Diseño de acondicionamiento de aire y ventilacion en las zonas criticas del Hospital Camino Nuevo Barraquilla

This engineering project aims to design the air conditioning and mechanical ventilation system of the critical areas of the Camino Nuevo Barranquilla Hospital, meeting the technical requirements, also seeks to meet customer expectations, taking into account the current context of the pandemic due to...

Full description

Autores:
Mezamell Rodelo, Álvaro José
Ortega Gutiérrez, Jafeth Jarith
Tuirán Pérez, Marcos Enrique
Orozco D'farnesio, Luisa María
Tipo de recurso:
Fecha de publicación:
2021
Institución:
Universidad del Norte
Repositorio:
Repositorio Uninorte
Idioma:
spa
OAI Identifier:
oai:manglar.uninorte.edu.co:10584/9575
Acceso en línea:
http://hdl.handle.net/10584/9575
Palabra clave:
Caida de presion, chiller, red de agua fria, manejadoras, filtros, ductos, ventilador
Pressure drop, chiller, cold water network, handlers, filters, ducts, fan
Rights
License
Universidad del Norte
id REPOUNORT2_53759ef486bc64099ee2a6ba7468dee6
oai_identifier_str oai:manglar.uninorte.edu.co:10584/9575
network_acronym_str REPOUNORT2
network_name_str Repositorio Uninorte
repository_id_str
dc.title.es_ES.fl_str_mv Diseño de acondicionamiento de aire y ventilacion en las zonas criticas del Hospital Camino Nuevo Barraquilla
dc.title.en_US.fl_str_mv Design of air conditioning and ventilation in critical areas of Camino Nuevo Barraquilla Hospital.
title Diseño de acondicionamiento de aire y ventilacion en las zonas criticas del Hospital Camino Nuevo Barraquilla
spellingShingle Diseño de acondicionamiento de aire y ventilacion en las zonas criticas del Hospital Camino Nuevo Barraquilla
Caida de presion, chiller, red de agua fria, manejadoras, filtros, ductos, ventilador
Pressure drop, chiller, cold water network, handlers, filters, ducts, fan
title_short Diseño de acondicionamiento de aire y ventilacion en las zonas criticas del Hospital Camino Nuevo Barraquilla
title_full Diseño de acondicionamiento de aire y ventilacion en las zonas criticas del Hospital Camino Nuevo Barraquilla
title_fullStr Diseño de acondicionamiento de aire y ventilacion en las zonas criticas del Hospital Camino Nuevo Barraquilla
title_full_unstemmed Diseño de acondicionamiento de aire y ventilacion en las zonas criticas del Hospital Camino Nuevo Barraquilla
title_sort Diseño de acondicionamiento de aire y ventilacion en las zonas criticas del Hospital Camino Nuevo Barraquilla
dc.creator.fl_str_mv Mezamell Rodelo, Álvaro José
Ortega Gutiérrez, Jafeth Jarith
Tuirán Pérez, Marcos Enrique
Orozco D'farnesio, Luisa María
dc.contributor.advisor.none.fl_str_mv Caballero Flores, Hugo Cesar
Solano Pérez, José de Jesús
dc.contributor.author.none.fl_str_mv Mezamell Rodelo, Álvaro José
Ortega Gutiérrez, Jafeth Jarith
Tuirán Pérez, Marcos Enrique
Orozco D'farnesio, Luisa María
dc.subject.es_ES.fl_str_mv Caida de presion, chiller, red de agua fria, manejadoras, filtros, ductos, ventilador
topic Caida de presion, chiller, red de agua fria, manejadoras, filtros, ductos, ventilador
Pressure drop, chiller, cold water network, handlers, filters, ducts, fan
dc.subject.en_US.fl_str_mv Pressure drop, chiller, cold water network, handlers, filters, ducts, fan
description This engineering project aims to design the air conditioning and mechanical ventilation system of the critical areas of the Camino Nuevo Barranquilla Hospital, meeting the technical requirements, also seeks to meet customer expectations, taking into account the current context of the pandemic due to Covid-19. The design was carried out based on ASHRAE standards 170 and 52.2, which dictate the guidelines to be followed in the design process for medical facilities. Camino Nuevo Barranquilla Hospital is under construction and is part of the 2020-2023 Development Plan. The areas that were designed in this building are: emergency room, observation rooms, operating rooms, preparation room, recovery room, isolation rooms and Intensive Care Units (ICU). The design methodology used in this project includes the basic design stages, in which the thermal load of the spaces to be conditioned was calculated; the conceptual design stage, where the different design alternatives that could solve the design problem were proposed. Thus, in the conceptual design stage, the different types of air conditioning systems were analyzed and compared, and an air-condensed chiller system was selected as the winning alternative. Then, in the detailed design stage, the air and chilled water distribution systems were sized. In addition, pumps, accessories, chiller units, handlers and filter banks were selected. In addition to the above, a risk analysis was performed for the assembly of equipment and distribution systems. Finally, with the help of experts in the field, recommendations were made regarding the electrical network and the control system for the correct operation of the equipment, since these were outside the initial scope.
publishDate 2021
dc.date.accessioned.none.fl_str_mv 2021-06-10T20:53:18Z
dc.date.available.none.fl_str_mv 2021-06-10T20:53:18Z
dc.date.issued.none.fl_str_mv 2021-06-01
dc.type.es_ES.fl_str_mv article
dc.type.coar.fl_str_mv http://purl.org/coar/resource_type/c_6501
dc.identifier.uri.none.fl_str_mv http://hdl.handle.net/10584/9575
url http://hdl.handle.net/10584/9575
dc.language.iso.es_ES.fl_str_mv spa
language spa
dc.rights.es_ES.fl_str_mv Universidad del Norte
dc.rights.coar.fl_str_mv http://purl.org/coar/access_right/c_abf2
rights_invalid_str_mv Universidad del Norte
http://purl.org/coar/access_right/c_abf2
dc.publisher.es_ES.fl_str_mv Barranquilla, Universidad del Norte, 2021
institution Universidad del Norte
bitstream.url.fl_str_mv https://manglar.uninorte.edu.co/bitstream/10584/9575/1/PROYECTO%20FINAL.jpeg
https://manglar.uninorte.edu.co/bitstream/10584/9575/2/PROYECTO%20FINAL.pdf
https://manglar.uninorte.edu.co/bitstream/10584/9575/3/license.txt
bitstream.checksum.fl_str_mv 9db8a7e55c31b522fcaf32468b8d9573
691ac4d40f2f363ed79b92cfb2a0cda4
8a4605be74aa9ea9d79846c1fba20a33
bitstream.checksumAlgorithm.fl_str_mv MD5
MD5
MD5
repository.name.fl_str_mv Repositorio Digital de la Universidad del Norte
repository.mail.fl_str_mv mauribe@uninorte.edu.co
_version_ 1812183088191504384
spelling Caballero Flores, Hugo CesarSolano Pérez, José de JesúsMezamell Rodelo, Álvaro JoséOrtega Gutiérrez, Jafeth JarithTuirán Pérez, Marcos EnriqueOrozco D'farnesio, Luisa María2021-06-10T20:53:18Z2021-06-10T20:53:18Z2021-06-01http://hdl.handle.net/10584/9575This engineering project aims to design the air conditioning and mechanical ventilation system of the critical areas of the Camino Nuevo Barranquilla Hospital, meeting the technical requirements, also seeks to meet customer expectations, taking into account the current context of the pandemic due to Covid-19. The design was carried out based on ASHRAE standards 170 and 52.2, which dictate the guidelines to be followed in the design process for medical facilities. Camino Nuevo Barranquilla Hospital is under construction and is part of the 2020-2023 Development Plan. The areas that were designed in this building are: emergency room, observation rooms, operating rooms, preparation room, recovery room, isolation rooms and Intensive Care Units (ICU). The design methodology used in this project includes the basic design stages, in which the thermal load of the spaces to be conditioned was calculated; the conceptual design stage, where the different design alternatives that could solve the design problem were proposed. Thus, in the conceptual design stage, the different types of air conditioning systems were analyzed and compared, and an air-condensed chiller system was selected as the winning alternative. Then, in the detailed design stage, the air and chilled water distribution systems were sized. In addition, pumps, accessories, chiller units, handlers and filter banks were selected. In addition to the above, a risk analysis was performed for the assembly of equipment and distribution systems. Finally, with the help of experts in the field, recommendations were made regarding the electrical network and the control system for the correct operation of the equipment, since these were outside the initial scope.El presente proyecto de ingeniería tiene como objetivo realizar el diseño del sistema de aire acondicionado y ventilación mecánica de las áreas críticas del Hospital Camino Nuevo Barranquilla, cumpliendo con los requerimientos técnicos, además se busca satisfacer las expectativas del cliente, teniendo en cuenta el contexto actual de la pandemia debido al Covid-19. El diseño se realizó en base a los estándares 170 y 52.2 de ASHRAE, los cuales dictan las directrices a seguir en el proceso de diseño para el caso de las instalaciones médicas. El Hospital Camino Nuevo Barranquilla se encuentra en construcción y hace parte del Plan de Desarrollo 2020-2023. Las áreas que se diseñaron en este edificio son: sala de urgencias, salas de observación, quirófanos, sala de preparación, sala de recuperación, cuartos de aislados y Unidades de Cuidados Intensivos (UCI). La metodología de diseño empleado en este proyecto incluye las etapas de diseño básico, donde se calculó la carga térmica de los espacios a acondicionar; la etapa de diseño conceptual, se plantearon las diferentes alternativas de diseño. Así, en la etapa de diseño conceptual, se analizaron y compararon los diferentes tipos de sistemas de aire acondicionado y, se seleccionó como alternativa ganadora un sistema de Chiller condensado por aire. Luego, en la etapa del diseño de detalle, se realizó el dimensionamiento de los sistemas de distribución de aire y de agua fría. Además, se seleccionaron bombas, accesorios, unidades chiller, manejadoras y bancos de filtros. Adicionalmente a lo mencionado anteriormente, se realizó un análisis de riesgo para el montaje de equipos y sistemas de distribución. Por último, con la ayuda de expertos en el tema, se dieron recomendaciones en cuanto a la red eléctrica y el sistema de control para el correcto funcionamiento de los equipos, debido a que estos estaban fuera del alcance inicial.spaBarranquilla, Universidad del Norte, 2021Universidad del Nortehttp://purl.org/coar/access_right/c_abf2Caida de presion, chiller, red de agua fria, manejadoras, filtros, ductos, ventiladorPressure drop, chiller, cold water network, handlers, filters, ducts, fanDiseño de acondicionamiento de aire y ventilacion en las zonas criticas del Hospital Camino Nuevo BarraquillaDesign of air conditioning and ventilation in critical areas of Camino Nuevo Barraquilla Hospital.articlehttp://purl.org/coar/resource_type/c_6501ORIGINALPROYECTO FINAL.jpegPROYECTO FINAL.jpegimage/jpeg40966https://manglar.uninorte.edu.co/bitstream/10584/9575/1/PROYECTO%20FINAL.jpeg9db8a7e55c31b522fcaf32468b8d9573MD51PROYECTO FINAL.pdfPROYECTO FINAL.pdfapplication/pdf212384https://manglar.uninorte.edu.co/bitstream/10584/9575/2/PROYECTO%20FINAL.pdf691ac4d40f2f363ed79b92cfb2a0cda4MD52LICENSElicense.txtlicense.txttext/plain; charset=utf-81748https://manglar.uninorte.edu.co/bitstream/10584/9575/3/license.txt8a4605be74aa9ea9d79846c1fba20a33MD5310584/9575oai:manglar.uninorte.edu.co:10584/95752021-06-10 15:53:19.042Repositorio Digital de la Universidad del Nortemauribe@uninorte.edu.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