Activity scheduling for Cost-Time investment optimization in project management
The Cost-Time Profile is a tool that presents the combined impact of disbursements made during the execution of a project, and their timing. The Cost-Time Profile chart presents the accumulated cost at any given time, and the area under the curve is the Cost-Time Investment. This Cost-Time Investmen...
- Autores:
-
Rivera Cadavid, Leonardo
- Tipo de recurso:
- http://purl.org/coar/resource_type/c_c94f
- Fecha de publicación:
- 2008
- Institución:
- Universidad ICESI
- Repositorio:
- Repositorio ICESI
- Idioma:
- eng
- OAI Identifier:
- oai:repository.icesi.edu.co:10906/83338
- Acceso en línea:
- https://nebulosa.icesi.edu.co:2180/record/display.uri?eid=2-s2.0-63849296850&origin=resultslist&sort=plf-f&src=s&st1=%22Activity+Scheduling+For+Cost-Time+Investment+Optimization+In+Project+Management%22&st2=&sid=14e48da9ed2ba915dbc2c48381769db1&sot=b&sdt=
http://repository.icesi.edu.co/biblioteca_digital/handle/10906/83338
- Palabra clave:
- Ingeniería de producción
Costo-beneficio
Inversión
Modelos de inversión
Production engineering
- Rights
- openAccess
- License
- https://creativecommons.org/licenses/by-nc-nd/4.0/
id |
ICESI2_66ff044ad7817c83f7fcee78411c66f0 |
---|---|
oai_identifier_str |
oai:repository.icesi.edu.co:10906/83338 |
network_acronym_str |
ICESI2 |
network_name_str |
Repositorio ICESI |
repository_id_str |
|
spelling |
Rivera Cadavid, Leonardoleoindustrial@gmail.comVancouver de Lat: 49 13 00 N degrees minutes Lat: 49.2167 decimal degrees Long: 123 06 00 W degrees minutes Long: -123.1000 decimal degrees2018-04-12T21:00:46Z2018-04-12T21:00:46Z2008-05-17https://nebulosa.icesi.edu.co:2180/record/display.uri?eid=2-s2.0-63849296850&origin=resultslist&sort=plf-f&src=s&st1=%22Activity+Scheduling+For+Cost-Time+Investment+Optimization+In+Project+Management%22&st2=&sid=14e48da9ed2ba915dbc2c48381769db1&sot=b&sdt=http://repository.icesi.edu.co/biblioteca_digital/handle/10906/83338instname: Universidad Icesireponame: Biblioteca Digitalrepourl: https://repository.icesi.edu.co/The Cost-Time Profile is a tool that presents the combined impact of disbursements made during the execution of a project, and their timing. The Cost-Time Profile chart presents the accumulated cost at any given time, and the area under the curve is the Cost-Time Investment. This Cost-Time Investment has a quantifiable impact on the working capital the company uses, and it is also useful for the determination of the Direct Cost of a product. This paper aims to develop a model to create the schedule of activities that minimizes the Cost-Time Investment for a project.691-696 páginasDigitalapplication/pdfengIIE Annual Conference and Expo - 2008EL AUTOR, expresa que la obra objeto de la presente autorización es original y la elaboró sin quebrantar ni suplantar los derechos de autor de terceros, y de tal forma, la obra es de su exclusiva autoría y tiene la titularidad sobre éste. PARÁGRAFO: en caso de queja o acción por parte de un tercero referente a los derechos de autor sobre el artículo, folleto o libro en cuestión, EL AUTOR, asumirá la responsabilidad total, y saldrá en defensa de los derechos aquí autorizados; para todos los efectos, la Universidad Icesi actúa como un tercero de buena fe. Esta autorización, permite a la Universidad Icesi, de forma indefinida, para que en los términos establecidos en la Ley 23 de 1982, la Ley 44 de 1993, leyes y jurisprudencia vigente al respecto, haga publicación de este con fines educativos Todo persona que consulte ya sea la biblioteca o en medio electrónico podrá copiar apartes del texto citando siempre la fuentes, es decir el título del trabajo y el autor.https://creativecommons.org/licenses/by-nc-nd/4.0/info:eu-repo/semantics/openAccessAtribuci�n-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0)http://purl.org/coar/access_right/c_abf2Ingeniería de producciónCosto-beneficioInversiónModelos de inversiónProduction engineeringActivity scheduling for Cost-Time investment optimization in project managementinfo:eu-repo/semantics/conferenceObjecthttp://purl.org/coar/resource_type/c_c94fDocumento de conferenciainfo:eu-repo/semantics/publishedVersionhttp://purl.org/coar/version/c_970fb48d4fbd8a85Comunidad Universidad Icesi – InvestigadoresFacultad de IngenieríaIngeniería IndustrialDepartamento de Ingeniería IndustrialVancouverORIGINALdocumento.htmldocumento.htmltext/html719http://repository.icesi.edu.co/biblioteca_digital/bitstream/10906/83338/1/documento.html0af4e7993d121d210b2fd99031f3cc70MD5110906/83338oai:repository.icesi.edu.co:10906/833382018-11-16 10:06:42.766Biblioteca Digital - Universidad icesicdcriollo@icesi.edu.co |
dc.title.eng.fl_str_mv |
Activity scheduling for Cost-Time investment optimization in project management |
title |
Activity scheduling for Cost-Time investment optimization in project management |
spellingShingle |
Activity scheduling for Cost-Time investment optimization in project management Ingeniería de producción Costo-beneficio Inversión Modelos de inversión Production engineering |
title_short |
Activity scheduling for Cost-Time investment optimization in project management |
title_full |
Activity scheduling for Cost-Time investment optimization in project management |
title_fullStr |
Activity scheduling for Cost-Time investment optimization in project management |
title_full_unstemmed |
Activity scheduling for Cost-Time investment optimization in project management |
title_sort |
Activity scheduling for Cost-Time investment optimization in project management |
dc.creator.fl_str_mv |
Rivera Cadavid, Leonardo |
dc.contributor.author.spa.fl_str_mv |
Rivera Cadavid, Leonardo |
dc.subject.spa.fl_str_mv |
Ingeniería de producción Costo-beneficio Inversión Modelos de inversión |
topic |
Ingeniería de producción Costo-beneficio Inversión Modelos de inversión Production engineering |
dc.subject.eng.fl_str_mv |
Production engineering |
description |
The Cost-Time Profile is a tool that presents the combined impact of disbursements made during the execution of a project, and their timing. The Cost-Time Profile chart presents the accumulated cost at any given time, and the area under the curve is the Cost-Time Investment. This Cost-Time Investment has a quantifiable impact on the working capital the company uses, and it is also useful for the determination of the Direct Cost of a product. This paper aims to develop a model to create the schedule of activities that minimizes the Cost-Time Investment for a project. |
publishDate |
2008 |
dc.date.issued.none.fl_str_mv |
2008-05-17 |
dc.date.accessioned.none.fl_str_mv |
2018-04-12T21:00:46Z |
dc.date.available.none.fl_str_mv |
2018-04-12T21:00:46Z |
dc.type.eng.fl_str_mv |
info:eu-repo/semantics/conferenceObject |
dc.type.coar.none.fl_str_mv |
http://purl.org/coar/resource_type/c_c94f |
dc.type.local.spa.fl_str_mv |
Documento de conferencia |
dc.type.version.eng.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
dc.type.coarversion.none.fl_str_mv |
http://purl.org/coar/version/c_970fb48d4fbd8a85 |
format |
http://purl.org/coar/resource_type/c_c94f |
status_str |
publishedVersion |
dc.identifier.other.eng.fl_str_mv |
https://nebulosa.icesi.edu.co:2180/record/display.uri?eid=2-s2.0-63849296850&origin=resultslist&sort=plf-f&src=s&st1=%22Activity+Scheduling+For+Cost-Time+Investment+Optimization+In+Project+Management%22&st2=&sid=14e48da9ed2ba915dbc2c48381769db1&sot=b&sdt= |
dc.identifier.uri.none.fl_str_mv |
http://repository.icesi.edu.co/biblioteca_digital/handle/10906/83338 |
dc.identifier.instname.none.fl_str_mv |
instname: Universidad Icesi |
dc.identifier.reponame.none.fl_str_mv |
reponame: Biblioteca Digital |
dc.identifier.repourl.none.fl_str_mv |
repourl: https://repository.icesi.edu.co/ |
url |
https://nebulosa.icesi.edu.co:2180/record/display.uri?eid=2-s2.0-63849296850&origin=resultslist&sort=plf-f&src=s&st1=%22Activity+Scheduling+For+Cost-Time+Investment+Optimization+In+Project+Management%22&st2=&sid=14e48da9ed2ba915dbc2c48381769db1&sot=b&sdt= http://repository.icesi.edu.co/biblioteca_digital/handle/10906/83338 |
identifier_str_mv |
instname: Universidad Icesi reponame: Biblioteca Digital repourl: https://repository.icesi.edu.co/ |
dc.language.iso.eng.fl_str_mv |
eng |
language |
eng |
dc.relation.ispartof.eng.fl_str_mv |
IIE Annual Conference and Expo - 2008 |
dc.rights.uri.none.fl_str_mv |
https://creativecommons.org/licenses/by-nc-nd/4.0/ |
dc.rights.accessrights.spa.fl_str_mv |
info:eu-repo/semantics/openAccess |
dc.rights.license.none.fl_str_mv |
Atribuci�n-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) |
dc.rights.coar.none.fl_str_mv |
http://purl.org/coar/access_right/c_abf2 |
rights_invalid_str_mv |
https://creativecommons.org/licenses/by-nc-nd/4.0/ Atribuci�n-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) http://purl.org/coar/access_right/c_abf2 |
eu_rights_str_mv |
openAccess |
dc.format.extent.none.fl_str_mv |
691-696 páginas |
dc.format.medium.spa.fl_str_mv |
Digital |
dc.format.mimetype.eng.fl_str_mv |
application/pdf |
dc.coverage.spatial.eng.fl_str_mv |
Vancouver de Lat: 49 13 00 N degrees minutes Lat: 49.2167 decimal degrees Long: 123 06 00 W degrees minutes Long: -123.1000 decimal degrees |
dc.publisher.faculty.spa.fl_str_mv |
Facultad de Ingeniería |
dc.publisher.program.spa.fl_str_mv |
Ingeniería Industrial |
dc.publisher.department.spa.fl_str_mv |
Departamento de Ingeniería Industrial |
dc.publisher.place.eng.fl_str_mv |
Vancouver |
institution |
Universidad ICESI |
bitstream.url.fl_str_mv |
http://repository.icesi.edu.co/biblioteca_digital/bitstream/10906/83338/1/documento.html |
bitstream.checksum.fl_str_mv |
0af4e7993d121d210b2fd99031f3cc70 |
bitstream.checksumAlgorithm.fl_str_mv |
MD5 |
repository.name.fl_str_mv |
Biblioteca Digital - Universidad icesi |
repository.mail.fl_str_mv |
cdcriollo@icesi.edu.co |
_version_ |
1814094951461421056 |