Impactos sociales y económicos de la hidroeléctrica en Ituango
La hidroeléctrica Ituango es el proyecto de generación de energía más grande de Colombia y que tiene una importancia enorme para los pueblos que están ubicados en el área de influencia de esta obra. Ituango es un municipio ubicado en el norte lejano del departamento de Antioquia, que posee unas cara...
- Autores:
- Tipo de recurso:
- Fecha de publicación:
- 2014
- Institución:
- Universidad de Medellín
- Repositorio:
- Repositorio UDEM
- Idioma:
- spa
- OAI Identifier:
- oai:repository.udem.edu.co:11407/2154
- Acceso en línea:
- http://hdl.handle.net/11407/2154
- Palabra clave:
- Hydroelectric
Community
Socio-economic
Impacts
Infrastructure
Hidroeléctrica
Comunidad
Socioeconómico
Impactos
Infraestructura
Hidroeléctrica
Comunidade
Sócio-econômicas
Impactos
Infra-estrutura
- Rights
- License
- http://creativecommons.org/licenses/by-nc-sa/4.0/
id |
REPOUDEM2_5135b353868ef2a76a33e32c1d92cc2b |
---|---|
oai_identifier_str |
oai:repository.udem.edu.co:11407/2154 |
network_acronym_str |
REPOUDEM2 |
network_name_str |
Repositorio UDEM |
repository_id_str |
|
dc.title.spa.fl_str_mv |
Impactos sociales y económicos de la hidroeléctrica en Ituango |
title |
Impactos sociales y económicos de la hidroeléctrica en Ituango |
spellingShingle |
Impactos sociales y económicos de la hidroeléctrica en Ituango Hydroelectric Community Socio-economic Impacts Infrastructure Hidroeléctrica Comunidad Socioeconómico Impactos Infraestructura Hidroeléctrica Comunidade Sócio-econômicas Impactos Infra-estrutura |
title_short |
Impactos sociales y económicos de la hidroeléctrica en Ituango |
title_full |
Impactos sociales y económicos de la hidroeléctrica en Ituango |
title_fullStr |
Impactos sociales y económicos de la hidroeléctrica en Ituango |
title_full_unstemmed |
Impactos sociales y económicos de la hidroeléctrica en Ituango |
title_sort |
Impactos sociales y económicos de la hidroeléctrica en Ituango |
dc.contributor.role.eng.fl_str_mv |
advisor |
dc.contributor.spa.fl_str_mv |
Correa Jaramillo, Juan Guillermo |
dc.subject.spa.fl_str_mv |
Hydroelectric Community Socio-economic Impacts Infrastructure Hidroeléctrica Comunidad Socioeconómico Impactos Infraestructura Hidroeléctrica Comunidade Sócio-econômicas Impactos Infra-estrutura |
topic |
Hydroelectric Community Socio-economic Impacts Infrastructure Hidroeléctrica Comunidad Socioeconómico Impactos Infraestructura Hidroeléctrica Comunidade Sócio-econômicas Impactos Infra-estrutura |
description |
La hidroeléctrica Ituango es el proyecto de generación de energía más grande de Colombia y que tiene una importancia enorme para los pueblos que están ubicados en el área de influencia de esta obra. Ituango es un municipio ubicado en el norte lejano del departamento de Antioquia, que posee unas características especiales y que ha cambiado considerablemente su forma de vivir por la llegada del proyecto hidroeléctrico, considerando la magnitud de la obra, la llegada de más personas a la zona y el cambio socioeconómico que surge a raíz de esta situación. |
publishDate |
2014 |
dc.date.created.none.fl_str_mv |
2014-01-01 |
dc.date.accessioned.none.fl_str_mv |
2016-06-03T20:53:32Z |
dc.date.available.none.fl_str_mv |
2016-06-03T20:53:32Z |
dc.type.coar.fl_str_mv |
http://purl.org/coar/resource_type/c_7a1f |
dc.type.local.spa.fl_str_mv |
Trabajo de grado |
dc.type.driver.none.fl_str_mv |
info:eu-repo/semantics/bachelorThesis |
dc.identifier.other.spa.fl_str_mv |
CD-ROM 7690 2014 |
dc.identifier.uri.none.fl_str_mv |
http://hdl.handle.net/11407/2154 |
identifier_str_mv |
CD-ROM 7690 2014 |
url |
http://hdl.handle.net/11407/2154 |
dc.language.iso.none.fl_str_mv |
spa |
language |
spa |
dc.relation.hasversion.none.fl_str_mv |
publishedVersion |
dc.relation.citationstartpage.spa.fl_str_mv |
1 |
dc.relation.citationendpage.spa.fl_str_mv |
83 |
dc.rights.coar.fl_str_mv |
http://purl.org/coar/access_right/c_abf2 |
dc.rights.uri.*.fl_str_mv |
http://creativecommons.org/licenses/by-nc-sa/4.0/ |
rights_invalid_str_mv |
http://creativecommons.org/licenses/by-nc-sa/4.0/ http://purl.org/coar/access_right/c_abf2 |
dc.format.extent.spa.fl_str_mv |
p.1-83 |
dc.format.medium.spa.fl_str_mv |
Electrónico |
dc.format.mimetype.none.fl_str_mv |
application/pdf |
dc.coverage.spa.fl_str_mv |
Lat: 06 15 00 N degrees minutes Lat: 6.2500 decimal degreesLong: 075 36 00 W degrees minutes Long: -75.6000 decimal degrees |
dc.publisher.spa.fl_str_mv |
Universidad de Medellín. Facultad de Ciencias Económicas y Administrativas |
dc.publisher.program.spa.fl_str_mv |
Administración de Empresas |
institution |
Universidad de Medellín |
bitstream.url.fl_str_mv |
http://repository.udem.edu.co/bitstream/11407/2154/3/TG_AE_3.pdf.jpg http://repository.udem.edu.co/bitstream/11407/2154/4/TG_AE_3_Anexo.pdf.jpg http://repository.udem.edu.co/bitstream/11407/2154/1/TG_AE_3.pdf http://repository.udem.edu.co/bitstream/11407/2154/2/TG_AE_3_Anexo.pdf |
bitstream.checksum.fl_str_mv |
e1e5cf2c7c3f11b1848288cf69a1896c d3709a373bf35c18c855fb9286dce3bd 706f83a18994e4b4f0dcc62e837c5622 58db057b3189eab64ed971d386a468a8 |
bitstream.checksumAlgorithm.fl_str_mv |
MD5 MD5 MD5 MD5 |
repository.name.fl_str_mv |
Repositorio Institucional Universidad de Medellin |
repository.mail.fl_str_mv |
repositorio@udem.edu.co |
_version_ |
1814159145182429184 |
spelling |
Correa Jaramillo, Juan GuillermoadvisorÚsuga Montoya, Esteban2016-06-03T20:53:32Z2016-06-03T20:53:32Z2014-01-01CD-ROM 7690 2014http://hdl.handle.net/11407/2154La hidroeléctrica Ituango es el proyecto de generación de energía más grande de Colombia y que tiene una importancia enorme para los pueblos que están ubicados en el área de influencia de esta obra. Ituango es un municipio ubicado en el norte lejano del departamento de Antioquia, que posee unas características especiales y que ha cambiado considerablemente su forma de vivir por la llegada del proyecto hidroeléctrico, considerando la magnitud de la obra, la llegada de más personas a la zona y el cambio socioeconómico que surge a raíz de esta situación.The hydroelectric Ituango is Colombia's largest power generation project and has an enormous importance for the villages are located in the area of influence of this work. Ituango is a municipality located in the far north of the Department of Antioquia, has special characteristics and which has considerably changed their way of life by the arrival of the hydroelectric project, considering the magnitude of the work, the arrival of more people to the area and the socio-economic change that arises from this situation. There are two very significant actors converge around the construction of the Project EPM son and the community of the municipality of Ituango. The opportunity arrived to this territory, has made it possible to find different impacts, both negative and positive, for society and the economy. In this way will be EPM commissioned to combat the negative impacts of the project and the community who can take advantage the positive impacts at social and economic level to search for the progress and development of the village.A hidrelétrica Ituango é o maior projeto de geração de energia da Colômbia e tem uma enorme importância para as aldeias localizadas na área de influência dessa trabalho. Ituango é uma cidade localizada no extremo norte do departamento de Antioquia, que tem características especiais e que mudou seu modo de vida consideravelmente com a chegada do projeto hidrelétrico, considerando a magnitude da obra, a chegada de mais pessoas para a área e a mudança sócio-econômica que surge a partir desta situação. Existem dois atores muito significativos que convergem em torno da construção do projeto, que são a EPM e a comunidade do município de Ituango. A oportunidade que veio a este território, pode para encontrar diferentes impactos, negativos e positivos, para a sociedade e a economia. Desta forma será EPM encomendado para combater os impactos negativos do projeto e a comunidade que pode tornar positiva impactos socialmente e economicamente para o progresso e o desenvolvimento das pessoas. A hidrelétrica Ituango é o maior projeto de geração de energia da Colômbia e tem uma enorme importância para as aldeias localizadas na área de influência dessa trabalho. Ituango é uma cidade localizada no extremo norte do departamento de Antioquia, que tem características especiais e que mudou seu modo de vida consideravelmente com a chegada do projeto hidrelétrico, considerando a magnitude da obra, a chegada de mais pessoas para a área e a mudança sócio-econômica que surge a partir desta situação. Existem dois atores muito significativos que convergem em torno da construção do projeto, que são a EPM e a comunidade do município de Ituango. A oportunidade que veio a este território, pode para encontrar diferentes impactos, negativos e positivos, para a sociedade e a economia. Desta forma será EPM encomendado para combater os impactos negativos do projeto e a comunidade que pode tornar positiva impactos socialmente e economicamente para o progresso e o desenvolvimento das pessoas. A hidrelétrica Ituango é o maior projeto de geração de energia da Colômbia e tem uma enorme importância para as aldeias localizadas na área de influência dessa trabalho. Ituango é uma cidade localizada no extremo norte do departamento de Antioquia, que tem características especiais e que mudou seu modo de vida consideravelmente com a chegada do projeto hidrelétrico, considerando a magnitude da obra, a chegada de mais pessoas para a área e a mudança sócio-econômica que surge a partir desta situação. Existem dois atores muito significativos que convergem em torno da construção do projeto, que são a EPM e a comunidade do município de Ituango. A oportunidade que veio a este território, pode para encontrar diferentes impactos, negativos e positivos, para a sociedade e a economia. Desta forma será EPM encomendado para combater os impactos negativos do projeto e a comunidade que pode tornar positiva impactos socialmente e economicamente para o progresso e o desenvolvimento das pessoas. A hidrelétrica Ituango é o maior projeto de geração de energia da Colômbia e tem uma enorme importância para as aldeias localizadas na área de influência dessa trabalho. Ituango é uma cidade localizada no extremo norte do departamento de Antioquia, que tem características especiais e que mudou seu modo de vida consideravelmente com a chegada do projeto hidrelétrico, considerando a magnitude da obra, a chegada de mais pessoas para a área e a mudança sócio-econômica que surge a partir desta situação. Existem dois atores muito significativos que convergem em torno da construção do projeto, que são a EPM e a comunidade do município de Ituango. A oportunidade que veio a este território, pode para encontrar diferentes impactos, negativos e positivos, para a sociedade e a economia. Desta forma será EPM encomendado para combater os impactos negativos do projeto e a comunidade que pode tornar positiva impactos socialmente e economicamente para o progresso e o desenvolvimento das pessoas.p.1-83Electrónicoapplication/pdfspaUniversidad de Medellín. Facultad de Ciencias Económicas y AdministrativasAdministración de EmpresaspublishedVersion183http://creativecommons.org/licenses/by-nc-sa/4.0/http://purl.org/coar/access_right/c_abf2HydroelectricCommunitySocio-economicImpactsInfrastructureHidroeléctricaComunidadSocioeconómicoImpactosInfraestructuraHidroeléctricaComunidadeSócio-econômicasImpactosInfra-estruturaImpactos sociales y económicos de la hidroeléctrica en ItuangoComunidad Universidad de MedellínLat: 06 15 00 N degrees minutes Lat: 6.2500 decimal degreesLong: 075 36 00 W degrees minutes Long: -75.6000 decimal degreesMedellínTrabajo de gradoinfo:eu-repo/semantics/bachelorThesishttp://purl.org/coar/resource_type/c_7a1fTHUMBNAILTG_AE_3.pdf.jpgTG_AE_3.pdf.jpgIM Thumbnailimage/jpeg4242http://repository.udem.edu.co/bitstream/11407/2154/3/TG_AE_3.pdf.jpge1e5cf2c7c3f11b1848288cf69a1896cMD53TG_AE_3_Anexo.pdf.jpgTG_AE_3_Anexo.pdf.jpgIM Thumbnailimage/jpeg7391http://repository.udem.edu.co/bitstream/11407/2154/4/TG_AE_3_Anexo.pdf.jpgd3709a373bf35c18c855fb9286dce3bdMD54ORIGINALTG_AE_3.pdfTG_AE_3.pdfapplication/pdf782118http://repository.udem.edu.co/bitstream/11407/2154/1/TG_AE_3.pdf706f83a18994e4b4f0dcc62e837c5622MD51TG_AE_3_Anexo.pdfTG_AE_3_Anexo.pdfapplication/pdf598768http://repository.udem.edu.co/bitstream/11407/2154/2/TG_AE_3_Anexo.pdf58db057b3189eab64ed971d386a468a8MD5211407/2154oai:repository.udem.edu.co:11407/21542020-05-27 16:28:22.689Repositorio Institucional Universidad de Medellinrepositorio@udem.edu.co |