Análisis de los efectos del costo y beneficio en la canalización del arroyo de la calle 84 en la ciudad de Barranquilla
To date the problem of streams is a reality that all Barranquilleros face in Winter time, where the sectors of economy and industry in the city are affected, causing economic, material and in some cases human losses. One of the solutions by the District of Barranquilla has been the implementation of...
- Autores:
-
Ayala Rueda, Claudia Ines
Murillo Acosta, Michel Johana
Lozada Ayala, Brayan
Pombo Sierra, Andrea Patricia
- Tipo de recurso:
- Article of journal
- Fecha de publicación:
- 2017
- Institución:
- Corporación Universidad de la Costa
- Repositorio:
- REDICUC - Repositorio CUC
- Idioma:
- spa
- OAI Identifier:
- oai:repositorio.cuc.edu.co:11323/1925
- Acceso en línea:
- https://hdl.handle.net/11323/1925
https://repositorio.cuc.edu.co/
- Palabra clave:
- Channeling
Cost-benefit ratioProject
Project
Stream
Arroyo
Canalización
Proyecto
Relación costo-beneficio
- Rights
- openAccess
- License
- Atribución – No comercial – Compartir igual
Summary: | To date the problem of streams is a reality that all Barranquilleros face in Winter time, where the sectors of economy and industry in the city are affected, causing economic, material and in some cases human losses. One of the solutions by the District of Barranquilla has been the implementation of conducting rainwater through box-culverts and underground pipes, as it is for the case of the stream of the 84 street (Siape). The main objective of this research is to analyze the most relevant effects from the social, economic and environmental point of view during all stages of this construction project. In the first phase of the research, different techniques were used to search and collect information, which allowed finding the most important effects in the social, economic and environmental aspects that this project generated. The tools used for this were official technical documents of the designs, tenders, environmental management plans and statistical techniques such as surveys and interviews, which served to expand knowledge of the area of influence. The results show that the negative effects occur during the construction phase; however there are more positive effects that result in the implementation of the project, being in this case a significant valorization of the area and increase in the quality of life of the inhabitants, the most relevant effects of this construction project. |
---|