Simulation operations and line of balance: integrated tools for decision making

This article presents the joint implementation of operations simulation and balance lines as tools that contribute to improving the efficiency of construction project planning, where its integration has been scarce at national and international level. The article exposes the results of the simulatio...

Full description

Autores:
Botero Botero, Luis Fernando
Acevedo, Harlem
Tipo de recurso:
Fecha de publicación:
2011
Institución:
Universidad EAFIT
Repositorio:
Repositorio EAFIT
Idioma:
spa
OAI Identifier:
oai:repository.eafit.edu.co:10784/14469
Acceso en línea:
http://hdl.handle.net/10784/14469
Palabra clave:
Simulation
Balance Line
Construction
Lean Construction
Simulación
Línea De Balance
Construcción
Lean Construction
Rights
License
Copyright (c) 2011 Luis Fernando Botero Botero, Harlem Acevedo
id REPOEAFIT2_2232de34f2c7a3bc967120aa93f21d74
oai_identifier_str oai:repository.eafit.edu.co:10784/14469
network_acronym_str REPOEAFIT2
network_name_str Repositorio EAFIT
repository_id_str
dc.title.eng.fl_str_mv Simulation operations and line of balance: integrated tools for decision making
dc.title.spa.fl_str_mv Simulación de operaciones y línea de balance: herramientas integradas para la toma de decisiones
title Simulation operations and line of balance: integrated tools for decision making
spellingShingle Simulation operations and line of balance: integrated tools for decision making
Simulation
Balance Line
Construction
Lean Construction
Simulación
Línea De Balance
Construcción
Lean Construction
title_short Simulation operations and line of balance: integrated tools for decision making
title_full Simulation operations and line of balance: integrated tools for decision making
title_fullStr Simulation operations and line of balance: integrated tools for decision making
title_full_unstemmed Simulation operations and line of balance: integrated tools for decision making
title_sort Simulation operations and line of balance: integrated tools for decision making
dc.creator.fl_str_mv Botero Botero, Luis Fernando
Acevedo, Harlem
dc.contributor.author.spa.fl_str_mv Botero Botero, Luis Fernando
Acevedo, Harlem
dc.contributor.affiliation.spa.fl_str_mv Universidad EAFIT
dc.subject.keyword.eng.fl_str_mv Simulation
Balance Line
Construction
Lean Construction
topic Simulation
Balance Line
Construction
Lean Construction
Simulación
Línea De Balance
Construcción
Lean Construction
dc.subject.keyword.spa.fl_str_mv Simulación
Línea De Balance
Construcción
Lean Construction
description This article presents the joint implementation of operations simulation and balance lines as tools that contribute to improving the efficiency of construction project planning, where its integration has been scarce at national and international level. The article exposes the results of the simulation of the activities associated with the stage of structure, assembly and casting of walls and slab, in a building in height. The system is modeled according to the way in which the project is executed by the builders and with the help of the balance lines, alternative scenarios are generated in order to compare the times and the average costs of completion of the project. In the first scenario, slack found in the current system is used in relation to the times of initiation of activities, without changing the amount of human resources and equipment. Secondly, the amount of human resources is slightly increased and the amount of formaletería equipment for walls and slab is increased by 25%. Based on the results, companies have a methodology for planning and selecting the appropriate scenario, according to their convenience.
publishDate 2011
dc.date.issued.none.fl_str_mv 2011-06-01
dc.date.available.none.fl_str_mv 2019-11-22T18:55:37Z
dc.date.accessioned.none.fl_str_mv 2019-11-22T18:55:37Z
dc.date.none.fl_str_mv 2011-06-01
dc.type.eng.fl_str_mv article
info:eu-repo/semantics/article
publishedVersion
info:eu-repo/semantics/publishedVersion
dc.type.coarversion.fl_str_mv http://purl.org/coar/version/c_970fb48d4fbd8a85
dc.type.coar.fl_str_mv http://purl.org/coar/resource_type/c_6501
http://purl.org/coar/resource_type/c_2df8fbb1
dc.type.local.spa.fl_str_mv Artículo
status_str publishedVersion
dc.identifier.issn.none.fl_str_mv 2256-4314
1794-9165
dc.identifier.uri.none.fl_str_mv http://hdl.handle.net/10784/14469
identifier_str_mv 2256-4314
1794-9165
url http://hdl.handle.net/10784/14469
dc.language.iso.spa.fl_str_mv spa
language spa
dc.relation.isversionof.none.fl_str_mv http://publicaciones.eafit.edu.co/index.php/ingciencia/article/view/399
dc.relation.uri.none.fl_str_mv http://publicaciones.eafit.edu.co/index.php/ingciencia/article/view/399
dc.rights.eng.fl_str_mv Copyright (c) 2011 Luis Fernando Botero Botero, Harlem Acevedo
dc.rights.coar.fl_str_mv http://purl.org/coar/access_right/c_abf2
dc.rights.local.spa.fl_str_mv Acceso abierto
rights_invalid_str_mv Copyright (c) 2011 Luis Fernando Botero Botero, Harlem Acevedo
Acceso abierto
http://purl.org/coar/access_right/c_abf2
dc.format.none.fl_str_mv application/pdf
dc.coverage.spatial.eng.fl_str_mv Medellín de: Lat: 06 15 00 N degrees minutes Lat: 6.2500 decimal degrees Long: 075 36 00 W degrees minutes Long: -75.6000 decimal degrees
dc.publisher.spa.fl_str_mv Universidad EAFIT
dc.source.none.fl_str_mv instname:Universidad EAFIT
reponame:Repositorio Institucional Universidad EAFIT
dc.source.spa.fl_str_mv Ingeniería y Ciencia; Vol 7, No 13 (2011)
instname_str Universidad EAFIT
institution Universidad EAFIT
reponame_str Repositorio Institucional Universidad EAFIT
collection Repositorio Institucional Universidad EAFIT
bitstream.url.fl_str_mv https://repository.eafit.edu.co/bitstreams/d6b70cb9-6d24-40a6-b736-24726fc1566d/download
https://repository.eafit.edu.co/bitstreams/f365ff38-35d3-406d-9ef7-87610079b039/download
https://repository.eafit.edu.co/bitstreams/6643f2fe-24da-4100-b738-ec9b2ec08575/download
bitstream.checksum.fl_str_mv da9b21a5c7e00c7f1127cef8e97035e0
29f79d366a13000e0bb996fb5580db4c
38f5108a94d2e98c85ba7282953a3508
bitstream.checksumAlgorithm.fl_str_mv MD5
MD5
MD5
repository.name.fl_str_mv Repositorio Institucional Universidad EAFIT
repository.mail.fl_str_mv repositorio@eafit.edu.co
_version_ 1814110304408174592
spelling Medellín de: Lat: 06 15 00 N degrees minutes Lat: 6.2500 decimal degrees Long: 075 36 00 W degrees minutes Long: -75.6000 decimal degrees2011-06-012019-11-22T18:55:37Z2011-06-012019-11-22T18:55:37Z2256-43141794-9165http://hdl.handle.net/10784/14469This article presents the joint implementation of operations simulation and balance lines as tools that contribute to improving the efficiency of construction project planning, where its integration has been scarce at national and international level. The article exposes the results of the simulation of the activities associated with the stage of structure, assembly and casting of walls and slab, in a building in height. The system is modeled according to the way in which the project is executed by the builders and with the help of the balance lines, alternative scenarios are generated in order to compare the times and the average costs of completion of the project. In the first scenario, slack found in the current system is used in relation to the times of initiation of activities, without changing the amount of human resources and equipment. Secondly, the amount of human resources is slightly increased and the amount of formaletería equipment for walls and slab is increased by 25%. Based on the results, companies have a methodology for planning and selecting the appropriate scenario, according to their convenience.Este artículo presenta la implementación conjunta de la simulación de operaciones y de las líneas de balance como herramientas que contribuyen a mejorarla eficiencia de la planeación de proyectos de la construcción, donde su integración ha sido escasa en el ámbito nacional e internacional. El artículo exponelos resultados de la simulación de las actividades asociadas a la etapa de estructura, armado y fundida de muros y losa, en una edificación en altura. Se modela el sistema de acuerdo con la forma como se ejecuta el proyecto por parte de los constructores y con la ayuda de las líneas de balance se generandos escenarios alternativos con el fin de comparar los tiempos y los costos promedios de terminación del proyecto. En el primer escenario se aprovechala holgura hallada en el sistema actual con relación a los tiempos de iniciación de actividades, sin cambiar la cantidad de recursos humanos y de equipo. Ensegundo escenario, se aumenta levemente la cantidad de recursos humanos y se incrementa en un 25% la cantidad de equipo de formaletería para muros y losa. A partir de los resultados, las empresas disponen de una metodología para la planeación y la selección del escenario adecuado, de acuerdo con suconveniencia.application/pdfspaUniversidad EAFIThttp://publicaciones.eafit.edu.co/index.php/ingciencia/article/view/399http://publicaciones.eafit.edu.co/index.php/ingciencia/article/view/399Copyright (c) 2011 Luis Fernando Botero Botero, Harlem AcevedoAcceso abiertohttp://purl.org/coar/access_right/c_abf2instname:Universidad EAFITreponame:Repositorio Institucional Universidad EAFITIngeniería y Ciencia; Vol 7, No 13 (2011)Simulation operations and line of balance: integrated tools for decision makingSimulación de operaciones y línea de balance: herramientas integradas para la toma de decisionesarticleinfo:eu-repo/semantics/articlepublishedVersioninfo:eu-repo/semantics/publishedVersionArtículohttp://purl.org/coar/version/c_970fb48d4fbd8a85http://purl.org/coar/resource_type/c_6501http://purl.org/coar/resource_type/c_2df8fbb1SimulationBalance LineConstructionLean ConstructionSimulaciónLínea De BalanceConstrucciónLean ConstructionBotero Botero, Luis FernandoAcevedo, HarlemUniversidad EAFITIngeniería y Ciencia7132945ing.cienc.THUMBNAILminaitura-ig_Mesa de trabajo 1.jpgminaitura-ig_Mesa de trabajo 1.jpgimage/jpeg265796https://repository.eafit.edu.co/bitstreams/d6b70cb9-6d24-40a6-b736-24726fc1566d/downloadda9b21a5c7e00c7f1127cef8e97035e0MD51ORIGINAL2.pdf2.pdfTexto completo PDFapplication/pdf369734https://repository.eafit.edu.co/bitstreams/f365ff38-35d3-406d-9ef7-87610079b039/download29f79d366a13000e0bb996fb5580db4cMD52articulo.htmlarticulo.htmlTexto completo HTMLtext/html373https://repository.eafit.edu.co/bitstreams/6643f2fe-24da-4100-b738-ec9b2ec08575/download38f5108a94d2e98c85ba7282953a3508MD5310784/14469oai:repository.eafit.edu.co:10784/144692020-03-02 22:13:48.248open.accesshttps://repository.eafit.edu.coRepositorio Institucional Universidad EAFITrepositorio@eafit.edu.co