Problems of production lines in parallel machines with lapses: Mathematical modelling
Production programming consists of assigning, sequencing and timing tasks leading to the acquisition of physical assets in productive resources. Normally, we talk about "jobs" to be sequenced in "machines" so that the result of the production programming is shown in the form of a...
- Autores:
-
HERNANDEZ SUAREZ, CESAR AUGUSTO
Prada Nuñez, Raul
Prada, R
- Tipo de recurso:
- Article of journal
- Fecha de publicación:
- 2019
- Institución:
- Universidad Francisco de Paula Santander
- Repositorio:
- Repositorio Digital UFPS
- Idioma:
- eng
- OAI Identifier:
- oai:repositorio.ufps.edu.co:ufps/982
- Acceso en línea:
- http://repositorio.ufps.edu.co/handle/ufps/982
- Palabra clave:
- Rights
- openAccess
- License
- Atribución 4.0 Internacional (CC BY 4.0)
Summary: | Production programming consists of assigning, sequencing and timing tasks leading to the acquisition of physical assets in productive resources. Normally, we talk about "jobs" to be sequenced in "machines" so that the result of the production programming is shown in the form of a Gantt chart where each job is divided into as many tasks as necessary and each task is executed in the machines of the factory as technologically necessary. In the productive reality several machines are observed in each stage of the production process, which suggests a problem of hybrid flow workshop type (HFS). However, in some companies a machine of each stage is joined by conveyor belts. All these machines would behave like a single virtual machine since the works enter in order in the first machine and that order is maintained until the last machine, without allowing neither stops nor changes in the sequence. Then in a modelling approach, it is suggested to reduce the problem of (HFS) to a problem with several production lines in parallel where each line would behave would be basically like a virtual machine. The problem is that since the line is so long, once the last element of a job leaves the first stage, it can start the processing of a new job while the first sequenced work moves through the production line. Effectively, the "parallel machine" modelling the line would be processing more than one job at the same time, that is, overlaps between the processed jobs are evident. The model is evaluated with the help of two of the commercial solvers and to be able to evaluate it, it was necessary to create a set of instances that would represent the situation under study. |
---|