Discrete event simulation for production planning in modular garment manufacturing systems [Simulación de eventos discretos en la planificación de producción para sistemas de confección modular]
This article aims to solve a NP-Hard production planning problem with stochastic variables in a modular manufacturing plant of a large company.In order to minimize costs per batch amixed programming model is proposed, which is based on results of a discrete simulation model executed in MSExcel and V...
- Autores:
- Tipo de recurso:
- Fecha de publicación:
- 2018
- Institución:
- Universidad de Medellín
- Repositorio:
- Repositorio UDEM
- Idioma:
- spa
- OAI Identifier:
- oai:repository.udem.edu.co:11407/4848
- Acceso en línea:
- http://hdl.handle.net/11407/4848
- Palabra clave:
- Fashion
setup times
Modular manufacturing
clothing
Simulation
discrete events
- Rights
- License
- http://purl.org/coar/access_right/c_16ec
id |
REPOUDEM2_390e19fa2da0a5b6359bdbc559047a42 |
---|---|
oai_identifier_str |
oai:repository.udem.edu.co:11407/4848 |
network_acronym_str |
REPOUDEM2 |
network_name_str |
Repositorio UDEM |
repository_id_str |
|
dc.title.spa.fl_str_mv |
Discrete event simulation for production planning in modular garment manufacturing systems [Simulación de eventos discretos en la planificación de producción para sistemas de confección modular] |
title |
Discrete event simulation for production planning in modular garment manufacturing systems [Simulación de eventos discretos en la planificación de producción para sistemas de confección modular] |
spellingShingle |
Discrete event simulation for production planning in modular garment manufacturing systems [Simulación de eventos discretos en la planificación de producción para sistemas de confección modular] Fashion setup times Modular manufacturing clothing Simulation discrete events |
title_short |
Discrete event simulation for production planning in modular garment manufacturing systems [Simulación de eventos discretos en la planificación de producción para sistemas de confección modular] |
title_full |
Discrete event simulation for production planning in modular garment manufacturing systems [Simulación de eventos discretos en la planificación de producción para sistemas de confección modular] |
title_fullStr |
Discrete event simulation for production planning in modular garment manufacturing systems [Simulación de eventos discretos en la planificación de producción para sistemas de confección modular] |
title_full_unstemmed |
Discrete event simulation for production planning in modular garment manufacturing systems [Simulación de eventos discretos en la planificación de producción para sistemas de confección modular] |
title_sort |
Discrete event simulation for production planning in modular garment manufacturing systems [Simulación de eventos discretos en la planificación de producción para sistemas de confección modular] |
dc.contributor.affiliation.spa.fl_str_mv |
Cano, J.A., Universidad de Medellín;Campo, E.A., ESACS, Escuela Superior en Administración de Cadena de Suministro;India; Gómez, R.A., Universidad Nacional de Colombia |
dc.subject.spa.fl_str_mv |
Fashion setup times Modular manufacturing clothing Simulation discrete events |
topic |
Fashion setup times Modular manufacturing clothing Simulation discrete events |
description |
This article aims to solve a NP-Hard production planning problem with stochastic variables in a modular manufacturing plant of a large company.In order to minimize costs per batch amixed programming model is proposed, which is based on results of a discrete simulation model executed in MSExcel and VBApplications. The simulation model presents variables such as manufacturing modules, setup staff, space and machinery resources, among others.After find the optimal solution of the production problem, it is concluded that the discrete simulation for modular manufacturing systems is adaptable to basic software, allows to propose new scenarios, articulate complex information, customize models and facilitates parameterize alarge number of variables. © 2018 Revista Tecnica de la Facultad de Ingeniera. All rights reserved. |
publishDate |
2018 |
dc.date.accessioned.none.fl_str_mv |
2018-10-31T13:44:16Z |
dc.date.available.none.fl_str_mv |
2018-10-31T13:44:16Z |
dc.date.created.none.fl_str_mv |
2018 |
dc.type.eng.fl_str_mv |
Article |
dc.type.coarversion.fl_str_mv |
http://purl.org/coar/version/c_970fb48d4fbd8a85 |
dc.type.coar.fl_str_mv |
http://purl.org/coar/resource_type/c_6501 http://purl.org/coar/resource_type/c_2df8fbb1 |
dc.type.driver.none.fl_str_mv |
info:eu-repo/semantics/article |
dc.identifier.issn.none.fl_str_mv |
2540770 |
dc.identifier.uri.none.fl_str_mv |
http://hdl.handle.net/11407/4848 |
identifier_str_mv |
2540770 |
url |
http://hdl.handle.net/11407/4848 |
dc.language.iso.none.fl_str_mv |
spa |
language |
spa |
dc.relation.isversionof.spa.fl_str_mv |
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85048641600&partnerID=40&md5=dbff2a3e4d5926f87edc319f57260809 |
dc.relation.citationvolume.spa.fl_str_mv |
41 |
dc.relation.citationissue.spa.fl_str_mv |
1 |
dc.relation.citationstartpage.spa.fl_str_mv |
50 |
dc.relation.citationendpage.spa.fl_str_mv |
58 |
dc.relation.ispartofes.spa.fl_str_mv |
Revista Tecnica de la Facultad de Ingenieria Universidad del Zulia |
dc.relation.references.spa.fl_str_mv |
Kincade, D., Kim, J., Kanakadurga, K., An empirical investigation of apparel production systems and product line groups through the use of collar designs (2013) Journal of Textile and Apparel, Technology and Management, 8 (1), pp. 1-15;Sarache, W., Cespón, R., Ibarra, S., Alonso, P., Modular manufacturing: An alternative to improve the competitiveness in the clothing industry (2004) International Journal of Clothing Science and Technology, 16 (3-4), pp. 301-309;Bonsignorio, F., Molfino, R., An object based virtual reality simulation tool for design validation of a new paradigmmanufacturing facility (2006) IFIP International Federation for Information Processing, 220 (1), pp. 301-308;Ramdass, K., Pretorius, L., Implementation of modular manufacturing in the clothing industry in Kwazulu-Natal: A case study (2011) South African Journal of Industrial Engineering, 22 (1), pp. 167-181;Babu, V.R., Garment production systems - An overview (2006) Textile Magazine, 47 (9), p. 22;Cooper, W., Textile and apparel supply chains for the 21stcentury (2010) JournalofTextileandApparel,Technology andManagement, 6 (4), pp. 1-10;Black, J., Schroer, B., Simulation of an apparel assembly cell with walking workers and decouplers (1993) Journal of Manufacturing Systems, 12 (2), pp. 170-180;Ko, E., Quick response adoption process in the Korean apparel industry (2001) Journal of The Textile Institute Part 1: Fibre Science and Textile Technology, 92 (2), pp. 56-62;Abend, J., Modular manufacturing: The line between success and failure (1999) Bobbin, 40 (5), pp. 48-52;Bischak, D., Performance of a manufacturing module with moving workers (1996) IIE Transactions (Institute of Industrial Engineers), 28 (9), pp. 723-733;Bartholdi, J., Eisenstein, D., A production line that balances itself (1996) Operations Research, 44 (1), pp. 21-34;Buzacott, J., Modelling teams and workgroups in manufacturing (2004) Annals of Operations Research, 126 (1-4), pp. 215-230;Dyner, I., Peña, G., Arango, S., (2008) Modelamiento para La Simulacion De Sistemas Socio-Economicos Y Naturales, , niversidad Nacional de Colombia, Medellín;Hillier, F., Lieberman, G., (2010) Introducción A La Investigación De Operaciones, , cGraw-Hill, México D.F;Zhu, X., Wilhelm, W., Scheduling and lot sizing with sequence-dependent setup: A literature review (2006) IIE Transactions (Institute of Industrial Engineers), 38 (11), pp. 987-1007;Allahverdi, A., Ng, C., Cheng, T., Kovalyov, M., A survey of scheduling problems with setup times or costs (2008) European Journal of Operational Research, 187 (3), pp. 985-1032;Allahverdi, A., Ng, C., Cheng, T., Kovalyov, M., A survey of scheduling problems with setup times or costs (2008) European Journal of Operational Research, 187 (3), pp. 985-1032;Selección de proveedores en la minería de oro con lógica difusa (2016) Revista Venezolana De Gerencia, 21 (75), pp. 530-548;Wang, J., Schroer, B., Ziemke, M., Understanding modular manufacturing in the apparel industry using simulation (1991) Winter Simulation Conference Proceedings, , hoenix, AZ, USA;Oliver, B., Kincade, D., Albrecht, D., Comparison of apparel production systems: A simulation (1994) Clothing & Textiles Research Journal, 12 (4), pp. 45-50;Kalao?lu, F., Saricam, C., Analysis of modular manufacturing system in clothing industry by using simulation (2007) Fibres & Textiles in Eastern Europe, 15 (3), pp. 93-96;Kursun, S., Kalaoglu, F., Line balancing by simulation in a sewing line (2010) Tekstil Ve Konfeksiyon, 20 (3), pp. 257-261;McNally, P., Heavey, C., Developing simulation as a desktop resource (2004) International Journal of Computer Integrated Manufacturing, 17 (5), pp. 435-450;Hollocks, B., Discrete-event simulation: An inquiry into user practice (2001) Simulation Practice and Theory, 8 (6-7), pp. 451-471;Cano, J., Campo, E., Baena, J., Application of DEA in international market selection for the export of goods (2017) DYNA (Colombia), 84 (200), pp. 376-382;Seddik, Y., Hanzalek, Z., Match-up scheduling of mixed-criticality jobs: Maximizing the probability of jobs execution (2017) European Journal of Operational Research, 262 (1), pp. 46-59 |
dc.rights.coar.fl_str_mv |
http://purl.org/coar/access_right/c_16ec |
rights_invalid_str_mv |
http://purl.org/coar/access_right/c_16ec |
dc.publisher.spa.fl_str_mv |
Revista Tecnica de la Facultad de Ingeniera |
dc.publisher.program.spa.fl_str_mv |
Administración de Empresas |
dc.publisher.faculty.spa.fl_str_mv |
Facultad de Ciencias Económicas y Administrativas |
dc.source.spa.fl_str_mv |
Scopus |
institution |
Universidad de Medellín |
repository.name.fl_str_mv |
Repositorio Institucional Universidad de Medellin |
repository.mail.fl_str_mv |
repositorio@udem.edu.co |
_version_ |
1814159215581724672 |
spelling |
2018-10-31T13:44:16Z2018-10-31T13:44:16Z20182540770http://hdl.handle.net/11407/4848This article aims to solve a NP-Hard production planning problem with stochastic variables in a modular manufacturing plant of a large company.In order to minimize costs per batch amixed programming model is proposed, which is based on results of a discrete simulation model executed in MSExcel and VBApplications. The simulation model presents variables such as manufacturing modules, setup staff, space and machinery resources, among others.After find the optimal solution of the production problem, it is concluded that the discrete simulation for modular manufacturing systems is adaptable to basic software, allows to propose new scenarios, articulate complex information, customize models and facilitates parameterize alarge number of variables. © 2018 Revista Tecnica de la Facultad de Ingeniera. All rights reserved.spaRevista Tecnica de la Facultad de IngenieraAdministración de EmpresasFacultad de Ciencias Económicas y Administrativashttps://www.scopus.com/inward/record.uri?eid=2-s2.0-85048641600&partnerID=40&md5=dbff2a3e4d5926f87edc319f572608094115058Revista Tecnica de la Facultad de Ingenieria Universidad del ZuliaKincade, D., Kim, J., Kanakadurga, K., An empirical investigation of apparel production systems and product line groups through the use of collar designs (2013) Journal of Textile and Apparel, Technology and Management, 8 (1), pp. 1-15;Sarache, W., Cespón, R., Ibarra, S., Alonso, P., Modular manufacturing: An alternative to improve the competitiveness in the clothing industry (2004) International Journal of Clothing Science and Technology, 16 (3-4), pp. 301-309;Bonsignorio, F., Molfino, R., An object based virtual reality simulation tool for design validation of a new paradigmmanufacturing facility (2006) IFIP International Federation for Information Processing, 220 (1), pp. 301-308;Ramdass, K., Pretorius, L., Implementation of modular manufacturing in the clothing industry in Kwazulu-Natal: A case study (2011) South African Journal of Industrial Engineering, 22 (1), pp. 167-181;Babu, V.R., Garment production systems - An overview (2006) Textile Magazine, 47 (9), p. 22;Cooper, W., Textile and apparel supply chains for the 21stcentury (2010) JournalofTextileandApparel,Technology andManagement, 6 (4), pp. 1-10;Black, J., Schroer, B., Simulation of an apparel assembly cell with walking workers and decouplers (1993) Journal of Manufacturing Systems, 12 (2), pp. 170-180;Ko, E., Quick response adoption process in the Korean apparel industry (2001) Journal of The Textile Institute Part 1: Fibre Science and Textile Technology, 92 (2), pp. 56-62;Abend, J., Modular manufacturing: The line between success and failure (1999) Bobbin, 40 (5), pp. 48-52;Bischak, D., Performance of a manufacturing module with moving workers (1996) IIE Transactions (Institute of Industrial Engineers), 28 (9), pp. 723-733;Bartholdi, J., Eisenstein, D., A production line that balances itself (1996) Operations Research, 44 (1), pp. 21-34;Buzacott, J., Modelling teams and workgroups in manufacturing (2004) Annals of Operations Research, 126 (1-4), pp. 215-230;Dyner, I., Peña, G., Arango, S., (2008) Modelamiento para La Simulacion De Sistemas Socio-Economicos Y Naturales, , niversidad Nacional de Colombia, Medellín;Hillier, F., Lieberman, G., (2010) Introducción A La Investigación De Operaciones, , cGraw-Hill, México D.F;Zhu, X., Wilhelm, W., Scheduling and lot sizing with sequence-dependent setup: A literature review (2006) IIE Transactions (Institute of Industrial Engineers), 38 (11), pp. 987-1007;Allahverdi, A., Ng, C., Cheng, T., Kovalyov, M., A survey of scheduling problems with setup times or costs (2008) European Journal of Operational Research, 187 (3), pp. 985-1032;Allahverdi, A., Ng, C., Cheng, T., Kovalyov, M., A survey of scheduling problems with setup times or costs (2008) European Journal of Operational Research, 187 (3), pp. 985-1032;Selección de proveedores en la minería de oro con lógica difusa (2016) Revista Venezolana De Gerencia, 21 (75), pp. 530-548;Wang, J., Schroer, B., Ziemke, M., Understanding modular manufacturing in the apparel industry using simulation (1991) Winter Simulation Conference Proceedings, , hoenix, AZ, USA;Oliver, B., Kincade, D., Albrecht, D., Comparison of apparel production systems: A simulation (1994) Clothing & Textiles Research Journal, 12 (4), pp. 45-50;Kalao?lu, F., Saricam, C., Analysis of modular manufacturing system in clothing industry by using simulation (2007) Fibres & Textiles in Eastern Europe, 15 (3), pp. 93-96;Kursun, S., Kalaoglu, F., Line balancing by simulation in a sewing line (2010) Tekstil Ve Konfeksiyon, 20 (3), pp. 257-261;McNally, P., Heavey, C., Developing simulation as a desktop resource (2004) International Journal of Computer Integrated Manufacturing, 17 (5), pp. 435-450;Hollocks, B., Discrete-event simulation: An inquiry into user practice (2001) Simulation Practice and Theory, 8 (6-7), pp. 451-471;Cano, J., Campo, E., Baena, J., Application of DEA in international market selection for the export of goods (2017) DYNA (Colombia), 84 (200), pp. 376-382;Seddik, Y., Hanzalek, Z., Match-up scheduling of mixed-criticality jobs: Maximizing the probability of jobs execution (2017) European Journal of Operational Research, 262 (1), pp. 46-59ScopusFashionsetup timesModular manufacturingclothingSimulationdiscrete eventsDiscrete event simulation for production planning in modular garment manufacturing systems [Simulación de eventos discretos en la planificación de producción para sistemas de confección modular]Articleinfo:eu-repo/semantics/articlehttp://purl.org/coar/version/c_970fb48d4fbd8a85http://purl.org/coar/resource_type/c_6501http://purl.org/coar/resource_type/c_2df8fbb1Cano, J.A., Universidad de Medellín;Campo, E.A., ESACS, Escuela Superior en Administración de Cadena de Suministro;India; Gómez, R.A., Universidad Nacional de ColombiaCano J.A.Campo E.A.Gómez R.A.http://purl.org/coar/access_right/c_16ec11407/4848oai:repository.udem.edu.co:11407/48482020-05-27 18:27:58.839Repositorio Institucional Universidad de Medellinrepositorio@udem.edu.co |