Diseño de estrategias para la planeación, ejecución y el control interno de obras civiles en la empresa Aguas Regional de Macondo S.A. E.S.P.
Construction was long regarded as a craft, where the builder was the designer, who chose the types of materials, which received the work and deciding how it would build. But with the growth of the construction and the creation of new materials and equipment, these functions have been divided among a...
- Autores:
-
Del Toro Llanos, Adalberto Jesús
- Tipo de recurso:
- Trabajo de grado de pregrado
- Fecha de publicación:
- 2012
- Institución:
- Corporación Universidad de la Costa
- Repositorio:
- REDICUC - Repositorio CUC
- Idioma:
- spa
- OAI Identifier:
- oai:repositorio.cuc.edu.co:11323/1311
- Acceso en línea:
- https://hdl.handle.net/11323/1311
https://repositorio.cuc.edu.co/
- Palabra clave:
- Materiales de construcción
Construction materials
Obras civiles
Civil works
Construcción
Building
- Rights
- openAccess
- License
- Atribución – No comercial – Compartir igual
Summary: | Construction was long regarded as a craft, where the builder was the designer, who chose the types of materials, which received the work and deciding how it would build. But with the growth of the construction and the creation of new materials and equipment, these functions have been divided among a larger number of people. Unlike other industries, if you require a clear direction of how to manufacture the products, civil construction has been an activity that made the products (Civil Works) without a clear definition of how to produce and consequence of this is that it has waste generated on site, rework costs, poor quality and poor productivity. The Regional Water Company Macondo S.A. E.S.P has not been immune to this situation currently is reflected in the development of the works executed under the contract and work to extend operation of water and sewage in several municipalities of the department of Magdalena. Due to the traditional way of designing a play in one stage of the process continues to the end of another and so on causing a sequencing of activities and a lack of integration and feedback of the process. This simple form of projection is due to the lack of communication and coordination of activities. These reasons Regional Water Company Macondo S.A. E.S.P support group called Soil Research and structures of the University of Costa, for the support in seeking a better integration between the different design stages - design and execution of works, the Regional Water Company Macondo S.A. E.S.P, in order to increase the productivity of the work and find the best construction sequences. This should be based on the translation of the technical specifications of the product and production sequences procedures, minimizing the improper or incomplete execution of those specifications. Production projects, whose main objective is to integrate the project and the work presents appropriate solutions to improve the implementation process of a specific building activity. |
---|