Sistema de alimentación eléctrica para camiones de carga
The problem this project holds is the high budget used for the supply of fuel for load trucks in a sugarcane company. Trucks yield 3.4km/gal for cane transport. A power supply system is proposed as a solution, where the power is supplied via an overhead contact line. Trucks drain energy from the lin...
- Autores:
-
Vasquez Correa, Alejandro Luis
Osorio Chavez, Fabio Andres
- Tipo de recurso:
- Fecha de publicación:
- 2016
- Institución:
- Universidad del Norte
- Repositorio:
- Repositorio Uninorte
- Idioma:
- spa
- OAI Identifier:
- oai:manglar.uninorte.edu.co:10584/5869
- Acceso en línea:
- http://hdl.handle.net/10584/5869
- Palabra clave:
- linea de contacto
subestacion rectificadora
movilidad electrica
overhead linea
rectifier substation
Electric movility
- Rights
- License
- Universidad del Norte
id |
REPOUNORT2_f2647549259911b9126d3629886a1e4c |
---|---|
oai_identifier_str |
oai:manglar.uninorte.edu.co:10584/5869 |
network_acronym_str |
REPOUNORT2 |
network_name_str |
Repositorio Uninorte |
repository_id_str |
|
dc.title.es_ES.fl_str_mv |
Sistema de alimentación eléctrica para camiones de carga |
dc.title.en_US.fl_str_mv |
Power supply system for load trucks |
title |
Sistema de alimentación eléctrica para camiones de carga |
spellingShingle |
Sistema de alimentación eléctrica para camiones de carga linea de contacto subestacion rectificadora movilidad electrica overhead linea rectifier substation Electric movility |
title_short |
Sistema de alimentación eléctrica para camiones de carga |
title_full |
Sistema de alimentación eléctrica para camiones de carga |
title_fullStr |
Sistema de alimentación eléctrica para camiones de carga |
title_full_unstemmed |
Sistema de alimentación eléctrica para camiones de carga |
title_sort |
Sistema de alimentación eléctrica para camiones de carga |
dc.creator.fl_str_mv |
Vasquez Correa, Alejandro Luis Osorio Chavez, Fabio Andres |
dc.contributor.advisor.none.fl_str_mv |
Soto Ortiz, Jose Daniel |
dc.contributor.author.none.fl_str_mv |
Vasquez Correa, Alejandro Luis Osorio Chavez, Fabio Andres |
dc.subject.es_ES.fl_str_mv |
linea de contacto subestacion rectificadora movilidad electrica |
topic |
linea de contacto subestacion rectificadora movilidad electrica overhead linea rectifier substation Electric movility |
dc.subject.en_US.fl_str_mv |
overhead linea rectifier substation Electric movility |
description |
The problem this project holds is the high budget used for the supply of fuel for load trucks in a sugarcane company. Trucks yield 3.4km/gal for cane transport. A power supply system is proposed as a solution, where the power is supplied via an overhead contact line. Trucks drain energy from the line while they are on their track of operation. They are required to be electric vehicles which must be able to connect to the overhead line via pantograph. The line takes energy from an existing network through a rectifier substation that delivers a voltage of 750Vdc. The line is classified as simple by its composition as mentioned in [1]. The system has support structures and self-tensioning equipment that maintains a correct layout of the airline. This equipment and design meets with the requirements of Colombian electrical regulations (NTC 2050 and RETIE) and European standards listed in [2]. A limitation of the project is the large initial investment, value that lies between 1 and 1.5 billion pesos. This value is then restored with the profit of electricity replacing the fuel, where expenses are reduced by half in means of operation, which gives savings of 1162.94 $/km. The design was verified in simulation software. The electrical simulation was performed in the ETAP 12.6 software and the mechanical simulation was performed in PLS-CADD software. A maximum of 3.53% was the result given in electrical voltage drop and a sag value of 13cm in the mechanical tensioning of the cable at 20% of its breaking capacity. This is an acceptable behavior. A recommendation to the project is to integrate renewable energies to the system. [1] ADIF. Fichas de actualidad. 2013. Disponible en (consultado 09 Nov 2016) http://www.adif.es/es_ES/comunicacion_y_prensa/fichas_de_actualidad/ficha_actualidad_00070.shtml [2] Siemens. Product Catalog. Contact line equipment for mass transit and main-line railways. 2012. |
publishDate |
2016 |
dc.date.accessioned.none.fl_str_mv |
2016-11-26T20:35:30Z |
dc.date.available.none.fl_str_mv |
2016-11-26T20:35:30Z |
dc.date.issued.none.fl_str_mv |
2016-11-25 |
dc.type.es_ES.fl_str_mv |
article |
dc.type.coar.fl_str_mv |
http://purl.org/coar/resource_type/c_6501 |
dc.identifier.uri.none.fl_str_mv |
http://hdl.handle.net/10584/5869 |
url |
http://hdl.handle.net/10584/5869 |
dc.language.iso.es_ES.fl_str_mv |
spa |
language |
spa |
dc.rights.es_ES.fl_str_mv |
Universidad del Norte |
dc.rights.coar.fl_str_mv |
http://purl.org/coar/access_right/c_abf2 |
rights_invalid_str_mv |
Universidad del Norte http://purl.org/coar/access_right/c_abf2 |
dc.publisher.es_ES.fl_str_mv |
Barranquilla, Universidad del Norte, 2016 |
institution |
Universidad del Norte |
bitstream.url.fl_str_mv |
http://172.16.14.36:8080/bitstream/10584/5869/2/Sistema_de_alimentacion_camiones.jpg http://172.16.14.36:8080/bitstream/10584/5869/4/Etapas_PF_ES.jpg http://172.16.14.36:8080/bitstream/10584/5869/5/Etapas_PF_EN.jpg http://172.16.14.36:8080/bitstream/10584/5869/6/Resumen_proyecto_final_ES.pdf http://172.16.14.36:8080/bitstream/10584/5869/7/Resumen_proyecto_final_EN.pdf http://172.16.14.36:8080/bitstream/10584/5869/8/license.txt |
bitstream.checksum.fl_str_mv |
ca398c929b4c5f4b34d65de54862fb4f c1bbf21b10324ee0cc538936e5fc6fab 4f7b148718f8aeb178eaede6712ecc8a cb542bbe9002fa58bed276b7d30807e6 4a51198cc3f6f4b13ee55fe958813af3 8a4605be74aa9ea9d79846c1fba20a33 |
bitstream.checksumAlgorithm.fl_str_mv |
MD5 MD5 MD5 MD5 MD5 MD5 |
repository.name.fl_str_mv |
Repositorio Digital de la Universidad del Norte |
repository.mail.fl_str_mv |
mauribe@uninorte.edu.co |
_version_ |
1818112732153511936 |
spelling |
Soto Ortiz, Jose DanielVasquez Correa, Alejandro LuisOsorio Chavez, Fabio Andres2016-11-26T20:35:30Z2016-11-26T20:35:30Z2016-11-25http://hdl.handle.net/10584/5869The problem this project holds is the high budget used for the supply of fuel for load trucks in a sugarcane company. Trucks yield 3.4km/gal for cane transport. A power supply system is proposed as a solution, where the power is supplied via an overhead contact line. Trucks drain energy from the line while they are on their track of operation. They are required to be electric vehicles which must be able to connect to the overhead line via pantograph. The line takes energy from an existing network through a rectifier substation that delivers a voltage of 750Vdc. The line is classified as simple by its composition as mentioned in [1]. The system has support structures and self-tensioning equipment that maintains a correct layout of the airline. This equipment and design meets with the requirements of Colombian electrical regulations (NTC 2050 and RETIE) and European standards listed in [2]. A limitation of the project is the large initial investment, value that lies between 1 and 1.5 billion pesos. This value is then restored with the profit of electricity replacing the fuel, where expenses are reduced by half in means of operation, which gives savings of 1162.94 $/km. The design was verified in simulation software. The electrical simulation was performed in the ETAP 12.6 software and the mechanical simulation was performed in PLS-CADD software. A maximum of 3.53% was the result given in electrical voltage drop and a sag value of 13cm in the mechanical tensioning of the cable at 20% of its breaking capacity. This is an acceptable behavior. A recommendation to the project is to integrate renewable energies to the system. [1] ADIF. Fichas de actualidad. 2013. Disponible en (consultado 09 Nov 2016) http://www.adif.es/es_ES/comunicacion_y_prensa/fichas_de_actualidad/ficha_actualidad_00070.shtml [2] Siemens. Product Catalog. Contact line equipment for mass transit and main-line railways. 2012.es_ES:El problema para este proyecto es el alto presupuesto destinado para el abastecimiento de combustible a camiones de carga dentro de un ingenio. Los camiones rinden 3.4km/gal para transporte de caña. Se propuso un sistema de alimentación eléctrica como solución, donde la alimentación se realiza a través de una línea aérea de contacto. Los camiones toman la energía mientras estén dentro del recorrido de transporte. Se requiere que sean eléctricos y tengan la capacidad de conectarse a la línea aérea mediante pantógrafos. La línea se alimenta de una red ya existente a través de una subestación rectificadora que ofrece una tensión de 750Vdc. La línea se clasifica como sencilla mediante su composición como se menciona en[1]. El sistema cuenta con equipos de soporte y auto-tensionamiento que mantienen una correcta disposición de la línea aérea. El diseño y los equipos cumplen con normativas eléctricas colombianas (NTC 2050 y RETIE) y normas europeas listadas en[2]. Una limitante principal del proyecto es la gran inversión económica inicial, valor que se encuentra entre 1 a 1.5 mil millones de pesos. Esta inversión se recupera con la utilidad de la electricidad reemplazando el combustible, donde los gastos se reducen a la mitad en la operación y se tiene un ahorro de 1162,94$/km. Se validó el diseño en software de simulación. La simulación eléctrica se realizó en el software ETAP 12.6 y la simulación mecánica en el software PLS-CADD. Se obtuvo un máximo de 3.53% en caída de tensión eléctrica y una flecha de 13cm en el tensionado mecánico del cable al 20% de su capacidad de rotura, brindando resultados favorables. Se recomienda incorporar energías renovables al sistema de alimentación como valor agregado. [1]ADIF. Fichas de actualidad. 2013. Disponible en (consultado 09/11/16) http://www.adif.es/es_ES/comunicacion_y_prensa/fichas_de_actualidad/ficha_actualidad_00070.shtml [2]Siemens. Product Catalog. Contact line equipment for mass transit and main-line railways. 2012spaBarranquilla, Universidad del Norte, 2016Universidad del Nortehttp://purl.org/coar/access_right/c_abf2linea de contactosubestacion rectificadoramovilidad electricaoverhead linearectifier substationElectric movilitySistema de alimentación eléctrica para camiones de cargaPower supply system for load trucksarticlehttp://purl.org/coar/resource_type/c_6501ORIGINALSistema_de_alimentacion_camiones.jpgSistema_de_alimentacion_camiones.jpgImagen representativa del proyectoimage/jpeg43348http://172.16.14.36:8080/bitstream/10584/5869/2/Sistema_de_alimentacion_camiones.jpgca398c929b4c5f4b34d65de54862fb4fMD52Etapas_PF_ES.jpgEtapas_PF_ES.jpgEtapas eléctricas del proyectoimage/jpeg49819http://172.16.14.36:8080/bitstream/10584/5869/4/Etapas_PF_ES.jpgc1bbf21b10324ee0cc538936e5fc6fabMD54Etapas_PF_EN.jpgEtapas_PF_EN.jpgElectrical stages of the projectimage/jpeg45954http://172.16.14.36:8080/bitstream/10584/5869/5/Etapas_PF_EN.jpg4f7b148718f8aeb178eaede6712ecc8aMD55Resumen_proyecto_final_ES.pdfResumen_proyecto_final_ES.pdfResumenapplication/pdf210535http://172.16.14.36:8080/bitstream/10584/5869/6/Resumen_proyecto_final_ES.pdfcb542bbe9002fa58bed276b7d30807e6MD56Resumen_proyecto_final_EN.pdfResumen_proyecto_final_EN.pdfAbstractapplication/pdf209354http://172.16.14.36:8080/bitstream/10584/5869/7/Resumen_proyecto_final_EN.pdf4a51198cc3f6f4b13ee55fe958813af3MD57LICENSElicense.txtlicense.txttext/plain; charset=utf-81748http://172.16.14.36:8080/bitstream/10584/5869/8/license.txt8a4605be74aa9ea9d79846c1fba20a33MD5810584/5869oai:172.16.14.36:10584/58692016-11-26 15:35:30.518Repositorio Digital de la Universidad del Nortemauribe@uninorte.edu.co |