Identifying Factors Causing Delays and Cost Overruns in Construction Projects in Colombia

Construction project delays and cost overruns represent a source of concern for project developers, potentially affecting project feasibility. Thus, it is important to determine the causes of these issues, especially in Colombia where such causes are not well understood. In this research, a literatu...

Full description

Autores:
Lozano Serna, Sara
Patiño Galindo, Ivonne
Gómez-Cabrera, Adriana
Torres, Andrés
Tipo de recurso:
Fecha de publicación:
2018
Institución:
Universidad EAFIT
Repositorio:
Repositorio EAFIT
Idioma:
spa
OAI Identifier:
oai:repository.eafit.edu.co:10784/13194
Acceso en línea:
http://publicaciones.eafit.edu.co/index.php/ingciencia/article/view/3619
http://hdl.handle.net/10784/13194
Palabra clave:
Construction projects in Colombia
Construction delays
Construction cost overruns
Statistical analysis
Proyectos de construcción en Colombia
Retrasos en la construcción
Sobrecostos en la construcción
Análisis estadístico
Rights
License
Copyright (c) 2018 Sara Lozano Serna, Ivonne Patiño Galindo, Adriana Gómez-Cabrera, Andrés Torres
Description
Summary:Construction project delays and cost overruns represent a source of concern for project developers, potentially affecting project feasibility. Thus, it is important to determine the causes of these issues, especially in Colombia where such causes are not well understood. In this research, a literature review was performed to identify causes of time delays and cost overruns around the globe. Subsequently, a survey of project-development professionals in Colombia was carried out in order to ascertain, in their opinion, the significant factors leading to time and cost deviations. Lastly, a statistical significance analysis was reported using the influential factors determined in the previous two steps, in order to establish correlations among these and other aspects, including scale and project type, business size, among others, implementing statistical and computational tools. This paper demonstrates that inadequate planning and lack of integration among professionals are the most significant factors contributing to construction delays and cost overruns in Colombia.