Diseño de un sistema de refrigeración para naves industriales del sector farmacéutico en la ciudad de Barranquilla

The design of a refrigeration system of a pharmaceutical warehouse of 968m ^ 2 in the city of Barranquilla is presented, which complies with the standards of good manufacturing practices for the storage of gelatin raw materials which need conditions of 20 ° C with maximum relative humidity of 55%, t...

Full description

Autores:
Prieto, Andres
Pacheco, Gabriel
Robles, Leonardo
Tipo de recurso:
Fecha de publicación:
2021
Institución:
Universidad del Norte
Repositorio:
Repositorio Uninorte
Idioma:
spa
OAI Identifier:
oai:manglar.uninorte.edu.co:10584/9573
Acceso en línea:
http://hdl.handle.net/10584/9573
Palabra clave:
chiller
refigeracion
carga termica
torre de enfriamiento
acondicionamiento de aire
humedad relativa
aislamiento
calor
Unidad manejadora
Air-handling unit
Chiller
Refrigeration
Thermal chargue
air conditioning
relative humidity
Isolation
Heat
Rights
License
Universidad del Norte
id REPOUNORT2_8fc0a607108f20e8410033181f27e16e
oai_identifier_str oai:manglar.uninorte.edu.co:10584/9573
network_acronym_str REPOUNORT2
network_name_str Repositorio Uninorte
repository_id_str
dc.title.es_ES.fl_str_mv Diseño de un sistema de refrigeración para naves industriales del sector farmacéutico en la ciudad de Barranquilla
dc.title.en_US.fl_str_mv Refrigeration system design for industrial warehouses on pharmaceutical sector in Barranquilla city
title Diseño de un sistema de refrigeración para naves industriales del sector farmacéutico en la ciudad de Barranquilla
spellingShingle Diseño de un sistema de refrigeración para naves industriales del sector farmacéutico en la ciudad de Barranquilla
chiller
refigeracion
carga termica
torre de enfriamiento
acondicionamiento de aire
humedad relativa
aislamiento
calor
Unidad manejadora
Air-handling unit
Chiller
Refrigeration
Thermal chargue
air conditioning
relative humidity
Isolation
Heat
title_short Diseño de un sistema de refrigeración para naves industriales del sector farmacéutico en la ciudad de Barranquilla
title_full Diseño de un sistema de refrigeración para naves industriales del sector farmacéutico en la ciudad de Barranquilla
title_fullStr Diseño de un sistema de refrigeración para naves industriales del sector farmacéutico en la ciudad de Barranquilla
title_full_unstemmed Diseño de un sistema de refrigeración para naves industriales del sector farmacéutico en la ciudad de Barranquilla
title_sort Diseño de un sistema de refrigeración para naves industriales del sector farmacéutico en la ciudad de Barranquilla
dc.creator.fl_str_mv Prieto, Andres
Pacheco, Gabriel
Robles, Leonardo
dc.contributor.advisor.none.fl_str_mv Caballero, Hugo
Durango, Nestor
dc.contributor.author.none.fl_str_mv Prieto, Andres
Pacheco, Gabriel
Robles, Leonardo
dc.subject.es_ES.fl_str_mv chiller
refigeracion
carga termica
torre de enfriamiento
acondicionamiento de aire
humedad relativa
aislamiento
calor
Unidad manejadora
Air-handling unit
topic chiller
refigeracion
carga termica
torre de enfriamiento
acondicionamiento de aire
humedad relativa
aislamiento
calor
Unidad manejadora
Air-handling unit
Chiller
Refrigeration
Thermal chargue
air conditioning
relative humidity
Isolation
Heat
dc.subject.en_US.fl_str_mv Chiller
Refrigeration
Thermal chargue
air conditioning
relative humidity
Isolation
Heat
description The design of a refrigeration system of a pharmaceutical warehouse of 968m ^ 2 in the city of Barranquilla is presented, which complies with the standards of good manufacturing practices for the storage of gelatin raw materials which need conditions of 20 ° C with maximum relative humidity of 55%, taking into account the regulations associated with the sizing of air ducts related to the pharmaceutical sector, presenting a basic guide to the guidelines to follow for sizing air ducts, cold water production machines and calculations of thermal load received by the enclosure, leaving 3d models available to the reader that show in detail the layout of the equipment and the calculations to be taken into account for the correct operation of the system. Similarly, alternatives are presented in order to reduce the thermal load and its impact on the cost of energy consumption. In the exercise of this project, 4 air handling units, a 650kW water chiller, and the addition of a cooling tower are necessary to ensure the correct handling of the air in the room. It becomes necessary to resort to solutions that make the best use of the cooled air, using air recovery systems to the handling units in order to reduce the load ends. to vacate. In addition, as a possible follow-up to this project, it is proposed to carry out a study for the implementation of renewable energies that help reduce the electrical load taken from the system in such a way that the viability of the implementation of this project increases, taking into account that the greatest disadvantage of Barranquilla is the large amount of heat that must be dislodged due to solar radiation, the same reason that could make this proposal feasible.
publishDate 2021
dc.date.accessioned.none.fl_str_mv 2021-06-10T20:50:23Z
dc.date.available.none.fl_str_mv 2021-06-10T20:50:23Z
dc.date.issued.none.fl_str_mv 2021-05-05
dc.type.es_ES.fl_str_mv article
dc.type.coar.fl_str_mv http://purl.org/coar/resource_type/c_6501
dc.identifier.uri.none.fl_str_mv http://hdl.handle.net/10584/9573
url http://hdl.handle.net/10584/9573
dc.language.iso.es_ES.fl_str_mv spa
language spa
dc.rights.es_ES.fl_str_mv Universidad del Norte
dc.rights.coar.fl_str_mv http://purl.org/coar/access_right/c_abf2
rights_invalid_str_mv Universidad del Norte
http://purl.org/coar/access_right/c_abf2
dc.publisher.es_ES.fl_str_mv Barranquilla, Universidad del Norte, 2021
institution Universidad del Norte
bitstream.url.fl_str_mv https://manglar.uninorte.edu.co/bitstream/10584/9573/1/Proyecto%20Final%20%28Pacheco%20-%20Prieto%20-%20Robles%29.docx.pdf
https://manglar.uninorte.edu.co/bitstream/10584/9573/2/planta%20completa.png
https://manglar.uninorte.edu.co/bitstream/10584/9573/3/license.txt
bitstream.checksum.fl_str_mv 42cfeaf9fbb33d5b07923f89bddfc808
2c7fbaf006bfc6584ea0872c88196f04
8a4605be74aa9ea9d79846c1fba20a33
bitstream.checksumAlgorithm.fl_str_mv MD5
MD5
MD5
repository.name.fl_str_mv Repositorio Digital de la Universidad del Norte
repository.mail.fl_str_mv mauribe@uninorte.edu.co
_version_ 1812183115354865664
spelling Caballero, HugoDurango, NestorPrieto, AndresPacheco, GabrielRobles, Leonardo2021-06-10T20:50:23Z2021-06-10T20:50:23Z2021-05-05http://hdl.handle.net/10584/9573The design of a refrigeration system of a pharmaceutical warehouse of 968m ^ 2 in the city of Barranquilla is presented, which complies with the standards of good manufacturing practices for the storage of gelatin raw materials which need conditions of 20 ° C with maximum relative humidity of 55%, taking into account the regulations associated with the sizing of air ducts related to the pharmaceutical sector, presenting a basic guide to the guidelines to follow for sizing air ducts, cold water production machines and calculations of thermal load received by the enclosure, leaving 3d models available to the reader that show in detail the layout of the equipment and the calculations to be taken into account for the correct operation of the system. Similarly, alternatives are presented in order to reduce the thermal load and its impact on the cost of energy consumption. In the exercise of this project, 4 air handling units, a 650kW water chiller, and the addition of a cooling tower are necessary to ensure the correct handling of the air in the room. It becomes necessary to resort to solutions that make the best use of the cooled air, using air recovery systems to the handling units in order to reduce the load ends. to vacate. In addition, as a possible follow-up to this project, it is proposed to carry out a study for the implementation of renewable energies that help reduce the electrical load taken from the system in such a way that the viability of the implementation of this project increases, taking into account that the greatest disadvantage of Barranquilla is the large amount of heat that must be dislodged due to solar radiation, the same reason that could make this proposal feasible.Se presenta el diseño del sistema de refrigeración de una bodega farmacéutica de 968m^2 en la ciudad de Barranquilla, el cual cumple con las normas de buenas prácticas de manufactura para el almacenaje de materias primas de gelatinas las cuales necesitan condiciones de 20°C con humedad relativa máxima de 55%, teniendo en cuenta la normatividad asociada al dimensionamiento de ductos de aire relacionados al sector farmacéutico presentando una guía básica de los lineamientos a seguir para el dimensionamiento de los ductos de aire, máquinas de producción de agua fría y cálculos de carga térmica que recibe el recinto, dejando a disponibilidad del lector modelos en 3d que muestren de forma detallada la disposición de los equipos y los cálculos a tener en cuenta para el correcto funcionamiento del sistema. De igual forma se presentan alternativas que ayuden a reducir la carga térmica y su impacto en el costo de consumo energético. En el ejercicio de este proyecto son necesarios 4 unidades manejadoras de aire, un chiller de agua de 650kW y añadir una torre de enfriamiento para asegurar el correcto manejo del aire en el recinto. Se vuelve necesario recurrir a soluciones que aprovechen de la mejor manera el aire refrigerado, usando sistemas de recuperación de aire a las unidades manejadoras con el fin de reducir la carga termina. a desalojar. Además como posible seguimiento a este proyecto se propone realizar un estudio para la implementación de energías renovables que ayuden a disminuir la carga eléctrica tomada del sistema de tal forma que aumente la viabilidad de la implementación de este proyecto, teniendo en cuenta que la mayor desventaja de Barranquilla es la gran cantidad de calor que debe desalojar debido a la radiación solar, misma razón que podria volver factible dicha propuesta.spaBarranquilla, Universidad del Norte, 2021Universidad del Nortehttp://purl.org/coar/access_right/c_abf2chillerrefigeracioncarga termicatorre de enfriamientoacondicionamiento de airehumedad relativaaislamientocalorUnidad manejadoraAir-handling unitChillerRefrigerationThermal chargueair conditioningrelative humidityIsolationHeatDiseño de un sistema de refrigeración para naves industriales del sector farmacéutico en la ciudad de BarranquillaRefrigeration system design for industrial warehouses on pharmaceutical sector in Barranquilla cityarticlehttp://purl.org/coar/resource_type/c_6501ORIGINALProyecto Final (Pacheco - Prieto - Robles).docx.pdfProyecto Final (Pacheco - Prieto - Robles).docx.pdfapplication/pdf7035051https://manglar.uninorte.edu.co/bitstream/10584/9573/1/Proyecto%20Final%20%28Pacheco%20-%20Prieto%20-%20Robles%29.docx.pdf42cfeaf9fbb33d5b07923f89bddfc808MD51planta completa.pngplanta completa.pngArticulo Principalimage/png208387https://manglar.uninorte.edu.co/bitstream/10584/9573/2/planta%20completa.png2c7fbaf006bfc6584ea0872c88196f04MD52LICENSElicense.txtlicense.txttext/plain; charset=utf-81748https://manglar.uninorte.edu.co/bitstream/10584/9573/3/license.txt8a4605be74aa9ea9d79846c1fba20a33MD5310584/9573oai:manglar.uninorte.edu.co:10584/95732021-06-10 15:50:24.008Repositorio Digital de la Universidad del Nortemauribe@uninorte.edu.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