Desarrollo de Acciones Técnico – Administrativo Para Ejecutar Obras de Acueducto y Alcantarillado Para 160 Unidades de Vivienda Bifamiliar en el Municipio de Capitanejo - Santander
Digital
- Autores:
-
Pena-Jaimes, Camilo Andres
- Tipo de recurso:
- Trabajo de grado de pregrado
- Fecha de publicación:
- 2022
- Institución:
- Universidad de Santander
- Repositorio:
- Repositorio Universidad de Santander
- Idioma:
- spa
- OAI Identifier:
- oai:repositorio.udes.edu.co:001/7690
- Acceso en línea:
- https://repositorio.udes.edu.co/handle/001/7690
- Palabra clave:
- Ingeniería
Presupuesto
Reporte De Obra
Pozo
Cota Clave
Key Elevation
Engineering
Budget
Work Report
Well
- Rights
- openAccess
- License
- Derechos Reservados - Universidad de Santander, 2022
id |
RUDES2_b5f7c2b6ab073c7babac03b2b605117c |
---|---|
oai_identifier_str |
oai:repositorio.udes.edu.co:001/7690 |
network_acronym_str |
RUDES2 |
network_name_str |
Repositorio Universidad de Santander |
repository_id_str |
|
dc.title.spa.fl_str_mv |
Desarrollo de Acciones Técnico – Administrativo Para Ejecutar Obras de Acueducto y Alcantarillado Para 160 Unidades de Vivienda Bifamiliar en el Municipio de Capitanejo - Santander |
title |
Desarrollo de Acciones Técnico – Administrativo Para Ejecutar Obras de Acueducto y Alcantarillado Para 160 Unidades de Vivienda Bifamiliar en el Municipio de Capitanejo - Santander |
spellingShingle |
Desarrollo de Acciones Técnico – Administrativo Para Ejecutar Obras de Acueducto y Alcantarillado Para 160 Unidades de Vivienda Bifamiliar en el Municipio de Capitanejo - Santander Ingeniería Presupuesto Reporte De Obra Pozo Cota Clave Key Elevation Engineering Budget Work Report Well |
title_short |
Desarrollo de Acciones Técnico – Administrativo Para Ejecutar Obras de Acueducto y Alcantarillado Para 160 Unidades de Vivienda Bifamiliar en el Municipio de Capitanejo - Santander |
title_full |
Desarrollo de Acciones Técnico – Administrativo Para Ejecutar Obras de Acueducto y Alcantarillado Para 160 Unidades de Vivienda Bifamiliar en el Municipio de Capitanejo - Santander |
title_fullStr |
Desarrollo de Acciones Técnico – Administrativo Para Ejecutar Obras de Acueducto y Alcantarillado Para 160 Unidades de Vivienda Bifamiliar en el Municipio de Capitanejo - Santander |
title_full_unstemmed |
Desarrollo de Acciones Técnico – Administrativo Para Ejecutar Obras de Acueducto y Alcantarillado Para 160 Unidades de Vivienda Bifamiliar en el Municipio de Capitanejo - Santander |
title_sort |
Desarrollo de Acciones Técnico – Administrativo Para Ejecutar Obras de Acueducto y Alcantarillado Para 160 Unidades de Vivienda Bifamiliar en el Municipio de Capitanejo - Santander |
dc.creator.fl_str_mv |
Pena-Jaimes, Camilo Andres |
dc.contributor.advisor.none.fl_str_mv |
Rondon-Ordonez, Jaime |
dc.contributor.author.none.fl_str_mv |
Pena-Jaimes, Camilo Andres |
dc.subject.proposal.spa.fl_str_mv |
Ingeniería Presupuesto Reporte De Obra Pozo Cota Clave Key Elevation |
topic |
Ingeniería Presupuesto Reporte De Obra Pozo Cota Clave Key Elevation Engineering Budget Work Report Well |
dc.subject.proposal.eng.fl_str_mv |
Engineering Budget Work Report Well |
description |
Digital |
publishDate |
2022 |
dc.date.accessioned.none.fl_str_mv |
2022-10-07T23:10:22Z |
dc.date.available.none.fl_str_mv |
2022-10-07T23:10:22Z |
dc.date.issued.none.fl_str_mv |
2022-06-30 |
dc.type.spa.fl_str_mv |
Trabajo de grado - Pregrado |
dc.type.coarversion.fl_str_mv |
http://purl.org/coar/version/c_71e4c1898caa6e32 |
dc.type.coar.spa.fl_str_mv |
http://purl.org/coar/resource_type/c_7a1f |
dc.type.content.spa.fl_str_mv |
Text |
dc.type.driver.spa.fl_str_mv |
info:eu-repo/semantics/bachelorThesis |
dc.type.redcol.spa.fl_str_mv |
https://purl.org/redcol/resource_type/TP |
format |
http://purl.org/coar/resource_type/c_7a1f |
dc.identifier.local.none.fl_str_mv |
T 20.22 P261d |
dc.identifier.uri.none.fl_str_mv |
https://repositorio.udes.edu.co/handle/001/7690 |
identifier_str_mv |
T 20.22 P261d |
url |
https://repositorio.udes.edu.co/handle/001/7690 |
dc.language.iso.spa.fl_str_mv |
spa |
language |
spa |
dc.rights.spa.fl_str_mv |
Derechos Reservados - Universidad de Santander, 2022 |
dc.rights.coar.fl_str_mv |
http://purl.org/coar/access_right/c_abf2 |
dc.rights.accessrights.spa.fl_str_mv |
info:eu-repo/semantics/openAccess |
dc.rights.creativecommons.spa.fl_str_mv |
Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) |
dc.rights.uri.spa.fl_str_mv |
https://creativecommons.org/licenses/by-nc-nd/4.0/ |
rights_invalid_str_mv |
Derechos Reservados - Universidad de Santander, 2022 Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) https://creativecommons.org/licenses/by-nc-nd/4.0/ http://purl.org/coar/access_right/c_abf2 |
eu_rights_str_mv |
openAccess |
dc.format.extent.spa.fl_str_mv |
56 p |
dc.format.mimetype.spa.fl_str_mv |
application/pdf |
dc.publisher.faculty.spa.fl_str_mv |
Facultad de Ingeniería |
dc.publisher.place.spa.fl_str_mv |
Bucaramanga, Colombia |
dc.publisher.program.spa.fl_str_mv |
Ingeniería Civil |
institution |
Universidad de Santander |
bitstream.url.fl_str_mv |
https://repositorio.udes.edu.co/bitstreams/29b75e86-394d-4770-b521-12d9a639aa2d/download https://repositorio.udes.edu.co/bitstreams/e16c3f31-a9ec-4cba-92e5-8e023130414c/download https://repositorio.udes.edu.co/bitstreams/36473147-c785-4840-b2cf-5ee170f55a05/download https://repositorio.udes.edu.co/bitstreams/f21c704b-2067-45e3-bda0-810335686160/download https://repositorio.udes.edu.co/bitstreams/15c7f585-371d-4437-bc68-cb2c333f2c23/download https://repositorio.udes.edu.co/bitstreams/8013a8f0-32f8-4606-818f-0320c89a88a8/download https://repositorio.udes.edu.co/bitstreams/5af0d7a9-42d4-450c-a5e2-73795df3bf86/download |
bitstream.checksum.fl_str_mv |
38d94cf55aa1bf2dac1a736ac45c881c 84b893503c0ae7dda3e2e91e52a4d095 9f6c9c9959a396090c3abce2ab92f837 abf60d5c96256862e90562f4984b17f4 382acb98c45db62ffe316b9247d42e49 19acd572c0db989018778155e3e1fd0e 28e96de1e929cf1970f5e4ce8773a691 |
bitstream.checksumAlgorithm.fl_str_mv |
MD5 MD5 MD5 MD5 MD5 MD5 MD5 |
repository.name.fl_str_mv |
Repositorio Universidad de Santander |
repository.mail.fl_str_mv |
soporte@metabiblioteca.com |
_version_ |
1818102029409583104 |
spelling |
Rondon-Ordonez, Jaime6466b2fa-3f3c-43db-bbd6-d6a68c055683-1Pena-Jaimes, Camilo Andres5a6b2fb9-345e-4e6c-aad1-4904debfece9-12022-10-07T23:10:22Z2022-10-07T23:10:22Z2022-06-30DigitalEn este trabajo se muestra las actividades realizadas en el tiempo estipulado de la práctica empresarial con la empresa G y J Ingeniería y Consultoría S.A.S. donde se adquirió conocimientos especialmente en lo relacionado con los procesos constructivos que se realizaron en dicha obra, basándonos siempre en las normas técnicas vigentes, en dos escenarios muy importantes como es trabajo de oficina y trabajo de campo en la construcción de obras de urbanismo para 160 unidades de vivienda bifamiliar de interés social (VIS) para los estratos 1 y 2 en el municipio de Capitanejo – Santander. Dentro del trabajo de campo se efectuó supervisión, control y seguimiento de obras de acueducto y alcantarillado y ordenando con la aprobación del ingeniero residente las correcciones y ajustes de actividades que no cumplían las normas técnicas vigentes, destacando los roles administrativos, como revisión de planos, informes de obra, acta parcial, cantidades de obra y relación de caja menor. Para concluir esta pasantía, representó la extensión de la carrera en otro escenario al exterior de las aulas, que sirvieron para ratificar lo aprendido en el pregrado. se adquirió nuevos conceptos en los campos de la ingeniería ya que se tuvo interacción con varios profesionales con vasta experiencia y se adquirió buena habilidad en el manejo de personal, pues se considera que es un punto fundamental que beneficia el avance de obra. Se hace hincapié la relación que se llevó con la comunidad beneficiaria la cual era armoniosa y de mucho respeto por lo tanto no se presentaron inconvenientes al momento de ejecutar las obrasThis work shows the activities carried out in the stipulated time of the business practice with the company G y J Engineering and Consulting S.A.S. where knowledge was acquired especially in relation to the construction processes that were carried out in said work, always basing ourselves on the current technical standards, in two very important scenarios such as office work and field work in the construction of urban planning works for 160 two-family housing units of social interest (VIS) for strata 1 and 2 in the municipality of Capitanejo - Santander. Within the field work, supervision, control and monitoring of aqueduct and sewage works were carried out and ordering, with the approval of the resident engineer, the corrections and adjustments of activities that did not comply with current technical standards, highlighting the administrative roles, such as review of plans, work reports, partial minutes, work amounts and petty cash ratio. To conclude this internship, he represented the extension of the career in another scenario outside the classroom, which served to ratify what was learned in the undergraduate. New concepts were acquired in the fields of engineering since there was interaction with several professionals with vast experience and good skills were acquired in managing personnel, since it is considered to be a fundamental point that benefits the progress of the work. Emphasis is placed on the relationship that was maintained with the beneficiary community, which was harmonious and highly respectful, therefore there were no problems at the time of executing the works.PregradoIngeniero(a) CivilIntroducción .................................................................................................................................. 15 1. Objetivos ................................................................................................................................... 16 1.1 Objetivo General ..................................................................................................................... 16 1.2 Objetivos Específicos.............................................................................................................. 16 2. Marco Teórico ........................................................................................................................... 17 2.1 Información de la Empresa ..................................................................................................... 17 2.2 Marco Legal ............................................................................................................................ 17 2.3 Marco Conceptual ................................................................................................................... 18 3. Metodología .............................................................................................................................. 20 3.1 Localización del Proyecto ....................................................................................................... 20 3.2 Generalidades de la Práctica ................................................................................................... 22 3.3 Características Zona del Proyecto ........................................................................................... 22 3.4 Características del Proyecto .................................................................................................... 23 3.5 Etapa 1. Desarrollo del Proyecto ............................................................................................ 23 3.5.1 Informe Diario de Obra. ....................................................................................................... 26 3.5.2 Manejo de Caja Menor. ........................................................................................................ 27 3.6 Etapa 2. Trabajo de Campo ..................................................................................................... 28 3.6.1 Localización y Replanteo de Pozos. .................................................................................... 28 3.6.2 Excavación Mecánica. ......................................................................................................... 31 3.6.3 Instalación Tubería Sanitaria. .............................................................................................. 42 3.6.4 Instalación Tubería Para Acueducto red Principal Hidráulica. ............................................ 49 3.7 Etapa 3. Manejo de Personal ................................................................................................... 51 3.7.1 Revisión Planos. ................................................................................................................... 52 7. Análisis de Resultados .............................................................................................................. 53 8. Conclusiones ............................................................................................................................. 54 9. Recomendaciones .................................................................................................................. 55 Referencias Bibliográficas ............................................................................................................ 5656 papplication/pdfT 20.22 P261dhttps://repositorio.udes.edu.co/handle/001/7690spaFacultad de IngenieríaBucaramanga, ColombiaIngeniería CivilDerechos Reservados - Universidad de Santander, 2022info:eu-repo/semantics/openAccessAtribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0)https://creativecommons.org/licenses/by-nc-nd/4.0/http://purl.org/coar/access_right/c_abf2IngenieríaPresupuestoReporte De ObraPozoCota ClaveKey ElevationEngineeringBudgetWork ReportWellDesarrollo de Acciones Técnico – Administrativo Para Ejecutar Obras de Acueducto y Alcantarillado Para 160 Unidades de Vivienda Bifamiliar en el Municipio de Capitanejo - SantanderTrabajo de grado - Pregradohttp://purl.org/coar/resource_type/c_7a1fTextinfo:eu-repo/semantics/bachelorThesishttps://purl.org/redcol/resource_type/TPhttp://purl.org/coar/version/c_71e4c1898caa6e32Todas las AudienciasCódigo. (n.d.). Logo empresa MANUAL DE INTERVENTORIA Y SUPERVISION MANUAL DE INTEVENTORIA Y SUPERVISION Logo empresa MANUAL DE INTERVENTORIA Y SUPERVISION.Definición de casa bifamiliar | Diccionario de arquitectura y construcción ✔️. (n.d.). Retrieved June 21, 2022, from https://www.parro.com.ar/definicion-de-casa+bifamiliarSistemas de Acueducto⋆ Definición, Funcionamiento e Importancia. (n.d.). Retrieved June 21, 2022, from https://blog.fibrasynormasdecolombia.com/acueducto/PublicationLICENSElicense.txtlicense.txttext/plain; charset=utf-859https://repositorio.udes.edu.co/bitstreams/29b75e86-394d-4770-b521-12d9a639aa2d/download38d94cf55aa1bf2dac1a736ac45c881cMD53ORIGINALDesarrollo_de_Acciones_Técnico_Administrativo_Para_Ejecutar_Obras_Complementarias_de_Urbanismo....pdfDesarrollo_de_Acciones_Técnico_Administrativo_Para_Ejecutar_Obras_Complementarias_de_Urbanismo....pdfDocumento Principalapplication/pdf5613090https://repositorio.udes.edu.co/bitstreams/e16c3f31-a9ec-4cba-92e5-8e023130414c/download84b893503c0ae7dda3e2e91e52a4d095MD51Documento_de_Entrega_de_Trabajos_de_Grado_Trabajos_de_Investigación_o_Tesis_y_Autorización_de_su_u.pdfDocumento_de_Entrega_de_Trabajos_de_Grado_Trabajos_de_Investigación_o_Tesis_y_Autorización_de_su_u.pdfapplication/pdf118750https://repositorio.udes.edu.co/bitstreams/36473147-c785-4840-b2cf-5ee170f55a05/download9f6c9c9959a396090c3abce2ab92f837MD52TEXTDesarrollo_de_Acciones_Técnico_Administrativo_Para_Ejecutar_Obras_Complementarias_de_Urbanismo....pdf.txtDesarrollo_de_Acciones_Técnico_Administrativo_Para_Ejecutar_Obras_Complementarias_de_Urbanismo....pdf.txtExtracted texttext/plain39090https://repositorio.udes.edu.co/bitstreams/f21c704b-2067-45e3-bda0-810335686160/downloadabf60d5c96256862e90562f4984b17f4MD54Documento_de_Entrega_de_Trabajos_de_Grado_Trabajos_de_Investigación_o_Tesis_y_Autorización_de_su_u.pdf.txtDocumento_de_Entrega_de_Trabajos_de_Grado_Trabajos_de_Investigación_o_Tesis_y_Autorización_de_su_u.pdf.txtExtracted texttext/plain2506https://repositorio.udes.edu.co/bitstreams/15c7f585-371d-4437-bc68-cb2c333f2c23/download382acb98c45db62ffe316b9247d42e49MD56THUMBNAILDesarrollo_de_Acciones_Técnico_Administrativo_Para_Ejecutar_Obras_Complementarias_de_Urbanismo....pdf.jpgDesarrollo_de_Acciones_Técnico_Administrativo_Para_Ejecutar_Obras_Complementarias_de_Urbanismo....pdf.jpgGenerated Thumbnailimage/jpeg6377https://repositorio.udes.edu.co/bitstreams/8013a8f0-32f8-4606-818f-0320c89a88a8/download19acd572c0db989018778155e3e1fd0eMD55Documento_de_Entrega_de_Trabajos_de_Grado_Trabajos_de_Investigación_o_Tesis_y_Autorización_de_su_u.pdf.jpgDocumento_de_Entrega_de_Trabajos_de_Grado_Trabajos_de_Investigación_o_Tesis_y_Autorización_de_su_u.pdf.jpgGenerated Thumbnailimage/jpeg15139https://repositorio.udes.edu.co/bitstreams/5af0d7a9-42d4-450c-a5e2-73795df3bf86/download28e96de1e929cf1970f5e4ce8773a691MD57001/7690oai:repositorio.udes.edu.co:001/76902022-10-25 11:16:39.303https://creativecommons.org/licenses/by-nc-nd/4.0/Derechos Reservados - Universidad de Santander, 2022https://repositorio.udes.edu.coRepositorio Universidad de Santandersoporte@metabiblioteca.comTGljZW5jaWEgZGUgUHVibGljYWNpw7NuIFVERVMKRGlyZWN0cmljZXMgZGUgVVNPIHkgQUNDRVNPCgo= |