In accordance with the purpose and objectives of this Degree Work, initially defined, after a documentary search, those metrics that can generally be used in modern project management, to measure the general state of a project and in turn raise objectives of quality for the assurance of the same. Wi...
- Autores:
-
Barrero Velez, Sandra Carolina
Sarmiento Niño, Diego Mauricio
Silva Rodríguez, Lina Maria
- Tipo de recurso:
- Trabajo de grado de pregrado
- Fecha de publicación:
- 2015
- Institución:
- Escuela Colombiana de Ingeniería Julio Garavito
- Repositorio:
- Repositorio Institucional ECI
- Idioma:
- spa
- OAI Identifier:
- oai:repositorio.escuelaing.edu.co:001/264
- Acceso en línea:
- http://catalogo.escuelaing.edu.co/cgi-bin/koha/opac-detail.pl?biblionumber=17778
https://repositorio.escuelaing.edu.co/handle/001/264
- Palabra clave:
- Administración de Proyectos
Gerencia
Project management
Management
- Rights
- openAccess
- License
- Derechos Reservados - Escuela Colombiana de Ingeniería Julio Garavito
id |
ESCUELAIG2_b12cc5d71b6b786b79b9627b8c0be1a6 |
---|---|
oai_identifier_str |
oai:repositorio.escuelaing.edu.co:001/264 |
network_acronym_str |
ESCUELAIG2 |
network_name_str |
Repositorio Institucional ECI |
repository_id_str |
|
dc.title.spa.fl_str_mv |
Desarrollo de un modelo de diagnóstico para la recuperación de proyectos con desviaciones de alcance, tiempo y costo |
title |
Desarrollo de un modelo de diagnóstico para la recuperación de proyectos con desviaciones de alcance, tiempo y costo |
spellingShingle |
Desarrollo de un modelo de diagnóstico para la recuperación de proyectos con desviaciones de alcance, tiempo y costo Administración de Proyectos Gerencia Project management Management |
title_short |
Desarrollo de un modelo de diagnóstico para la recuperación de proyectos con desviaciones de alcance, tiempo y costo |
title_full |
Desarrollo de un modelo de diagnóstico para la recuperación de proyectos con desviaciones de alcance, tiempo y costo |
title_fullStr |
Desarrollo de un modelo de diagnóstico para la recuperación de proyectos con desviaciones de alcance, tiempo y costo |
title_full_unstemmed |
Desarrollo de un modelo de diagnóstico para la recuperación de proyectos con desviaciones de alcance, tiempo y costo |
title_sort |
Desarrollo de un modelo de diagnóstico para la recuperación de proyectos con desviaciones de alcance, tiempo y costo |
dc.creator.fl_str_mv |
Barrero Velez, Sandra Carolina Sarmiento Niño, Diego Mauricio Silva Rodríguez, Lina Maria |
dc.contributor.advisor.spa.fl_str_mv |
López Ruíz, Sofía , (dir) |
dc.contributor.author.spa.fl_str_mv |
Barrero Velez, Sandra Carolina Sarmiento Niño, Diego Mauricio Silva Rodríguez, Lina Maria |
dc.subject.spa.fl_str_mv |
Administración de Proyectos Gerencia |
topic |
Administración de Proyectos Gerencia Project management Management |
dc.subject.keywords.spa.fl_str_mv |
Project management Management |
description |
In accordance with the purpose and objectives of this Degree Work, initially defined, after a documentary search, those metrics that can generally be used in modern project management, to measure the general state of a project and in turn raise objectives of quality for the assurance of the same. With this information, five metrics that are the basis for the development of the Diagnostic Model were defined, as follows: Project definition level, Project global risk level, Project performance index (Earned Value), Customer satisfaction level and Level of motivation of the work team of the project. Based on the defined metrics, checklists were prepared to carry out the survey of the information that allows to diagnose the "health status" of the project. These checklists in turn are the input for the creation of a parametric tool, designed by the Grade Work team in Microsoft Excel. The tool allows, in a simple and orderly manner, to collect the project information, and to obtain based on it a consolidation of the results of the diagnosis, which depend in all cases on the tolerance levels defined by the Organization that owns the project. analyzing. This tool is accompanied by a general application methodology, which is proposed to carry out the process of project diagnosis. Both the methodology and the tool that make up the diagnostic model, product of this Degree Work, were applied to three projects selected from two different sectors of the Colombian industry (energy sector and real estate sector). The application of the model is done in order to prove the applicability of it, and verify that it can be used indistinctly in any project, obtaining valid results, thanks to its main characteristic, which is the parameterization of all the variables. Based on the application of the tool developed and the analysis of the results obtained, some recommendations were proposed for the projects under test. Furthermore, it was concluded that the product obtained with this Degree Work will allow each Project Manager or Company that uses it to obtain information jointly on the strengths and critical points or flaws presented by the project, said information being useful for proposing actions of insurance or, if necessary, recovery plans. Additionally, for the successful development of the degree work, tools and elements of modern project management were applied, using as reference the "Fundamental Guide for project management" of the PMI in its fifth edition. Based on the above, a Management Plan was proposed for the project, the project activities were carried out, both in development and management, and monitoring and control was carried out through biweekly monitoring reports that were presented and analyzed in meetings of the project team with the director of the degree work. Finally, the project was closed, in addition to presenting a final project report, an exercise was carried out to identify and record the lessons learned. |
publishDate |
2015 |
dc.date.accessioned.spa.fl_str_mv |
2015-08-14T21:16:32Z |
dc.date.available.spa.fl_str_mv |
2015-08-14T21:16:32Z |
dc.date.issued.spa.fl_str_mv |
2015 |
dc.date.accessioned.none.fl_str_mv |
2021-10-01T17:03:32Z |
dc.date.available.none.fl_str_mv |
2021-10-01T17:03:32Z |
dc.type.spa.fl_str_mv |
Trabajo de grado - Especialización |
dc.type.coarversion.fl_str_mv |
http://purl.org/coar/version/c_970fb48d4fbd8a85 |
dc.type.version.spa.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
dc.type.coar.spa.fl_str_mv |
http://purl.org/coar/resource_type/c_7a1f |
dc.type.content.spa.fl_str_mv |
Text |
dc.type.driver.spa.fl_str_mv |
info:eu-repo/semantics/bachelorThesis |
dc.type.redcol.spa.fl_str_mv |
http://purl.org/redcol/resource_type/TP |
format |
http://purl.org/coar/resource_type/c_7a1f |
status_str |
publishedVersion |
dc.identifier.uri.spa.fl_str_mv |
http://catalogo.escuelaing.edu.co/cgi-bin/koha/opac-detail.pl?biblionumber=17778 |
dc.identifier.uri.none.fl_str_mv |
https://repositorio.escuelaing.edu.co/handle/001/264 |
url |
http://catalogo.escuelaing.edu.co/cgi-bin/koha/opac-detail.pl?biblionumber=17778 https://repositorio.escuelaing.edu.co/handle/001/264 |
dc.language.iso.spa.fl_str_mv |
spa |
language |
spa |
dc.rights.spa.fl_str_mv |
Derechos Reservados - Escuela Colombiana de Ingeniería Julio Garavito |
dc.rights.coar.fl_str_mv |
http://purl.org/coar/access_right/c_abf2 |
dc.rights.uri.spa.fl_str_mv |
https://creativecommons.org/licenses/by-nc/4.0/ |
dc.rights.accessrights.spa.fl_str_mv |
info:eu-repo/semantics/openAccess |
dc.rights.creativecommons.spa.fl_str_mv |
Atribución-NoComercial 4.0 Internacional (CC BY-NC 4.0) |
rights_invalid_str_mv |
Derechos Reservados - Escuela Colombiana de Ingeniería Julio Garavito https://creativecommons.org/licenses/by-nc/4.0/ Atribución-NoComercial 4.0 Internacional (CC BY-NC 4.0) http://purl.org/coar/access_right/c_abf2 |
eu_rights_str_mv |
openAccess |
dc.format.mimetype.spa.fl_str_mv |
application/pdf |
dc.publisher.spa.fl_str_mv |
Escuela Colombiana de Ingeniería Julio Garavito |
dc.publisher.program.spa.fl_str_mv |
Especialización en Desarrollo y Gerencia Integral de Proyectos |
institution |
Escuela Colombiana de Ingeniería Julio Garavito |
bitstream.url.fl_str_mv |
https://repositorio.escuelaing.edu.co/bitstream/001/264/1/Barrero%20Velez%2c%20Sandra%20Carolina%20-%202015.pdf https://repositorio.escuelaing.edu.co/bitstream/001/264/2/Anexos.xlsm https://repositorio.escuelaing.edu.co/bitstream/001/264/3/Libro%20de%20Gerncia.pdf https://repositorio.escuelaing.edu.co/bitstream/001/264/4/Sustentaci%c3%b3n.pdf https://repositorio.escuelaing.edu.co/bitstream/001/264/5/license.txt https://repositorio.escuelaing.edu.co/bitstream/001/264/6/HA-Especializaci%c3%b3n%20en%20Desarrollo%20y%20Gerencia%20de%20Proyectos-1020737090.pdf.txt https://repositorio.escuelaing.edu.co/bitstream/001/264/7/HA-Especializaci%c3%b3n%20en%20Desarrollo%20y%20Gerencia%20de%20Proyectos-1020737090-Libro%20de%20Gerncia.pdf.txt https://repositorio.escuelaing.edu.co/bitstream/001/264/8/HA-Especializaci%c3%b3n%20en%20Desarrollo%20y%20Gerencia%20de%20Proyectos-1020737090-Sustentaci%c3%b3n.pdf.txt https://repositorio.escuelaing.edu.co/bitstream/001/264/18/Barrero%20Velez%2c%20Sandra%20Carolina%20-%202015.pdf.txt https://repositorio.escuelaing.edu.co/bitstream/001/264/20/Libro%20de%20Gerncia.pdf.txt https://repositorio.escuelaing.edu.co/bitstream/001/264/22/Sustentaci%c3%b3n.pdf.txt https://repositorio.escuelaing.edu.co/bitstream/001/264/12/HA-Especializaci%c3%b3n%20en%20Desarrollo%20y%20Gerencia%20de%20Proyectos-1020737090.pdf.jpg https://repositorio.escuelaing.edu.co/bitstream/001/264/13/HA-Especializaci%c3%b3n%20en%20Desarrollo%20y%20Gerencia%20de%20Proyectos-1020737090-Libro%20de%20Gerncia.pdf.jpg https://repositorio.escuelaing.edu.co/bitstream/001/264/14/HA-Especializaci%c3%b3n%20en%20Desarrollo%20y%20Gerencia%20de%20Proyectos-1020737090-Sustentaci%c3%b3n.pdf.jpg https://repositorio.escuelaing.edu.co/bitstream/001/264/19/Barrero%20Velez%2c%20Sandra%20Carolina%20-%202015.pdf.jpg https://repositorio.escuelaing.edu.co/bitstream/001/264/21/Libro%20de%20Gerncia.pdf.jpg https://repositorio.escuelaing.edu.co/bitstream/001/264/23/Sustentaci%c3%b3n.pdf.jpg |
bitstream.checksum.fl_str_mv |
bc08fa158158949112d04e107d1a5ddd bb77a5ff5a9f562ea553afc071b07070 3a8ea4b38e5419d79975f7ba47f6336b 259989529bcc4855dbb3ac29c543aa8d 9480849945fd70c1da11fa639db5a11c 322accff9463d865ee0b1f097f5971ae 1aaa36d20791fad56a2d1973706c7aef 317da99c32789e9d9477e4cf58ce97c5 61a9e77c22650d2d4d12cafa1f81cf1d c673db09976da39461e315219b1441eb 2687a9762cfc1c4f67802f5361b2342c 710e4888e4956712276b8dc3c671c3ff e51ccf6b54827d642716594fbd4121e2 5f827ecc3025fbf9fb5408e78e4f2cd7 fc064b5765c6ca1df09383f01f37c95a ca31a0551a4ae32a1dc3c16ba9104747 61029e749a0d4434044fb6c3f090e139 |
bitstream.checksumAlgorithm.fl_str_mv |
MD5 MD5 MD5 MD5 MD5 MD5 MD5 MD5 MD5 MD5 MD5 MD5 MD5 MD5 MD5 MD5 MD5 |
repository.name.fl_str_mv |
Repositorio Escuela Colombiana de Ingeniería Julio Garavito |
repository.mail.fl_str_mv |
repositorio.eci@escuelaing.edu.co |
_version_ |
1814355628487868416 |
spelling |
López Ruíz, Sofía , (dir)3f809397026782b5bd813bee8deefe75300Barrero Velez, Sandra Carolinac1bc473f8dd37bd6aa4302116ced7b66600Sarmiento Niño, Diego Mauricio7ffaca23da0cf6762ebcd9c75a61d398600Silva Rodríguez, Lina Maria6da56a402df075f31b499d0c62c0b4436002015-08-14T21:16:32Z2021-10-01T17:03:32Z2015-08-14T21:16:32Z2021-10-01T17:03:32Z2015http://catalogo.escuelaing.edu.co/cgi-bin/koha/opac-detail.pl?biblionumber=17778https://repositorio.escuelaing.edu.co/handle/001/264In accordance with the purpose and objectives of this Degree Work, initially defined, after a documentary search, those metrics that can generally be used in modern project management, to measure the general state of a project and in turn raise objectives of quality for the assurance of the same. With this information, five metrics that are the basis for the development of the Diagnostic Model were defined, as follows: Project definition level, Project global risk level, Project performance index (Earned Value), Customer satisfaction level and Level of motivation of the work team of the project. Based on the defined metrics, checklists were prepared to carry out the survey of the information that allows to diagnose the "health status" of the project. These checklists in turn are the input for the creation of a parametric tool, designed by the Grade Work team in Microsoft Excel. The tool allows, in a simple and orderly manner, to collect the project information, and to obtain based on it a consolidation of the results of the diagnosis, which depend in all cases on the tolerance levels defined by the Organization that owns the project. analyzing. This tool is accompanied by a general application methodology, which is proposed to carry out the process of project diagnosis. Both the methodology and the tool that make up the diagnostic model, product of this Degree Work, were applied to three projects selected from two different sectors of the Colombian industry (energy sector and real estate sector). The application of the model is done in order to prove the applicability of it, and verify that it can be used indistinctly in any project, obtaining valid results, thanks to its main characteristic, which is the parameterization of all the variables. Based on the application of the tool developed and the analysis of the results obtained, some recommendations were proposed for the projects under test. Furthermore, it was concluded that the product obtained with this Degree Work will allow each Project Manager or Company that uses it to obtain information jointly on the strengths and critical points or flaws presented by the project, said information being useful for proposing actions of insurance or, if necessary, recovery plans. Additionally, for the successful development of the degree work, tools and elements of modern project management were applied, using as reference the "Fundamental Guide for project management" of the PMI in its fifth edition. Based on the above, a Management Plan was proposed for the project, the project activities were carried out, both in development and management, and monitoring and control was carried out through biweekly monitoring reports that were presented and analyzed in meetings of the project team with the director of the degree work. Finally, the project was closed, in addition to presenting a final project report, an exercise was carried out to identify and record the lessons learned.De acuerdo con el propósito y los objetivos de este Trabajo de Grado, se definieron inicialmente, tras una búsqueda documental, aquellas métricas que generalmente pueden ser empleadas en la gerencia moderna de proyectos, para medir el estado general de un proyecto y a su vez plantear objetivos de calidad para el aseguramiento de la misma. Con dicha información se definieron cinco métricas que son la base de desarrollo del Modelo de Diagnóstico, así: Nivel de definición del proyecto, Nivel global de riesgo del proyecto, Índice de desempeño del proyecto (Valor Ganado), Nivel de satisfacción del cliente y Nivel de motivación del equipo de trabajo del proyecto. Con base en las métricas definidas, se elaboraron listas de chequeo para realizar el levantamiento de la información que permite diagnosticar en qué “estado de salud” se encuentra el proyecto. Dichas listas de chequeo a su vez son el insumo para la creación de una herramienta paramétrica, diseñada por el equipo de Trabajo de Grado en Microsoft Excel. La herramienta permite de una manera sencilla y ordenada recolectar la información del proyecto, y obtener con base en ella un consolidado de los resultados del diagnóstico, que dependen en todos los casos de los niveles de tolerancia definidos por la Organización dueña del proyecto que se esté analizando. Dicha herramienta está acompañada por una metodología general de aplicación, que se propone para realizar el proceso de diagnóstico de proyectos. Tanto la metodología como la herramienta que componen el modelo de diagnóstico, producto de este Trabajo de Grado, fueron aplicadas a tres proyectos seleccionados de dos sectores diferentes de la industria colombiana (sector energético y sector inmobiliario). La aplicación del modelo se realiza con el fin de probar la aplicabilidad del mismo, y verificar que éste pueda ser empleado indistintamente en cualquier proyecto, obteniendo resultados válidos, gracias a su característica principal que es la parametrización de todas las variables. Con base en la aplicación de la herramienta desarrollada y el análisis de los resultados obtenidos, se plantearon algunas recomendaciones para los proyectos objeto de la prueba. Además se concluyó, que el producto obtenido con este Trabajo de Grado permitirá a cada Gerente de proyecto o Compañía que lo utilice, obtener información de manera conjunta sobre las fortalezas y puntos críticos o falencias que presente el proyecto, siendo dicha información útil para plantear acciones de aseguramiento o de ser necesario planes de recuperación. Adicionalmente, para el desarrollo exitoso del trabajo de grado, se aplicaron herramientas y elementos de la gerencia moderna de proyectos, utilizando como referencia la “Guía de los fundamentos para la dirección de proyectos” del PMI en su quinta edición. Con base en lo anterior se planteó un Plan de Gerencia para el proyecto, se ejecutaron las actividades del proyecto, tanto de desarrollo como gerenciales, y se llevó a cabo el seguimiento y control al mismo mediante informes de seguimiento quincenal que se presentaban y analizaban en reuniones del equipo del proyecto con la directora del trabajo de grado. Finalmente se realizó el cierre del proyecto donde además de presentar un informe final del proyecto, se realizó un ejercicio para la identificación y registro de las lecciones aprendidas.EspecializaciónEspecialista en Desarrollo y Gerencia Integral de Proyectosapplication/pdfspaEscuela Colombiana de Ingeniería Julio GaravitoEspecialización en Desarrollo y Gerencia Integral de ProyectosDerechos Reservados - Escuela Colombiana de Ingeniería Julio Garavitohttps://creativecommons.org/licenses/by-nc/4.0/info:eu-repo/semantics/openAccessAtribución-NoComercial 4.0 Internacional (CC BY-NC 4.0)http://purl.org/coar/access_right/c_abf2Administración de ProyectosGerenciaProject managementManagementDesarrollo de un modelo de diagnóstico para la recuperación de proyectos con desviaciones de alcance, tiempo y costoTrabajo de grado - Especializacióninfo:eu-repo/semantics/publishedVersionhttp://purl.org/coar/resource_type/c_7a1fTextinfo:eu-repo/semantics/bachelorThesishttp://purl.org/redcol/resource_type/TPhttp://purl.org/coar/version/c_970fb48d4fbd8a85ORIGINALBarrero Velez, Sandra Carolina - 2015.pdfPDFapplication/pdf4627988https://repositorio.escuelaing.edu.co/bitstream/001/264/1/Barrero%20Velez%2c%20Sandra%20Carolina%20-%202015.pdfbc08fa158158949112d04e107d1a5dddMD51open accessAnexos.xlsmAnexosapplication/octet-stream816500https://repositorio.escuelaing.edu.co/bitstream/001/264/2/Anexos.xlsmbb77a5ff5a9f562ea553afc071b07070MD52open accessLibro de Gerncia.pdfLibro de Gerenciaapplication/pdf12040310https://repositorio.escuelaing.edu.co/bitstream/001/264/3/Libro%20de%20Gerncia.pdf3a8ea4b38e5419d79975f7ba47f6336bMD53open accessSustentación.pdfPresentaciónapplication/pdf4672928https://repositorio.escuelaing.edu.co/bitstream/001/264/4/Sustentaci%c3%b3n.pdf259989529bcc4855dbb3ac29c543aa8dMD54open accessLICENSElicense.txttext/plain1762https://repositorio.escuelaing.edu.co/bitstream/001/264/5/license.txt9480849945fd70c1da11fa639db5a11cMD55open accessTEXTHA-Especialización en Desarrollo y Gerencia de Proyectos-1020737090.pdf.txtExtracted texttext/plain207415https://repositorio.escuelaing.edu.co/bitstream/001/264/6/HA-Especializaci%c3%b3n%20en%20Desarrollo%20y%20Gerencia%20de%20Proyectos-1020737090.pdf.txt322accff9463d865ee0b1f097f5971aeMD56open accessHA-Especialización en Desarrollo y Gerencia de Proyectos-1020737090-Libro de Gerncia.pdf.txtExtracted texttext/plain254671https://repositorio.escuelaing.edu.co/bitstream/001/264/7/HA-Especializaci%c3%b3n%20en%20Desarrollo%20y%20Gerencia%20de%20Proyectos-1020737090-Libro%20de%20Gerncia.pdf.txt1aaa36d20791fad56a2d1973706c7aefMD57open accessHA-Especialización en Desarrollo y Gerencia de Proyectos-1020737090-Sustentación.pdf.txtExtracted texttext/plain22604https://repositorio.escuelaing.edu.co/bitstream/001/264/8/HA-Especializaci%c3%b3n%20en%20Desarrollo%20y%20Gerencia%20de%20Proyectos-1020737090-Sustentaci%c3%b3n.pdf.txt317da99c32789e9d9477e4cf58ce97c5MD58open accessBarrero Velez, Sandra Carolina - 2015.pdf.txtBarrero Velez, Sandra Carolina - 2015.pdf.txtExtracted texttext/plain206251https://repositorio.escuelaing.edu.co/bitstream/001/264/18/Barrero%20Velez%2c%20Sandra%20Carolina%20-%202015.pdf.txt61a9e77c22650d2d4d12cafa1f81cf1dMD518open accessLibro de Gerncia.pdf.txtLibro de Gerncia.pdf.txtExtracted texttext/plain254424https://repositorio.escuelaing.edu.co/bitstream/001/264/20/Libro%20de%20Gerncia.pdf.txtc673db09976da39461e315219b1441ebMD520open accessSustentación.pdf.txtSustentación.pdf.txtExtracted texttext/plain22536https://repositorio.escuelaing.edu.co/bitstream/001/264/22/Sustentaci%c3%b3n.pdf.txt2687a9762cfc1c4f67802f5361b2342cMD522open accessTHUMBNAILHA-Especialización en Desarrollo y Gerencia de Proyectos-1020737090.pdf.jpgIM Thumbnailimage/jpeg3601https://repositorio.escuelaing.edu.co/bitstream/001/264/12/HA-Especializaci%c3%b3n%20en%20Desarrollo%20y%20Gerencia%20de%20Proyectos-1020737090.pdf.jpg710e4888e4956712276b8dc3c671c3ffMD512open accessHA-Especialización en Desarrollo y Gerencia de Proyectos-1020737090-Libro de Gerncia.pdf.jpgIM Thumbnailimage/jpeg3624https://repositorio.escuelaing.edu.co/bitstream/001/264/13/HA-Especializaci%c3%b3n%20en%20Desarrollo%20y%20Gerencia%20de%20Proyectos-1020737090-Libro%20de%20Gerncia.pdf.jpge51ccf6b54827d642716594fbd4121e2MD513open accessHA-Especialización en Desarrollo y Gerencia de Proyectos-1020737090-Sustentación.pdf.jpgIM Thumbnailimage/jpeg4874https://repositorio.escuelaing.edu.co/bitstream/001/264/14/HA-Especializaci%c3%b3n%20en%20Desarrollo%20y%20Gerencia%20de%20Proyectos-1020737090-Sustentaci%c3%b3n.pdf.jpg5f827ecc3025fbf9fb5408e78e4f2cd7MD514open accessBarrero Velez, Sandra Carolina - 2015.pdf.jpgBarrero Velez, Sandra Carolina - 2015.pdf.jpgGenerated Thumbnailimage/jpeg6498https://repositorio.escuelaing.edu.co/bitstream/001/264/19/Barrero%20Velez%2c%20Sandra%20Carolina%20-%202015.pdf.jpgfc064b5765c6ca1df09383f01f37c95aMD519open accessLibro de Gerncia.pdf.jpgLibro de Gerncia.pdf.jpgGenerated Thumbnailimage/jpeg7385https://repositorio.escuelaing.edu.co/bitstream/001/264/21/Libro%20de%20Gerncia.pdf.jpgca31a0551a4ae32a1dc3c16ba9104747MD521open accessSustentación.pdf.jpgSustentación.pdf.jpgGenerated Thumbnailimage/jpeg9849https://repositorio.escuelaing.edu.co/bitstream/001/264/23/Sustentaci%c3%b3n.pdf.jpg61029e749a0d4434044fb6c3f090e139MD523open access001/264oai:repositorio.escuelaing.edu.co:001/2642021-10-01 17:31:36.574open accessRepositorio Escuela Colombiana de Ingeniería Julio Garavitorepositorio.eci@escuelaing.edu.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 |