Guía metodológica para realizar interventorías en Termoflores S.A. E.S.P. en las áreas de proyectos, obras civiles y mantenimiento de pintura en equipos de planta

Recently the organizations services loaners have turned out to be submitted to enormous pressure to be competitive and to offer an opportune quality products delivery. This new environment has forced the managers and engineers to optimize all the systems that intervene in the organization. The proje...

Full description

Autores:
Bocanegra Gómez, Erwin
Tipo de recurso:
Trabajo de grado de pregrado
Fecha de publicación:
2005
Institución:
Corporación Universidad de la Costa
Repositorio:
REDICUC - Repositorio CUC
Idioma:
spa
OAI Identifier:
oai:repositorio.cuc.edu.co:11323/4749
Acceso en línea:
https://hdl.handle.net/11323/4749
https://repositorio.cuc.edu.co/
Palabra clave:
Construcción
Construction
Inspección
Inspection
Contratos y especificaciones
Contracts and specifications
Rights
openAccess
License
Attribution-NonCommercial-ShareAlike 4.0 International
Description
Summary:Recently the organizations services loaners have turned out to be submitted to enormous pressure to be competitive and to offer an opportune quality products delivery. This new environment has forced the managers and engineers to optimize all the systems that intervene in the organization. The project development from its conception, development, putting in service and maintenance has a key function in the achievement of the goals and targets of the organization. They help to reduce the costs, minimize the time of execution of the projects, improve the quality, increase the productivity and be provided with elements of control that should be reliable and sure, to manage to satisfy the needs of the clients. Also, a Control system based on the Interventoría of projects and execution of works plays an important role in minimizing the future impacts in the infrastructure of the organization, to reach the yield valuation on the investment that has been fixed as a goal, maximizing the availability of the facilities and the efficacy of the teams