Diseño de estrategias para la planeación, ejecución y el control interno de obras civiles en la empresa Aguas Regional de Macondo S.A. E.S.P.

Construction was long regarded as a craft, where the builder was the designer, who chose the types of materials, which received the work and deciding how it would build. But with the growth of the construction and the creation of new materials and equipment, these functions have been divided among a...

Full description

Autores:
Del Toro Llanos, Adalberto Jesús
Tipo de recurso:
Trabajo de grado de pregrado
Fecha de publicación:
2012
Institución:
Corporación Universidad de la Costa
Repositorio:
REDICUC - Repositorio CUC
Idioma:
spa
OAI Identifier:
oai:repositorio.cuc.edu.co:11323/1311
Acceso en línea:
https://hdl.handle.net/11323/1311
https://repositorio.cuc.edu.co/
Palabra clave:
Materiales de construcción
Construction materials
Obras civiles
Civil works
Construcción
Building
Rights
openAccess
License
Atribución – No comercial – Compartir igual
id RCUC2_4157817e234b56cc09ae9b3736f19855
oai_identifier_str oai:repositorio.cuc.edu.co:11323/1311
network_acronym_str RCUC2
network_name_str REDICUC - Repositorio CUC
repository_id_str
dc.title.eng.fl_str_mv Diseño de estrategias para la planeación, ejecución y el control interno de obras civiles en la empresa Aguas Regional de Macondo S.A. E.S.P.
title Diseño de estrategias para la planeación, ejecución y el control interno de obras civiles en la empresa Aguas Regional de Macondo S.A. E.S.P.
spellingShingle Diseño de estrategias para la planeación, ejecución y el control interno de obras civiles en la empresa Aguas Regional de Macondo S.A. E.S.P.
Materiales de construcción
Construction materials
Obras civiles
Civil works
Construcción
Building
title_short Diseño de estrategias para la planeación, ejecución y el control interno de obras civiles en la empresa Aguas Regional de Macondo S.A. E.S.P.
title_full Diseño de estrategias para la planeación, ejecución y el control interno de obras civiles en la empresa Aguas Regional de Macondo S.A. E.S.P.
title_fullStr Diseño de estrategias para la planeación, ejecución y el control interno de obras civiles en la empresa Aguas Regional de Macondo S.A. E.S.P.
title_full_unstemmed Diseño de estrategias para la planeación, ejecución y el control interno de obras civiles en la empresa Aguas Regional de Macondo S.A. E.S.P.
title_sort Diseño de estrategias para la planeación, ejecución y el control interno de obras civiles en la empresa Aguas Regional de Macondo S.A. E.S.P.
dc.creator.fl_str_mv Del Toro Llanos, Adalberto Jesús
dc.contributor.advisor.spa.fl_str_mv Buzón Ojeda, Buzón Ojeda
dc.contributor.author.spa.fl_str_mv Del Toro Llanos, Adalberto Jesús
dc.subject.eng.fl_str_mv Materiales de construcción
Construction materials
Obras civiles
Civil works
Construcción
Building
topic Materiales de construcción
Construction materials
Obras civiles
Civil works
Construcción
Building
description Construction was long regarded as a craft, where the builder was the designer, who chose the types of materials, which received the work and deciding how it would build. But with the growth of the construction and the creation of new materials and equipment, these functions have been divided among a larger number of people. Unlike other industries, if you require a clear direction of how to manufacture the products, civil construction has been an activity that made the products (Civil Works) without a clear definition of how to produce and consequence of this is that it has waste generated on site, rework costs, poor quality and poor productivity. The Regional Water Company Macondo S.A. E.S.P has not been immune to this situation currently is reflected in the development of the works executed under the contract and work to extend operation of water and sewage in several municipalities of the department of Magdalena. Due to the traditional way of designing a play in one stage of the process continues to the end of another and so on causing a sequencing of activities and a lack of integration and feedback of the process. This simple form of projection is due to the lack of communication and coordination of activities. These reasons Regional Water Company Macondo S.A. E.S.P support group called Soil Research and structures of the University of Costa, for the support in seeking a better integration between the different design stages - design and execution of works, the Regional Water Company Macondo S.A. E.S.P, in order to increase the productivity of the work and find the best construction sequences. This should be based on the translation of the technical specifications of the product and production sequences procedures, minimizing the improper or incomplete execution of those specifications. Production projects, whose main objective is to integrate the project and the work presents appropriate solutions to improve the implementation process of a specific building activity.
publishDate 2012
dc.date.issued.none.fl_str_mv 2012-07-18
dc.date.accessioned.none.fl_str_mv 2018-11-19T17:07:19Z
dc.date.available.none.fl_str_mv 2018-11-19T17:07:19Z
dc.type.spa.fl_str_mv Trabajo de grado - Pregrado
dc.type.coar.spa.fl_str_mv http://purl.org/coar/resource_type/c_7a1f
dc.type.content.spa.fl_str_mv Text
dc.type.driver.spa.fl_str_mv info:eu-repo/semantics/bachelorThesis
dc.type.redcol.spa.fl_str_mv http://purl.org/redcol/resource_type/TP
dc.type.version.spa.fl_str_mv info:eu-repo/semantics/acceptedVersion
format http://purl.org/coar/resource_type/c_7a1f
status_str acceptedVersion
dc.identifier.uri.spa.fl_str_mv https://hdl.handle.net/11323/1311
dc.identifier.instname.spa.fl_str_mv Corporación Universidad de la Costa
dc.identifier.reponame.spa.fl_str_mv REDICUC - Repositorio CUC
dc.identifier.repourl.spa.fl_str_mv https://repositorio.cuc.edu.co/
url https://hdl.handle.net/11323/1311
https://repositorio.cuc.edu.co/
identifier_str_mv Corporación Universidad de la Costa
REDICUC - Repositorio CUC
dc.language.iso.none.fl_str_mv spa
language spa
dc.rights.spa.fl_str_mv Atribución – No comercial – Compartir igual
dc.rights.accessrights.spa.fl_str_mv info:eu-repo/semantics/openAccess
dc.rights.coar.spa.fl_str_mv http://purl.org/coar/access_right/c_abf2
rights_invalid_str_mv Atribución – No comercial – Compartir igual
http://purl.org/coar/access_right/c_abf2
eu_rights_str_mv openAccess
dc.publisher.program.spa.fl_str_mv Ingeniería Civil
institution Corporación Universidad de la Costa
bitstream.url.fl_str_mv https://repositorio.cuc.edu.co/bitstreams/f0097a37-9a80-4dd7-a11f-07002729ed96/download
https://repositorio.cuc.edu.co/bitstreams/020dc648-7b96-49ba-b7b0-af2f335b3d09/download
https://repositorio.cuc.edu.co/bitstreams/33984fc0-4bf8-46f0-9afd-b736de553819/download
https://repositorio.cuc.edu.co/bitstreams/c758d793-097a-4803-8793-323d93bc56cb/download
bitstream.checksum.fl_str_mv ff3c53b92aa0c36cb284ed42b73c3c91
8a4605be74aa9ea9d79846c1fba20a33
c661ba1a72a354aafd9a756be5acd3b0
bc5f3e08a56de2b4b491265c8993442c
bitstream.checksumAlgorithm.fl_str_mv MD5
MD5
MD5
MD5
repository.name.fl_str_mv Repositorio de la Universidad de la Costa CUC
repository.mail.fl_str_mv repdigital@cuc.edu.co
_version_ 1811760745338109952
spelling Buzón Ojeda, Buzón OjedaDel Toro Llanos, Adalberto Jesús2018-11-19T17:07:19Z2018-11-19T17:07:19Z2012-07-18https://hdl.handle.net/11323/1311Corporación Universidad de la CostaREDICUC - Repositorio CUChttps://repositorio.cuc.edu.co/Construction was long regarded as a craft, where the builder was the designer, who chose the types of materials, which received the work and deciding how it would build. But with the growth of the construction and the creation of new materials and equipment, these functions have been divided among a larger number of people. Unlike other industries, if you require a clear direction of how to manufacture the products, civil construction has been an activity that made the products (Civil Works) without a clear definition of how to produce and consequence of this is that it has waste generated on site, rework costs, poor quality and poor productivity. The Regional Water Company Macondo S.A. E.S.P has not been immune to this situation currently is reflected in the development of the works executed under the contract and work to extend operation of water and sewage in several municipalities of the department of Magdalena. Due to the traditional way of designing a play in one stage of the process continues to the end of another and so on causing a sequencing of activities and a lack of integration and feedback of the process. This simple form of projection is due to the lack of communication and coordination of activities. These reasons Regional Water Company Macondo S.A. E.S.P support group called Soil Research and structures of the University of Costa, for the support in seeking a better integration between the different design stages - design and execution of works, the Regional Water Company Macondo S.A. E.S.P, in order to increase the productivity of the work and find the best construction sequences. This should be based on the translation of the technical specifications of the product and production sequences procedures, minimizing the improper or incomplete execution of those specifications. Production projects, whose main objective is to integrate the project and the work presents appropriate solutions to improve the implementation process of a specific building activity.La construcción fue considerada por mucho tiempo como una actividad artesanal, donde el constructor era el proyectista, el que escogía los tipos de materiales, el que los recibía en la obra y el que decidía como se iba a construir. Pero con el crecimiento de la construcción y con la creación de nuevos materiales y equipamientos, esas funciones se han ido dividiendo entre un número mayor de personas. A diferencia de otras industrias, que, si precisan de una dirección clara de cómo fabricar los productos, la construcción civil ha sido una actividad que fabrica su producto (Obras Civiles) sin una definición clara de cómo producirlo y consecuencia de esto, es que se ha generado desperdicios en obra, gastos en re-procesos, calidad deficiente y una pobre productividad. La empresa Aguas Regional De Macondo S.A E.S.P. no ha sido ajena a esta situación que actualmente se ve reflejada en el desarrollo de las obras que ejecuta bajo el contrato de operación y obras de ampliación de los acueductos y alcantarillados de varios municipios del departamento del Magdalena. Debido a la manera tradicional de proyectar una obra en que una etapa del proceso continúa al término de otra y así sucesivamente originando una secuenciación de actividades y una falta de integración y retroalimentación de dicho proceso. Esta mera forma de proyectar, se debe a la falta de comunicación y coordinación de las actividades. Estas razones la empresa Aguas Regional de Macondo S.A. E.S.P pidió apoyo al grupo de investigación de Suelos y estructuras, de la Universidad de la Costa, para que la apoyara en buscar una mejor integración entre las diferentes etapas concepción – proyecto y ejecución de obras, para la empresa Aguas Regional de Macondo S.A. E.S.P., con la finalidad de aumentar la productividad de las obras y hallar las mejores secuencias constructivas. Para ello se debe basar en la traducción de las especificaciones técnicas del producto en procedimientos y secuencias de producción, minimizando la ejecución inadecuada o incompleta de esas especificaciones. Los proyectos de producción, cuyo objetivo principal es el de integrar el proyecto y la obra, presenta soluciones adecuadas para mejorar los procesos de ejecución de una determinada actividad constructiva.Del Toro Llanos, Adalberto Jesús-fb977365-c114-422b-80e9-8a02b083d051-0spaAtribución – No comercial – Compartir igualinfo:eu-repo/semantics/openAccesshttp://purl.org/coar/access_right/c_abf2Materiales de construcciónConstruction materialsObras civilesCivil worksConstrucciónBuildingDiseño de estrategias para la planeación, ejecución y el control interno de obras civiles en la empresa Aguas Regional de Macondo S.A. E.S.P.Trabajo de grado - Pregradohttp://purl.org/coar/resource_type/c_7a1fTextinfo:eu-repo/semantics/bachelorThesishttp://purl.org/redcol/resource_type/TPinfo:eu-repo/semantics/acceptedVersionIngeniería CivilPublicationORIGINALDISEÑO DE ESTRATEGIAS PARA LA PLANEACION, EJECUCION Y CONTROL INTERNO DELAS OBRAS CIVILES EN LA EMPRESA AGUAS REGIONAL DE_1.pdfDISEÑO DE ESTRATEGIAS PARA LA PLANEACION, EJECUCION Y CONTROL INTERNO DELAS OBRAS CIVILES EN LA EMPRESA AGUAS REGIONAL DE_1.pdfapplication/pdf3046425https://repositorio.cuc.edu.co/bitstreams/f0097a37-9a80-4dd7-a11f-07002729ed96/downloadff3c53b92aa0c36cb284ed42b73c3c91MD51LICENSElicense.txtlicense.txttext/plain; charset=utf-81748https://repositorio.cuc.edu.co/bitstreams/020dc648-7b96-49ba-b7b0-af2f335b3d09/download8a4605be74aa9ea9d79846c1fba20a33MD52THUMBNAILDISEÑO DE ESTRATEGIAS PARA LA PLANEACION, EJECUCION Y CONTROL INTERNO DELAS OBRAS CIVILES EN LA EMPRESA AGUAS REGIONAL DE_1.pdf.jpgDISEÑO DE ESTRATEGIAS PARA LA PLANEACION, EJECUCION Y CONTROL INTERNO DELAS OBRAS CIVILES EN LA EMPRESA AGUAS REGIONAL DE_1.pdf.jpgimage/jpeg31268https://repositorio.cuc.edu.co/bitstreams/33984fc0-4bf8-46f0-9afd-b736de553819/downloadc661ba1a72a354aafd9a756be5acd3b0MD54TEXTDISEÑO DE ESTRATEGIAS PARA LA PLANEACION, EJECUCION Y CONTROL INTERNO DELAS OBRAS CIVILES EN LA EMPRESA AGUAS REGIONAL DE_1.pdf.txtDISEÑO DE ESTRATEGIAS PARA LA PLANEACION, EJECUCION Y CONTROL INTERNO DELAS OBRAS CIVILES EN LA EMPRESA AGUAS REGIONAL DE_1.pdf.txttext/plain166134https://repositorio.cuc.edu.co/bitstreams/c758d793-097a-4803-8793-323d93bc56cb/downloadbc5f3e08a56de2b4b491265c8993442cMD5511323/1311oai:repositorio.cuc.edu.co:11323/13112024-09-17 10:56:25.611open.accesshttps://repositorio.cuc.edu.coRepositorio de la Universidad de la Costa CUCrepdigital@cuc.edu.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