A dispatching-fuzzy ahp-topsis model for scheduling flexible job-shop systems in industry 4.0 context
Scheduling flexible job-shop systems (FJSS) has become a major challenge for different smart factories due to the high complexity involved in NP-hard problems and the constant need to satisfy customers in real time. A key aspect to be addressed in this particular aim is the adoption of a multi-crite...
- Autores:
-
Ortíz-Barrios, Miguel
Petrillo, Antonella
De Felice, Fabio
Jaramillo-Rueda, Natalia
Jiménez-Delgado, Genett
Borrero-López, Luz
- Tipo de recurso:
- Article of journal
- Fecha de publicación:
- 2021
- Institución:
- Corporación Universidad de la Costa
- Repositorio:
- REDICUC - Repositorio CUC
- Idioma:
- eng
- OAI Identifier:
- oai:repositorio.cuc.edu.co:11323/8466
- Acceso en línea:
- https://hdl.handle.net/11323/8466
https://doi.org/10.3390/app11115107
https://repositorio.cuc.edu.co/
- Palabra clave:
- FJSP
MCDM
Fuzzy
AHP
TOPSIS
Smart manufacturing
Apparel industry
Optimization
Innovation
Decision analysis
- Rights
- openAccess
- License
- CC0 1.0 Universal
Summary: | Scheduling flexible job-shop systems (FJSS) has become a major challenge for different smart factories due to the high complexity involved in NP-hard problems and the constant need to satisfy customers in real time. A key aspect to be addressed in this particular aim is the adoption of a multi-criteria approach incorporating the current dynamics of smart FJSS. Thus, this paper proposes an integrated and enhanced method of a dispatching algorithm based on fuzzy AHP (FAHP) and TOPSIS. Initially, the two first steps of the dispatching algorithm (identification of eligible operations and machine selection) were implemented. The FAHP and TOPSIS methods were then integrated to underpin the multi-criteria operation selection process. In particular, FAHP was used to calculate the criteria weights under uncertainty, and TOPSIS was later applied to rank the eligible operations. As the fourth step of dispatching the algorithm, the operation with the highest priority was scheduled together with its initial and final time. A case study from the smart apparel industry was employed to validate the effectiveness of the proposed approach. The results evidenced that our approach outperformed the current company’s scheduling method by a median lateness of 3.86 days while prioritizing high-throughput products for earlier delivery. View Full-Text |
---|