Estudio de prefactibilidad para la producción e instalación de muebles con tableros melaminados en el municipio de Rionegro

The Antioqueño Orient is a dynamic region with a strong business and trade union network, which is crucial to generate economic growth, entrepreneurial and prosperity capabilities, and an excellent living environment. This study describes the behavior of the construction sector in the region and how...

Full description

Autores:
Díaz-Hernández, Laura Marcela
Rendón-Jaramillo, Víctor Alejandro
Tipo de recurso:
Tesis
Fecha de publicación:
2022
Institución:
Universidad Católica de Oriente
Repositorio:
Repositorio UCO
Idioma:
OAI Identifier:
oai:repositorio.uco.edu.co:20.500.13064/1599
Acceso en línea:
https://repositorio.uco.edu.co/handle/20.500.13064/1599
Palabra clave:
Producción
Tableros melaminados
Mobiliario
Evaluación financiera
Production
Melamine boards
Furniture
Financial evaluation
Industria del mueble
Muebles - Industria
Costos de producción
Costo industrial
Costos de mano de obra
Rights
License
http://creativecommons.org/licenses/by/3.0/
Description
Summary:The Antioqueño Orient is a dynamic region with a strong business and trade union network, which is crucial to generate economic growth, entrepreneurial and prosperity capabilities, and an excellent living environment. This study describes the behavior of the construction sector in the region and how it mobilizes other subsectors such as wood and architectural furniture for the home, the behavior of the specific real estate market for the municipality of Rionegro was analyzed and the potential demand for the production of closets and kitchens for new homes was quantified, In addition, different competitors were studied to establish a value proposition, technical capabilities and administrative support necessary to start up a company that provides the construction sector with this type of furniture made of melamine boards, the legal requirements and its financial viability through indicators such as IRR and NPV, additionally, the social and environmental impact of the project was studied to determine its viability.