Automatización de nodos de conexión en el laboratorio UniGrid – Fase 2
This project aims to automate nodes 611 and 671 of the UniGrid laboratory of the Universidad del Norte. It seeks to guarantee total independence in the output lines associated with the loads and generators of each node, and being able to control all the lines from an user interface. Therefore, a con...
- Autores:
-
Jaramillo Peñaloza, Camilo Andrés
Llach Bruges, Bill Antony
Valdelamar Daza, Adrian
- Tipo de recurso:
- Fecha de publicación:
- 2022
- Institución:
- Universidad del Norte
- Repositorio:
- Repositorio Uninorte
- Idioma:
- spa
- OAI Identifier:
- oai:manglar.uninorte.edu.co:10584/11262
- Acceso en línea:
- http://hdl.handle.net/10584/11262
- Palabra clave:
- Automatización
SCADA
Tablero eléctrico
PLC
Automatización de sistema eléctrico
PLC
Automation of electrical systems
Automation
SCADA
Electrical Board
- Rights
- License
- Universidad del Norte
Summary: | This project aims to automate nodes 611 and 671 of the UniGrid laboratory of the Universidad del Norte. It seeks to guarantee total independence in the output lines associated with the loads and generators of each node, and being able to control all the lines from an user interface. Therefore, a control system prototype was designed and built, which not only allows manual operation, but also allows remote control of the nodes from the SCADA system previously installed in the laboratory network. Tests of each stage of the project were carried out, that is, we verified that each connection between different devices was given in an adequate and consistent manner over time and in the given environmental conditions and in which the project is developed. Thus, the prototype of the control system was developed progressively. After designing and implementing the complete design of the control system prototype in nodes 611 and 671, end-to-end tests of the entire system were carried out, in order to verify that the prototype, in its entirety, It will work properly and the objectives set for this project will be met with their respective scopes and taking into account their respective limitations previously established in conjunction with the clients, that is, project advisors. The tests carried out show that the operation is adequate, and the objectives were achieved. |
---|