A multi-objective approach based on soft computing techniques for production scheduling in Corrugator manufacturing plants
AbstractThe corrugator scheduling problem is a difficult problem due to a wide varietyof parameters and optimisation objectives that have to be accounted for andthe relationships among them. Majority of solution techniques proposed so faronly deal with minimizing either, the trim waste or pattern ch...
- Autores:
-
Germán A. Velásquez D.; Empaques Industriales
Gisella Bellini; Universidad del Norte
Carlos D. Paternina-Arboleda; Universidad del Norte
- Tipo de recurso:
- Fecha de publicación:
- 2011
- Institución:
- Universidad del Norte
- Repositorio:
- Repositorio Uninorte
- Idioma:
- eng
- OAI Identifier:
- oai:manglar.uninorte.edu.co:10584/3954
- Acceso en línea:
- http://rcientificas.uninorte.edu.co/index.php/ingenieria/article/view/2113
http://hdl.handle.net/10584/3954
- Palabra clave:
- Rights
- License
- http://purl.org/coar/access_right/c_abf2
id |
REPOUNORT2_259bdc5fd5cc5f690a294a865dc9fa4f |
---|---|
oai_identifier_str |
oai:manglar.uninorte.edu.co:10584/3954 |
network_acronym_str |
REPOUNORT2 |
network_name_str |
Repositorio Uninorte |
repository_id_str |
|
spelling |
Germán A. Velásquez D.; Empaques IndustrialesGisella Bellini; Universidad del NorteCarlos D. Paternina-Arboleda; Universidad del NorteColombia2013-08-31T23:10:11Z2013-08-31T23:10:11Z2011-08-13http://rcientificas.uninorte.edu.co/index.php/ingenieria/article/view/2113http://hdl.handle.net/10584/3954AbstractThe corrugator scheduling problem is a difficult problem due to a wide varietyof parameters and optimisation objectives that have to be accounted for andthe relationships among them. Majority of solution techniques proposed so faronly deal with minimizing either, the trim waste or pattern changes, this paperproposes a multi-objective evolutionary algorithm to optimize the WPL objective(weighted planning level) and the cost objectives. Computational experimentswere conducted and results were compared against the current shop schedulingmethod used at a real-life corrugator manufacturing facility. A series of experimentswere also conducted to determine the evolutionary algorithm parameters. Theimprovement on performance metrics encourages us to actually implement thealgorithm at the factory.The corrugator scheduling problem is a difficult problem due to a wide varietyof parameters and optimisation objectives that have to be accounted for andthe relationships among them. Majority of solution techniques proposed so faronly deal with minimizing either, the trim waste or pattern changes, this paperproposes a multi-objective evolutionary algorithm to optimize the WPL objective(weighted planning level) and the cost objectives. Computational experimentswere conducted and results were compared against the current shop schedulingmethod used at a real-life corrugator manufacturing facility. A series of experimentswere also conducted to determine the evolutionary algorithm parameters. Theimprovement on performance metrics encourages us to actually implement thealgorithm at the factory.application/pdfengUniversidad del NorteRevista Científica Ingeniería y Desarrollo; No 21 (2007): Enero - Junio; 73-92instname:Universidad del Nortereponame:Repositorio Digital de la Universidad del NorteA multi-objective approach based on soft computing techniques for production scheduling in Corrugator manufacturing plantsA multi-objective approach based on soft computing techniques for production scheduling in Corrugator manufacturing plantsarticlepublishedVersionhttp://purl.org/coar/version/c_970fb48d4fbd8a85http://purl.org/coar/resource_type/c_6501http://purl.org/coar/access_right/c_abf210584/3954oai:172.16.14.36:10584/39542015-10-07 01:47:20.104Repositorio Digital de la Universidad del Nortemauribe@uninorte.edu.co |
dc.title.none.fl_str_mv |
A multi-objective approach based on soft computing techniques for production scheduling in Corrugator manufacturing plants A multi-objective approach based on soft computing techniques for production scheduling in Corrugator manufacturing plants |
title |
A multi-objective approach based on soft computing techniques for production scheduling in Corrugator manufacturing plants |
spellingShingle |
A multi-objective approach based on soft computing techniques for production scheduling in Corrugator manufacturing plants |
title_short |
A multi-objective approach based on soft computing techniques for production scheduling in Corrugator manufacturing plants |
title_full |
A multi-objective approach based on soft computing techniques for production scheduling in Corrugator manufacturing plants |
title_fullStr |
A multi-objective approach based on soft computing techniques for production scheduling in Corrugator manufacturing plants |
title_full_unstemmed |
A multi-objective approach based on soft computing techniques for production scheduling in Corrugator manufacturing plants |
title_sort |
A multi-objective approach based on soft computing techniques for production scheduling in Corrugator manufacturing plants |
dc.creator.fl_str_mv |
Germán A. Velásquez D.; Empaques Industriales Gisella Bellini; Universidad del Norte Carlos D. Paternina-Arboleda; Universidad del Norte |
dc.contributor.author.none.fl_str_mv |
Germán A. Velásquez D.; Empaques Industriales Gisella Bellini; Universidad del Norte Carlos D. Paternina-Arboleda; Universidad del Norte |
description |
AbstractThe corrugator scheduling problem is a difficult problem due to a wide varietyof parameters and optimisation objectives that have to be accounted for andthe relationships among them. Majority of solution techniques proposed so faronly deal with minimizing either, the trim waste or pattern changes, this paperproposes a multi-objective evolutionary algorithm to optimize the WPL objective(weighted planning level) and the cost objectives. Computational experimentswere conducted and results were compared against the current shop schedulingmethod used at a real-life corrugator manufacturing facility. A series of experimentswere also conducted to determine the evolutionary algorithm parameters. Theimprovement on performance metrics encourages us to actually implement thealgorithm at the factory. |
publishDate |
2011 |
dc.date.issued.none.fl_str_mv |
2011-08-13 |
dc.date.accessioned.none.fl_str_mv |
2013-08-31T23:10:11Z |
dc.date.available.none.fl_str_mv |
2013-08-31T23:10:11Z |
dc.type.none.fl_str_mv |
article |
dc.type.coarversion.fl_str_mv |
http://purl.org/coar/version/c_970fb48d4fbd8a85 |
dc.type.coar.fl_str_mv |
http://purl.org/coar/resource_type/c_6501 |
dc.type.hasVersion.none.fl_str_mv |
publishedVersion |
dc.identifier.other.none.fl_str_mv |
http://rcientificas.uninorte.edu.co/index.php/ingenieria/article/view/2113 |
dc.identifier.uri.none.fl_str_mv |
http://hdl.handle.net/10584/3954 |
url |
http://rcientificas.uninorte.edu.co/index.php/ingenieria/article/view/2113 http://hdl.handle.net/10584/3954 |
dc.language.iso.none.fl_str_mv |
eng |
language |
eng |
dc.relation.ispartof.none.fl_str_mv |
Revista Científica Ingeniería y Desarrollo; No 21 (2007): Enero - Junio; 73-92 |
dc.rights.coar.fl_str_mv |
http://purl.org/coar/access_right/c_abf2 |
rights_invalid_str_mv |
http://purl.org/coar/access_right/c_abf2 |
dc.format.none.fl_str_mv |
application/pdf |
dc.coverage.spatial.none.fl_str_mv |
Colombia |
dc.publisher.none.fl_str_mv |
Universidad del Norte |
publisher.none.fl_str_mv |
Universidad del Norte |
dc.source.none.fl_str_mv |
instname:Universidad del Norte reponame:Repositorio Digital de la Universidad del Norte |
instname_str |
Universidad del Norte |
institution |
Universidad del Norte |
reponame_str |
Repositorio Digital de la Universidad del Norte |
collection |
Repositorio Digital de la Universidad del Norte |
repository.name.fl_str_mv |
Repositorio Digital de la Universidad del Norte |
repository.mail.fl_str_mv |
mauribe@uninorte.edu.co |
_version_ |
1818112295593574400 |