioma:
- spa
- OAI Identifier:
- oai:repositorio.ucp.edu.co:10785/10019
- Acceso en línea:
- https://revistas.ucp.edu.co/index.php/entrecienciaeingenieria/article/view/1793
http://hdl.handle.net/10785/10019
- Palabra clave:
- Rights
- openAccess
- License
- Derechos de autor 2020 Entre Ciencia e Ingeniería
id |
RepoRIBUC2_210fb5048caba5210561d5f5d74d8723 |
---|---|
oai_identifier_str |
oai:repositorio.ucp.edu.co:10785/10019 |
network_acronym_str |
RepoRIBUC2 |
network_name_str |
Repositorio Institucional - RIBUC |
repository_id_str |
|
spelling |
2022-06-01T19:09:05Z2022-06-01T19:09:05Z2020-07-19https://revistas.ucp.edu.co/index.php/entrecienciaeingenieria/article/view/179310.31908/19098367.1793http://hdl.handle.net/10785/10019The development of five phases based on Design Thinking (Empathize, Define, Ideate, Prototype, Evaluate) is presented in order to design a methodology integrating Reliability Centered Maintenance (RCM), World Class Manufacturing (WCM) and Lean Manufacturing tools, which allows generating a maintenance plan applicable in wire drawing processes, particularly in a Mexican company in the steel sector. In the "Empathize, Define and Devise" phases, the main problems in processes of the steel sector of Colombian companies and one in Mexico are identified, proposing solution alternatives based on needs and realities, considering the expected Key Performance Indicators (KPI). Subsequently, tools are selected according to the problem and the alternative solutions proposed. In the "Prototype and Evaluate" phases, the selected tools are integrated, generating a maintenance plan which is described and represented by a diagram as an evaluation of the designed methodology.Se presenta el desarrollo de cinco fases basadas en el Design Thinking (Empatizar, Definir, Idear, Prototipar, Evaluar) con el propósito de diseñar una metodología integrando herramientas de Reliability Centered Maintenance (RCM), World Class Manufacturing (WCM) y Lean Manufacturing, la cual permita generar un plan de mantenimiento aplicable en procesos de trefilado de alambrón particularmente en una empresa mexicana del sector del acero. En las fases “Empatizar, Definir e Idear”, se identifican los problemas principales en procesos del sector del acero de empresas colombianas y una en México, planteando alternativas de solución basadas en las necesidades y realidades, considerando los Key Perfomance Indicators (KPI) esperados. Posteriormente se seleccionan herramientas acordes al problema y a las alternativas de solución planteadas. En las fases “Prototipar y Evaluar”, se integran las herramientas seleccionadas generando un plan de mantenimiento el cual es descrito y representado por un diagrama como evaluación de la metodología diseñada.application/pdfspaUniversidad Católica de Pereirahttps://revistas.ucp.edu.co/index.php/entrecienciaeingenieria/article/view/1793/1702Derechos de autor 2020 Entre Ciencia e Ingenieríahttps://creativecommons.org/licenses/by-nc/4.0/deed.es_EShttps://creativecommons.org/licenses/by-nc/4.0/deed.es_ESinfo:eu-repo/semantics/openAccesshttp://purl.org/coar/access_right/c_abf2Entre ciencia e ingeniería; Vol 14 No 27 (2020); 82-90Entre Ciencia e Ingeniería; Vol. 14 Núm. 27 (2020); 82-90Entre ciencia e ingeniería; v. 14 n. 27 (2020); 82-902539-41691909-8367Design of a methodology to generate a maintenance plan through the integration of RCM, WCM and Lean Manufacturing in wire drawing processesDiseño de una metodología para generar un plan de mantenimiento a través de la integración de RCM, WCM y Lean Manufacturing aplicable en procesos de trefilado de alambrónArtículo de revistahttp://purl.org/coar/resource_type/c_6501http://purl.org/coar/resource_type/c_2df8fbb1http://purl.org/coar/version/c_970fb48d4fbd8a85info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionPérez Adán, EmilioCastiblanco-Jiménez, IvonneMateo Díaz, Nicolás FranciscoPublication10785/10019oai:repositorio.ucp.edu.co:10785/100192025-01-27 18:59:43.209https://creativecommons.org/licenses/by-nc/4.0/deed.es_ESDerechos de autor 2020 Entre Ciencia e Ingenieríametadata.onlyhttps://repositorio.ucp.edu.coRepositorio Institucional de la Universidad Católica de Pereira - RIBUCbdigital@metabiblioteca.com |
dc.title.eng.fl_str_mv |
Design of a methodology to generate a maintenance plan through the integration of RCM, WCM and Lean Manufacturing in wire drawing processes |
dc.title.spa.fl_str_mv |
Diseño de una metodología para generar un plan de mantenimiento a través de la integración de RCM, WCM y Lean Manufacturing aplicable en procesos de trefilado de alambrón |
title |
Design of a methodology to generate a maintenance plan through the integration of RCM, WCM and Lean Manufacturing in wire drawing processes |
spellingShingle |
Design of a methodology to generate a maintenance plan through the integration of RCM, WCM and Lean Manufacturing in wire drawing processes |
title_short |
Design of a methodology to generate a maintenance plan through the integration of RCM, WCM and Lean Manufacturing in wire drawing processes |
title_full |
Design of a methodology to generate a maintenance plan through the integration of RCM, WCM and Lean Manufacturing in wire drawing processes |
title_fullStr |
Design of a methodology to generate a maintenance plan through the integration of RCM, WCM and Lean Manufacturing in wire drawing processes |
title_full_unstemmed |
Design of a methodology to generate a maintenance plan through the integration of RCM, WCM and Lean Manufacturing in wire drawing processes |
title_sort |
Design of a methodology to generate a maintenance plan through the integration of RCM, WCM and Lean Manufacturing in wire drawing processes |
description |
The development of five phases based on Design Thinking (Empathize, Define, Ideate, Prototype, Evaluate) is presented in order to design a methodology integrating Reliability Centered Maintenance (RCM), World Class Manufacturing (WCM) and Lean Manufacturing tools, which allows generating a maintenance plan applicable in wire drawing processes, particularly in a Mexican company in the steel sector. In the "Empathize, Define and Devise" phases, the main problems in processes of the steel sector of Colombian companies and one in Mexico are identified, proposing solution alternatives based on needs and realities, considering the expected Key Performance Indicators (KPI). Subsequently, tools are selected according to the problem and the alternative solutions proposed. In the "Prototype and Evaluate" phases, the selected tools are integrated, generating a maintenance plan which is described and represented by a diagram as an evaluation of the designed methodology. |
publishDate |
2020 |
dc.date.issued.none.fl_str_mv |
2020-07-19 |
dc.date.accessioned.none.fl_str_mv |
2022-06-01T19:09:05Z |
dc.date.available.none.fl_str_mv |
2022-06-01T19:09:05Z |
dc.type.spa.fl_str_mv |
Artículo de revista |
dc.type.coar.fl_str_mv |
http://purl.org/coar/resource_type/c_2df8fbb1 |
dc.type.coar.none.fl_str_mv |
http://purl.org/coar/resource_type/c_6501 |
dc.type.coarversion.none.fl_str_mv |
http://purl.org/coar/version/c_970fb48d4fbd8a85 |
dc.type.driver.none.fl_str_mv |
info:eu-repo/semantics/article |
dc.type.version.none.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
format |
http://purl.org/coar/resource_type/c_6501 |
status_str |
publishedVersion |
dc.identifier.none.fl_str_mv |
https://revistas.ucp.edu.co/index.php/entrecienciaeingenieria/article/view/1793 10.31908/19098367.1793 |
dc.identifier.uri.none.fl_str_mv |
http://hdl.handle.net/10785/10019 |
url |
https://revistas.ucp.edu.co/index.php/entrecienciaeingenieria/article/view/1793 http://hdl.handle.net/10785/10019 |
identifier_str_mv |
10.31908/19098367.1793 |
dc.language.none.fl_str_mv |
spa |
language |
spa |
dc.relation.none.fl_str_mv |
https://revistas.ucp.edu.co/index.php/entrecienciaeingenieria/article/view/1793/1702 |
dc.rights.spa.fl_str_mv |
Derechos de autor 2020 Entre Ciencia e Ingeniería https://creativecommons.org/licenses/by-nc/4.0/deed.es_ES |
dc.rights.uri.spa.fl_str_mv |
https://creativecommons.org/licenses/by-nc/4.0/deed.es_ES |
dc.rights.accessrights.spa.fl_str_mv |
info:eu-repo/semantics/openAccess |
dc.rights.coar.spa.fl_str_mv |
http://purl.org/coar/access_right/c_abf2 |
rights_invalid_str_mv |
Derechos de autor 2020 Entre Ciencia e Ingeniería https://creativecommons.org/licenses/by-nc/4.0/deed.es_ES http://purl.org/coar/access_right/c_abf2 |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf |
dc.publisher.spa.fl_str_mv |
Universidad Católica de Pereira |
dc.source.eng.fl_str_mv |
Entre ciencia e ingeniería; Vol 14 No 27 (2020); 82-90 |
dc.source.spa.fl_str_mv |
Entre Ciencia e Ingeniería; Vol. 14 Núm. 27 (2020); 82-90 |
dc.source.por.fl_str_mv |
Entre ciencia e ingeniería; v. 14 n. 27 (2020); 82-90 |
dc.source.none.fl_str_mv |
2539-4169 1909-8367 |
institution |
Universidad Católica de Pereira |
repository.name.fl_str_mv |
Repositorio Institucional de la Universidad Católica de Pereira - RIBUC |
repository.mail.fl_str_mv |
bdigital@metabiblioteca.com |
_version_ |
1828143460985602048 |