Identifying Factors Causing Delays and Cost Overruns in Construction Projects in Colombia
Construction project delays and cost overruns represent a source of concern for project developers, potentially affecting project feasibility. Thus, it is important to determine the causes of these issues, especially in Colombia where such causes are not well understood. In this research, a literatu...
- Autores:
-
Lozano Serna, Sara
Patiño Galindo, Ivonne
Gómez-Cabrera, Adriana
Torres, Andrés
- Tipo de recurso:
- Fecha de publicación:
- 2018
- Institución:
- Universidad EAFIT
- Repositorio:
- Repositorio EAFIT
- Idioma:
- spa
- OAI Identifier:
- oai:repository.eafit.edu.co:10784/13194
- Acceso en línea:
- http://publicaciones.eafit.edu.co/index.php/ingciencia/article/view/3619
http://hdl.handle.net/10784/13194
- Palabra clave:
- Construction projects in Colombia
Construction delays
Construction cost overruns
Statistical analysis
Proyectos de construcción en Colombia
Retrasos en la construcción
Sobrecostos en la construcción
Análisis estadístico
- Rights
- License
- Copyright (c) 2018 Sara Lozano Serna, Ivonne Patiño Galindo, Adriana Gómez-Cabrera, Andrés Torres
id |
REPOEAFIT2_751ab4fb319e6fa00fbf877ee2ab6494 |
---|---|
oai_identifier_str |
oai:repository.eafit.edu.co:10784/13194 |
network_acronym_str |
REPOEAFIT2 |
network_name_str |
Repositorio EAFIT |
repository_id_str |
|
dc.title.eng.fl_str_mv |
Identifying Factors Causing Delays and Cost Overruns in Construction Projects in Colombia |
dc.title.spa.fl_str_mv |
Identificación de factores que generan diferencias de tiempo y costos en proyectos de construcción en Colombia |
title |
Identifying Factors Causing Delays and Cost Overruns in Construction Projects in Colombia |
spellingShingle |
Identifying Factors Causing Delays and Cost Overruns in Construction Projects in Colombia Construction projects in Colombia Construction delays Construction cost overruns Statistical analysis Proyectos de construcción en Colombia Retrasos en la construcción Sobrecostos en la construcción Análisis estadístico |
title_short |
Identifying Factors Causing Delays and Cost Overruns in Construction Projects in Colombia |
title_full |
Identifying Factors Causing Delays and Cost Overruns in Construction Projects in Colombia |
title_fullStr |
Identifying Factors Causing Delays and Cost Overruns in Construction Projects in Colombia |
title_full_unstemmed |
Identifying Factors Causing Delays and Cost Overruns in Construction Projects in Colombia |
title_sort |
Identifying Factors Causing Delays and Cost Overruns in Construction Projects in Colombia |
dc.creator.fl_str_mv |
Lozano Serna, Sara Patiño Galindo, Ivonne Gómez-Cabrera, Adriana Torres, Andrés |
dc.contributor.author.none.fl_str_mv |
Lozano Serna, Sara Patiño Galindo, Ivonne Gómez-Cabrera, Adriana Torres, Andrés |
dc.contributor.affiliation.spa.fl_str_mv |
Pontificia Universidad Javeriana |
dc.subject.keyword.eng.fl_str_mv |
Construction projects in Colombia Construction delays Construction cost overruns Statistical analysis |
topic |
Construction projects in Colombia Construction delays Construction cost overruns Statistical analysis Proyectos de construcción en Colombia Retrasos en la construcción Sobrecostos en la construcción Análisis estadístico |
dc.subject.keyword.spa.fl_str_mv |
Proyectos de construcción en Colombia Retrasos en la construcción Sobrecostos en la construcción Análisis estadístico |
description |
Construction project delays and cost overruns represent a source of concern for project developers, potentially affecting project feasibility. Thus, it is important to determine the causes of these issues, especially in Colombia where such causes are not well understood. In this research, a literature review was performed to identify causes of time delays and cost overruns around the globe. Subsequently, a survey of project-development professionals in Colombia was carried out in order to ascertain, in their opinion, the significant factors leading to time and cost deviations. Lastly, a statistical significance analysis was reported using the influential factors determined in the previous two steps, in order to establish correlations among these and other aspects, including scale and project type, business size, among others, implementing statistical and computational tools. This paper demonstrates that inadequate planning and lack of integration among professionals are the most significant factors contributing to construction delays and cost overruns in Colombia. |
publishDate |
2018 |
dc.date.available.none.fl_str_mv |
2018-11-16T16:28:59Z |
dc.date.issued.none.fl_str_mv |
2018-06-14 |
dc.date.accessioned.none.fl_str_mv |
2018-11-16T16:28:59Z |
dc.date.none.fl_str_mv |
2018-06-14 |
dc.type.eng.fl_str_mv |
info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion article publishedVersion |
dc.type.coarversion.fl_str_mv |
http://purl.org/coar/version/c_970fb48d4fbd8a85 |
dc.type.coar.fl_str_mv |
http://purl.org/coar/resource_type/c_6501 http://purl.org/coar/resource_type/c_2df8fbb1 |
dc.type.local.spa.fl_str_mv |
Artículo |
status_str |
publishedVersion |
dc.identifier.issn.none.fl_str_mv |
2256-4314 1794-9165 |
dc.identifier.uri.none.fl_str_mv |
http://publicaciones.eafit.edu.co/index.php/ingciencia/article/view/3619 http://hdl.handle.net/10784/13194 |
dc.identifier.doi.none.fl_str_mv |
10.17230/ingciencia.13.27.6 |
identifier_str_mv |
2256-4314 1794-9165 10.17230/ingciencia.13.27.6 |
url |
http://publicaciones.eafit.edu.co/index.php/ingciencia/article/view/3619 http://hdl.handle.net/10784/13194 |
dc.language.iso.none.fl_str_mv |
spa |
language |
spa |
dc.relation.isversionof.none.fl_str_mv |
http://publicaciones.eafit.edu.co/index.php/ingciencia/article/view/3619 |
dc.rights.eng.fl_str_mv |
Copyright (c) 2018 Sara Lozano Serna, Ivonne Patiño Galindo, Adriana Gómez-Cabrera, Andrés Torres Attribution 4.0 International (CC BY 4.0) |
dc.rights.coar.fl_str_mv |
http://purl.org/coar/access_right/c_abf2 |
dc.rights.uri.none.fl_str_mv |
http://creativecommons.org/licenses/by/4.0 |
dc.rights.local.spa.fl_str_mv |
Acceso abierto |
rights_invalid_str_mv |
Copyright (c) 2018 Sara Lozano Serna, Ivonne Patiño Galindo, Adriana Gómez-Cabrera, Andrés Torres Attribution 4.0 International (CC BY 4.0) http://creativecommons.org/licenses/by/4.0 Acceso abierto http://purl.org/coar/access_right/c_abf2 |
dc.format.none.fl_str_mv |
application/pdf |
dc.publisher.spa.fl_str_mv |
Universidad EAFIT |
dc.source.none.fl_str_mv |
instname:Universidad EAFIT reponame:Repositorio Institucional Universidad EAFIT |
dc.source.eng.fl_str_mv |
Ingeniería y Ciencia; Vol 14 No 27 (2018); 117-151 |
dc.source.spa.fl_str_mv |
Ingeniería y Ciencia; Vol 14 No 27 (2018); 117-151 |
instname_str |
Universidad EAFIT |
institution |
Universidad EAFIT |
reponame_str |
Repositorio Institucional Universidad EAFIT |
collection |
Repositorio Institucional Universidad EAFIT |
bitstream.url.fl_str_mv |
https://repository.eafit.edu.co/bitstreams/6ae5327c-bbf0-4f04-9fec-176777b564ab/download https://repository.eafit.edu.co/bitstreams/5354f90e-792f-4a98-b320-624ccd11e423/download https://repository.eafit.edu.co/bitstreams/9796d7ea-9f40-4e81-ab9f-bda986a4b20b/download |
bitstream.checksum.fl_str_mv |
da9b21a5c7e00c7f1127cef8e97035e0 29e196cc3a2bcf46584750a188efe8fd 2cc551447cff0f4b0588ac506264cbe7 |
bitstream.checksumAlgorithm.fl_str_mv |
MD5 MD5 MD5 |
repository.name.fl_str_mv |
Repositorio Institucional Universidad EAFIT |
repository.mail.fl_str_mv |
repositorio@eafit.edu.co |
_version_ |
1818102426710835200 |
spelling |
2018-06-142018-11-16T16:28:59Z2018-06-142018-11-16T16:28:59Z2256-43141794-9165http://publicaciones.eafit.edu.co/index.php/ingciencia/article/view/3619http://hdl.handle.net/10784/1319410.17230/ingciencia.13.27.6Construction project delays and cost overruns represent a source of concern for project developers, potentially affecting project feasibility. Thus, it is important to determine the causes of these issues, especially in Colombia where such causes are not well understood. In this research, a literature review was performed to identify causes of time delays and cost overruns around the globe. Subsequently, a survey of project-development professionals in Colombia was carried out in order to ascertain, in their opinion, the significant factors leading to time and cost deviations. Lastly, a statistical significance analysis was reported using the influential factors determined in the previous two steps, in order to establish correlations among these and other aspects, including scale and project type, business size, among others, implementing statistical and computational tools. This paper demonstrates that inadequate planning and lack of integration among professionals are the most significant factors contributing to construction delays and cost overruns in Colombia.Los retrasos y sobrecostos en proyectos de construcción son objeto de constante preocupación por parte de los desarrolladores de proyectos, ya que incluso pueden afectar la viabilidad de estos. Por esto, es necesario estudiar las causas, especialmente en Colombia donde las causas generadoras de este tipo de desviaciones no han sido analizadas a profundidad. Esta investigación, realizó inicialmente una revisión de la literatura para identificar causas generadoras de desviaciones en tiempos y costos a nivel mundial. Posteriormente, se realizó una encuesta dirigida a profesionales dedicados al desarrollo de proyectos de construcción en Colombia, para poder conocer en su concepto los factores significativos en la generación de desviaciones en tiempos y costos. Finalmente, se ejecutó un análisis de significancia basado en los factores influyentes, estableciendo las correlaciones entre estos y aspectos como magnitud, tipo de proyecto, tamaño de las empresas, entre otros, implementando herramientas estadísticas y computacionales. El estudio arrojó la inadecuada planeación y falta de integración entre profesionales como uno de los factores más influyentes en la fluctuación de costos y tiempos en el país.application/pdfspaUniversidad EAFIThttp://publicaciones.eafit.edu.co/index.php/ingciencia/article/view/3619Copyright (c) 2018 Sara Lozano Serna, Ivonne Patiño Galindo, Adriana Gómez-Cabrera, Andrés TorresAttribution 4.0 International (CC BY 4.0)http://creativecommons.org/licenses/by/4.0Acceso abiertohttp://purl.org/coar/access_right/c_abf2instname:Universidad EAFITreponame:Repositorio Institucional Universidad EAFITIngeniería y Ciencia; Vol 14 No 27 (2018); 117-151Ingeniería y Ciencia; Vol 14 No 27 (2018); 117-151Identifying Factors Causing Delays and Cost Overruns in Construction Projects in ColombiaIdentificación de factores que generan diferencias de tiempo y costos en proyectos de construcción en Colombiainfo:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionarticlepublishedVersionArtículohttp://purl.org/coar/version/c_970fb48d4fbd8a85http://purl.org/coar/resource_type/c_6501http://purl.org/coar/resource_type/c_2df8fbb1Construction projects in ColombiaConstruction delaysConstruction cost overrunsStatistical analysisProyectos de construcción en ColombiaRetrasos en la construcciónSobrecostos en la construcciónAnálisis estadísticoLozano Serna, Sarad3cba867-c687-4361-957a-81d49c5eba64-1Patiño Galindo, Ivonned5bb2115-9929-4999-97d8-cffa3b631349-1Gómez-Cabrera, Adrianae14a09e7-17d0-4156-b96c-31427ad36173-1Torres, Andrés02a46e84-5c50-4fe7-b3c1-fd087df750d7-1Pontificia Universidad JaverianaIngeniería y Ciencia1427117151ing.ciencTHUMBNAILminaitura-ig_Mesa de trabajo 1.jpgminaitura-ig_Mesa de trabajo 1.jpgimage/jpeg265796https://repository.eafit.edu.co/bitstreams/6ae5327c-bbf0-4f04-9fec-176777b564ab/downloadda9b21a5c7e00c7f1127cef8e97035e0MD51ORIGINALdocument (4).pdfdocument (4).pdfTexto completo PDFapplication/pdf2689901https://repository.eafit.edu.co/bitstreams/5354f90e-792f-4a98-b320-624ccd11e423/download29e196cc3a2bcf46584750a188efe8fdMD52articulo.htmlarticulo.htmlTexto completo HTMLtext/html374https://repository.eafit.edu.co/bitstreams/9796d7ea-9f40-4e81-ab9f-bda986a4b20b/download2cc551447cff0f4b0588ac506264cbe7MD5310784/13194oai:repository.eafit.edu.co:10784/131942024-12-04 11:49:43.459http://creativecommons.org/licenses/by/4.0Copyright (c) 2018 Sara Lozano Serna, Ivonne Patiño Galindo, Adriana Gómez-Cabrera, Andrés Torresopen.accesshttps://repository.eafit.edu.coRepositorio Institucional Universidad EAFITrepositorio@eafit.edu.co |