Supervisión Técnica de los Procesos Constructivos en el Proyecto Sotomayor Club House

Digital

Autores:
Caballero-Rey, Cesar David
Tipo de recurso:
Trabajo de grado de pregrado
Fecha de publicación:
2021
Institución:
Universidad de Santander
Repositorio:
Repositorio Universidad de Santander
Idioma:
spa
OAI Identifier:
oai:repositorio.udes.edu.co:001/5985
Acceso en línea:
https://repositorio.udes.edu.co/handle/001/5985
Palabra clave:
Rights
openAccess
License
Derechos Reservados - Universidad de Santander, 2021
id RUDES2_f583fb41fcdc47254ac7abe9527b8e17
oai_identifier_str oai:repositorio.udes.edu.co:001/5985
network_acronym_str RUDES2
network_name_str Repositorio Universidad de Santander
repository_id_str
dc.title.spa.fl_str_mv Supervisión Técnica de los Procesos Constructivos en el Proyecto Sotomayor Club House
title Supervisión Técnica de los Procesos Constructivos en el Proyecto Sotomayor Club House
spellingShingle Supervisión Técnica de los Procesos Constructivos en el Proyecto Sotomayor Club House
title_short Supervisión Técnica de los Procesos Constructivos en el Proyecto Sotomayor Club House
title_full Supervisión Técnica de los Procesos Constructivos en el Proyecto Sotomayor Club House
title_fullStr Supervisión Técnica de los Procesos Constructivos en el Proyecto Sotomayor Club House
title_full_unstemmed Supervisión Técnica de los Procesos Constructivos en el Proyecto Sotomayor Club House
title_sort Supervisión Técnica de los Procesos Constructivos en el Proyecto Sotomayor Club House
dc.creator.fl_str_mv Caballero-Rey, Cesar David
dc.contributor.advisor.none.fl_str_mv Jeréz Gómez, Juan-Camilo
dc.contributor.author.none.fl_str_mv Caballero-Rey, Cesar David
description Digital
publishDate 2021
dc.date.issued.none.fl_str_mv 2021-11-30
dc.date.accessioned.none.fl_str_mv 2022-01-26T16:27:02Z
dc.date.available.none.fl_str_mv 2022-01-26T16:27:02Z
dc.type.spa.fl_str_mv Trabajo de grado - Pregrado
dc.type.coarversion.fl_str_mv http://purl.org/coar/version/c_71e4c1898caa6e32
dc.type.coar.spa.fl_str_mv http://purl.org/coar/resource_type/c_7a1f
dc.type.content.spa.fl_str_mv Text
dc.type.driver.spa.fl_str_mv info:eu-repo/semantics/bachelorThesis
dc.type.redcol.spa.fl_str_mv https://purl.org/redcol/resource_type/TP
format http://purl.org/coar/resource_type/c_7a1f
dc.identifier.local.none.fl_str_mv T 46.21 C111s
dc.identifier.uri.none.fl_str_mv https://repositorio.udes.edu.co/handle/001/5985
identifier_str_mv T 46.21 C111s
url https://repositorio.udes.edu.co/handle/001/5985
dc.language.iso.spa.fl_str_mv spa
language spa
dc.rights.spa.fl_str_mv Derechos Reservados - Universidad de Santander, 2021
dc.rights.coar.fl_str_mv http://purl.org/coar/access_right/c_abf2
dc.rights.accessrights.spa.fl_str_mv info:eu-repo/semantics/openAccess
dc.rights.creativecommons.spa.fl_str_mv Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0)
dc.rights.uri.spa.fl_str_mv https://creativecommons.org/licenses/by-nc-nd/4.0/
rights_invalid_str_mv Derechos Reservados - Universidad de Santander, 2021
Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0)
https://creativecommons.org/licenses/by-nc-nd/4.0/
http://purl.org/coar/access_right/c_abf2
eu_rights_str_mv openAccess
dc.format.extent.spa.fl_str_mv 26 p
dc.format.mimetype.spa.fl_str_mv application/pdf
dc.publisher.spa.fl_str_mv Universidad de Santander
dc.publisher.faculty.spa.fl_str_mv Centro de Formación en Tecnologías
dc.publisher.place.spa.fl_str_mv Bucaramanga, Colombia
dc.publisher.program.spa.fl_str_mv Tecnología en Supervisión de Obras Civiles
institution Universidad de Santander
bitstream.url.fl_str_mv https://repositorio.udes.edu.co/bitstreams/4363d55d-a830-410b-b9b2-c4606b644519/download
https://repositorio.udes.edu.co/bitstreams/51f91758-8467-481d-b130-6b82d54f28b5/download
https://repositorio.udes.edu.co/bitstreams/61d15e29-54d5-4b25-b6f5-5e558d4a28d9/download
https://repositorio.udes.edu.co/bitstreams/dfd152a1-df34-4363-8f88-da41afdc54af/download
bitstream.checksum.fl_str_mv b6684d040c2e2d9f8371a3de8c9e48e0
38d94cf55aa1bf2dac1a736ac45c881c
90f42016007aaf7682e9eb3f4f4efa95
fb3d34b3a2a569b42ad8185c57df2f88
bitstream.checksumAlgorithm.fl_str_mv MD5
MD5
MD5
MD5
repository.name.fl_str_mv Repositorio Universidad de Santander
repository.mail.fl_str_mv soporte@metabiblioteca.com
_version_ 1808490934126510080
spelling Jeréz Gómez, Juan-Camiloc9381eb2-54d1-4318-8834-f68804c522e0-1Caballero-Rey, Cesar Davidbe73242c-ff45-4b3c-be24-214071c944fe-12022-01-26T16:27:02Z2022-01-26T16:27:02Z2021-11-30DigitalEn la inspección técnica realizada para el proyecto Sotomayor club house se llevó a cabo una serie de actividades específicas con el propósito de cumplir unos objetivos, siendo así, desde el primer día que se ingresa al proyecto se da a la tarea realizar un inventario del material extraído de la sala de ventas, puesto que se estaba demoliendo para dar paso a descender al primer sótano por medio de excavaciones, posterior a ello se lleva a cabo un control de movimiento de tierras, mediante especificaciones e indicaciones directas de parte del director de obra, instruyendo diariamente la tarea, como zonas a excavar, re paleo, modificación de la rampa de ingreso, junto a llevar un archivo de recibos de volquetas para el control de volumen excavado. El proceso de construcción del proyecto para bajar a cimentación se lleva a cabo de la construcción de pantallas de parche ancladas, para fijar el terreno cuando se empieza a descender concretamente se bajan los ejes marcado por el topógrafo y se toman las pantallas a realizar para dejar señalizado su medida a perfilar para después perforar la sección e insertar las guayas de tensionamiento, por consiguiente a ello se funde la pantalla, próximo a ello va la inyección y re inyección de la misma, para que pasado los 7 días de haber re inyectado se pueda tensionar exitosamente. En el proyecto de Sotomayor club house se realizó un avance hasta el sótano 3 teniendo así, un margen de tiempo ideal, puesto que al terminar la práctica se daba inicio a la cimentación con poco tiempo desperdiciado y excelente velocidad de trabajo junto al buen rendimiento.In the technical inspection realized to Sotomayor Club House’s project a serie of specific activities were executed with the purpose to fulfill some objectives, for this reason, since the first day that the project started an inventary of the extracted material from sales room was done, inasmuch as the demolition was executed to continue with the descend to the first basement through diggings, after this a control of earthwork was done, with direct specifications and instructions by project manager daily, like excavate areas, reshoveling, access ramp modification and do an archive with the dump trucks receipts to get the control of excavated volume. The process for construction project to go down to fundation accomplish with the construction of anchored patch screens, to attach the land when start the descend concretly the shafts previously mark for the topographer are taking down and the screens to do are taking to signpost their scale to outline, then drilling the section and insert the tensioning wires, with this the screen is melting, afterwards is the injection and re-injection of that, after 7 days of the re-injection it can be tense succesfully. In the Sotomayor Club House’s project was realized an advance until the basement number 3, in that way it was an ideal time allowed, because at the moment to finish the practice the foundation started with short time wasted, an excellent working speed and good efficiency.PregradoTecnólogo en Supervisión de Obras Civiles1 ed.Introducción .................................................................................................................................. 12 Objetivos ....................................................................................................................................... 13 Objetivo General ........................................................................................................................... 13 Objetivos Específicos.................................................................................................................... 13 Desarrollo de la Práctica ............................................................................................................... 14 Construcción de Pantallas Ancladas ............................................................................................. 14 Movimiento de Tierras .................................................................................................................. 18 Inspección de Materiales y Equipos ............................................................................................. 22 Conclusiones ................................................................................................................................. 25 Referencias Bibliográficas ............................................................................................................ 2626 papplication/pdfT 46.21 C111shttps://repositorio.udes.edu.co/handle/001/5985spaUniversidad de SantanderCentro de Formación en TecnologíasBucaramanga, ColombiaTecnología en Supervisión de Obras CivilesDerechos Reservados - Universidad de Santander, 2021info:eu-repo/semantics/openAccessAtribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0)https://creativecommons.org/licenses/by-nc-nd/4.0/http://purl.org/coar/access_right/c_abf2Supervisión Técnica de los Procesos Constructivos en el Proyecto Sotomayor Club HouseTrabajo de grado - Pregradohttp://purl.org/coar/resource_type/c_7a1fTextinfo:eu-repo/semantics/bachelorThesishttps://purl.org/redcol/resource_type/TPhttp://purl.org/coar/version/c_71e4c1898caa6e32Todas las AudienciasCertificación, I. C., & ICONTEC. (15 de Enero de 1992). slideshare. Recuperado el 23 de Octubre de 2021, de Ntc 396: https://es.slideshare.net/samirkent2/ntc-396Certificación, I. C., & ICONTEC. (17 de Febrero de 2010). slideshare. Recuperado el 23 de Octubre de 2021, de Ntc 673: https://es.slideshare.net/1120353985/ntc-673-compresion-concretosNiasa. (s.f.). Niasa. Recuperado el 28 de Octubre de 2021, de Glosario: https://www.niasa.com.mx/productos-niasa/glosario-niasa/Sossa, E. C.-L. (2015). E.D. INGEOTECNIA S.A.S. Recuperado el 23 de Octubre de 2021, de Centro de Investigación para la Erosión y los Deslizamientos - CIED: https://www.ingeotecnia.com.co/cied/Guia-constructiva-estructuras-de-manejo-de-Excavacion-E-Cabeza-L-Sossa.pdfPublicationORIGINALSupervisión_Técnica_de_los_Procesos_Constructivos_en_el_Proyecto_Sotomayor_Club_House.pdfSupervisión_Técnica_de_los_Procesos_Constructivos_en_el_Proyecto_Sotomayor_Club_House.pdfDocumento Principalapplication/pdf2879391https://repositorio.udes.edu.co/bitstreams/4363d55d-a830-410b-b9b2-c4606b644519/downloadb6684d040c2e2d9f8371a3de8c9e48e0MD51LICENSElicense.txtlicense.txttext/plain; charset=utf-859https://repositorio.udes.edu.co/bitstreams/51f91758-8467-481d-b130-6b82d54f28b5/download38d94cf55aa1bf2dac1a736ac45c881cMD52TEXTSupervisión_Técnica_de_los_Procesos_Constructivos_en_el_Proyecto_Sotomayor_Club_House.pdf.txtSupervisión_Técnica_de_los_Procesos_Constructivos_en_el_Proyecto_Sotomayor_Club_House.pdf.txtExtracted texttext/plain22428https://repositorio.udes.edu.co/bitstreams/61d15e29-54d5-4b25-b6f5-5e558d4a28d9/download90f42016007aaf7682e9eb3f4f4efa95MD53THUMBNAILSupervisión_Técnica_de_los_Procesos_Constructivos_en_el_Proyecto_Sotomayor_Club_House.pdf.jpgSupervisión_Técnica_de_los_Procesos_Constructivos_en_el_Proyecto_Sotomayor_Club_House.pdf.jpgGenerated Thumbnailimage/jpeg6009https://repositorio.udes.edu.co/bitstreams/dfd152a1-df34-4363-8f88-da41afdc54af/downloadfb3d34b3a2a569b42ad8185c57df2f88MD54001/5985oai:repositorio.udes.edu.co:001/59852022-10-25 11:18:03.948https://creativecommons.org/licenses/by-nc-nd/4.0/Derechos Reservados - Universidad de Santander, 2021https://repositorio.udes.edu.coRepositorio Universidad de Santandersoporte@metabiblioteca.comTGljZW5jaWEgZGUgUHVibGljYWNpw7NuIFVERVMKRGlyZWN0cmljZXMgZGUgVVNPIHkgQUNDRVNPCgo=