Diseño y análisis de costos de un sistema de gestión ambiental, seguridad y salud en el trabajo para el proyecto de limpieza de canales y quebradas en la ciudad de Bogotá D.C.

The present work is based on the analysis of environmental management systems and health and safety at work that are being designed and implemented in the cleaning project of canals and streams of the city of Bogotá under the interadministrative agreement 430 of 2014, using as a basis the ISO 14001:...

Full description

Autores:
Rojas Jimenez, Andres Camilo
Polo Urueña, Rahiza
Galvis Cañon, Adriana Milena
Tipo de recurso:
Trabajo de grado de pregrado
Fecha de publicación:
2016
Institución:
Escuela Colombiana de Ingeniería Julio Garavito
Repositorio:
Repositorio Institucional ECI
Idioma:
spa
OAI Identifier:
oai:repositorio.escuelaing.edu.co:001/372
Acceso en línea:
http://catalogo.escuelaing.edu.co/cgi-bin/koha/opac-detail.pl?biblionumber=18063
https://repositorio.escuelaing.edu.co/handle/001/372
Palabra clave:
Control de Calidad
Salud ocupacional
Medio Ambiente
Normas
Calidad
Environmental
Occupational safety and health
Quality
Norm
Rights
openAccess
License
Derechos Reservados - Escuela Colombiana de Ingeniería Julio Garavito
id ESCUELAIG2_2808b55c1713ad792de4c3d9cc6b2f1a
oai_identifier_str oai:repositorio.escuelaing.edu.co:001/372
network_acronym_str ESCUELAIG2
network_name_str Repositorio Institucional ECI
repository_id_str
dc.title.spa.fl_str_mv Diseño y análisis de costos de un sistema de gestión ambiental, seguridad y salud en el trabajo para el proyecto de limpieza de canales y quebradas en la ciudad de Bogotá D.C.
title Diseño y análisis de costos de un sistema de gestión ambiental, seguridad y salud en el trabajo para el proyecto de limpieza de canales y quebradas en la ciudad de Bogotá D.C.
spellingShingle Diseño y análisis de costos de un sistema de gestión ambiental, seguridad y salud en el trabajo para el proyecto de limpieza de canales y quebradas en la ciudad de Bogotá D.C.
Control de Calidad
Salud ocupacional
Medio Ambiente
Normas
Calidad
Environmental
Occupational safety and health
Quality
Norm
title_short Diseño y análisis de costos de un sistema de gestión ambiental, seguridad y salud en el trabajo para el proyecto de limpieza de canales y quebradas en la ciudad de Bogotá D.C.
title_full Diseño y análisis de costos de un sistema de gestión ambiental, seguridad y salud en el trabajo para el proyecto de limpieza de canales y quebradas en la ciudad de Bogotá D.C.
title_fullStr Diseño y análisis de costos de un sistema de gestión ambiental, seguridad y salud en el trabajo para el proyecto de limpieza de canales y quebradas en la ciudad de Bogotá D.C.
title_full_unstemmed Diseño y análisis de costos de un sistema de gestión ambiental, seguridad y salud en el trabajo para el proyecto de limpieza de canales y quebradas en la ciudad de Bogotá D.C.
title_sort Diseño y análisis de costos de un sistema de gestión ambiental, seguridad y salud en el trabajo para el proyecto de limpieza de canales y quebradas en la ciudad de Bogotá D.C.
dc.creator.fl_str_mv Rojas Jimenez, Andres Camilo
Polo Urueña, Rahiza
Galvis Cañon, Adriana Milena
dc.contributor.advisor.spa.fl_str_mv Ramos Paredes, Ernesto, (dir)
dc.contributor.author.spa.fl_str_mv Rojas Jimenez, Andres Camilo
Polo Urueña, Rahiza
Galvis Cañon, Adriana Milena
dc.subject.spa.fl_str_mv Control de Calidad
Salud ocupacional
Medio Ambiente
Normas
Calidad
topic Control de Calidad
Salud ocupacional
Medio Ambiente
Normas
Calidad
Environmental
Occupational safety and health
Quality
Norm
dc.subject.keywords.spa.fl_str_mv Environmental
Occupational safety and health
Quality
Norm
description The present work is based on the analysis of environmental management systems and health and safety at work that are being designed and implemented in the cleaning project of canals and streams of the city of Bogotá under the interadministrative agreement 430 of 2014, using as a basis the ISO 14001: 2015, OHSAS 18001: 2007 and Decree 1072 of 2015, in order to find the flaws that have not allowed the full implementation of the systems to generate actions that allow compliance with the requirements of the same and associated costs, so that the process can be planned and resources managed to minimize risks, contribute to employee welfare, increase the company's productivity, without generating negative impacts on the environment in the path of mitigation and adaptation to climate change. The first thing that was developed was the identification of the requirements of the standards, ISO 14001: 2015, OHSAS 18001: 2007 and Decree 1072 of 2015, for the construction of a checklist for each of the standards. Afterwards, a diagnosis of the situation of the project against the norms was made, with the realization of field visits and the application of the previously constructed tool. From the application of the checklists, the shortcomings were identified against the norms, generating activities that would lead to compliance with the associated requirements. The proposed activities were planned and quantified in a cost schedule, which was entered into the budget to result in the total investment required by the organization to comply with the rules in the channel and stream cleaning project, so that they can initiate steps that lead to the completion of the process in a planned manner.
publishDate 2016
dc.date.accessioned.spa.fl_str_mv 2016-02-10T21:10:39Z
dc.date.available.spa.fl_str_mv 2016-02-10T21:10:39Z
dc.date.issued.spa.fl_str_mv 2016
dc.date.accessioned.none.fl_str_mv 2021-10-01T16:18:23Z
dc.date.available.none.fl_str_mv 2021-10-01T16:18:23Z
dc.type.spa.fl_str_mv Trabajo de grado - Especialización
dc.type.coarversion.fl_str_mv http://purl.org/coar/version/c_970fb48d4fbd8a85
dc.type.version.spa.fl_str_mv info:eu-repo/semantics/publishedVersion
dc.type.coar.spa.fl_str_mv http://purl.org/coar/resource_type/c_7a1f
dc.type.content.spa.fl_str_mv Text
dc.type.driver.spa.fl_str_mv info:eu-repo/semantics/bachelorThesis
dc.type.redcol.spa.fl_str_mv http://purl.org/redcol/resource_type/TP
format http://purl.org/coar/resource_type/c_7a1f
status_str publishedVersion
dc.identifier.uri.spa.fl_str_mv http://catalogo.escuelaing.edu.co/cgi-bin/koha/opac-detail.pl?biblionumber=18063
dc.identifier.uri.none.fl_str_mv https://repositorio.escuelaing.edu.co/handle/001/372
url http://catalogo.escuelaing.edu.co/cgi-bin/koha/opac-detail.pl?biblionumber=18063
https://repositorio.escuelaing.edu.co/handle/001/372
dc.language.iso.spa.fl_str_mv spa
language spa
dc.relation.indices.spa.fl_str_mv CORPOICA
dc.rights.spa.fl_str_mv Derechos Reservados - Escuela Colombiana de Ingeniería Julio Garavito
dc.rights.coar.fl_str_mv http://purl.org/coar/access_right/c_abf2
dc.rights.uri.spa.fl_str_mv https://creativecommons.org/licenses/by-nc/4.0/
dc.rights.accessrights.spa.fl_str_mv info:eu-repo/semantics/openAccess
dc.rights.creativecommons.spa.fl_str_mv Atribución-NoComercial 4.0 Internacional (CC BY-NC 4.0)
rights_invalid_str_mv Derechos Reservados - Escuela Colombiana de Ingeniería Julio Garavito
https://creativecommons.org/licenses/by-nc/4.0/
Atribución-NoComercial 4.0 Internacional (CC BY-NC 4.0)
http://purl.org/coar/access_right/c_abf2
eu_rights_str_mv openAccess
dc.format.mimetype.spa.fl_str_mv application/pdf
dc.publisher.spa.fl_str_mv Escuela Colombiana de Ingeniería Julio Garavito
dc.publisher.program.spa.fl_str_mv Especialización en Gestión Integrada QHSE
institution Escuela Colombiana de Ingeniería Julio Garavito
bitstream.url.fl_str_mv https://repositorio.escuelaing.edu.co/bitstream/001/372/1/Rojas%20Jimenez%2c%20Andres%20Camilo%20-%202016.pdf
https://repositorio.escuelaing.edu.co/bitstream/001/372/2/license.txt
https://repositorio.escuelaing.edu.co/bitstream/001/372/3/EC-Especializaci%c3%b3n%20en%20Gesti%c3%b3n%20Integrada%20QHSE-1074414219.pdf.txt
https://repositorio.escuelaing.edu.co/bitstream/001/372/7/Rojas%20Jimenez%2c%20Andres%20Camilo%20-%202016.pdf.txt
https://repositorio.escuelaing.edu.co/bitstream/001/372/5/EC-Especializaci%c3%b3n%20en%20Gesti%c3%b3n%20Integrada%20QHSE-1074414219.pdf.jpg
https://repositorio.escuelaing.edu.co/bitstream/001/372/8/Rojas%20Jimenez%2c%20Andres%20Camilo%20-%202016.pdf.jpg
bitstream.checksum.fl_str_mv 7bd7b51e86da05c6ddc701f50e57bff3
9480849945fd70c1da11fa639db5a11c
fa85485c47246fea9775fcb27f3f25a3
83311c4277526abec3c379b0c1aa0184
77180d4ff7dea5182ed63f54ed6373b1
66b04ac8a735eb0588e9ba31369b2135
bitstream.checksumAlgorithm.fl_str_mv MD5
MD5
MD5
MD5
MD5
MD5
repository.name.fl_str_mv Repositorio Escuela Colombiana de Ingeniería Julio Garavito
repository.mail.fl_str_mv repositorio.eci@escuelaing.edu.co
_version_ 1814355581071261696
spelling Ramos Paredes, Ernesto, (dir)1bb77848722a33fb437a3a416c91202f300Rojas Jimenez, Andres Camilo4ea9c9d2fef285392583bc101b12d138600Polo Urueña, Rahizab6a915edb8ea238124d9fca6a84cce09600Galvis Cañon, Adriana Milena5fa75021dd5f3174b35884af0c9c5d586002016-02-10T21:10:39Z2021-10-01T16:18:23Z2016-02-10T21:10:39Z2021-10-01T16:18:23Z2016http://catalogo.escuelaing.edu.co/cgi-bin/koha/opac-detail.pl?biblionumber=18063https://repositorio.escuelaing.edu.co/handle/001/372The present work is based on the analysis of environmental management systems and health and safety at work that are being designed and implemented in the cleaning project of canals and streams of the city of Bogotá under the interadministrative agreement 430 of 2014, using as a basis the ISO 14001: 2015, OHSAS 18001: 2007 and Decree 1072 of 2015, in order to find the flaws that have not allowed the full implementation of the systems to generate actions that allow compliance with the requirements of the same and associated costs, so that the process can be planned and resources managed to minimize risks, contribute to employee welfare, increase the company's productivity, without generating negative impacts on the environment in the path of mitigation and adaptation to climate change. The first thing that was developed was the identification of the requirements of the standards, ISO 14001: 2015, OHSAS 18001: 2007 and Decree 1072 of 2015, for the construction of a checklist for each of the standards. Afterwards, a diagnosis of the situation of the project against the norms was made, with the realization of field visits and the application of the previously constructed tool. From the application of the checklists, the shortcomings were identified against the norms, generating activities that would lead to compliance with the associated requirements. The proposed activities were planned and quantified in a cost schedule, which was entered into the budget to result in the total investment required by the organization to comply with the rules in the channel and stream cleaning project, so that they can initiate steps that lead to the completion of the process in a planned manner.El presente trabajo está basado en el análisis de los sistemas de gestión ambiental y de seguridad y salud en el trabajo que se vienen diseñando e implementando en el proyecto de limpieza de canales y quebradas de la ciudad de Bogotá bajo el convenio interadministrativo 430 de 2014, utilizando como base las normas ISO 14001:2015, OHSAS 18001:2007 y el Decreto 1072 de 2015, con el fin de encontrar las falencias que no han permitido la implementación completa de los sistemas para generar acciones que le permitan el cumplimiento de los requisitos de las mismas y los costos asociados, de manera que se pueda planificar el proceso y gestionar los recursos para minimizar riesgos, contribuir con el bienestar de los empleados, aumentar la productividad de la empresa, sin generar impactos negativos al ambiente en el camino de la mitigación y adaptación al cambio climático. Lo primero que se desarrollo fue la identificación de los requisitos de las norma, ISO 14001:2015, OHSAS 18001:2007 y el Decreto 1072 de 2015, para la construcción de una listas de chequeo para cada una las normas. Después, se realizó un diagnóstico de la situación del proyecto frente a las normas, con la realización de visitas de campo y la aplicación de la herramienta anteriormente construida. De la aplicación de las listas de chequeo se identificaron las falencias frente a las normas, generando actividades que llevaran al cumplimiento de los requisitos asociados. Las actividades propuestas se planificaron y cuantificaron en un cronograma de costos, los cuales ingresaron al presupuesto para dar como resultado la inversión total que requiere la organización para dar cumplimiento a las normas en el proyecto de limpieza de canales y quebradas, de manera que puedan iniciar gestiones que lleven a la terminación del proceso de una manera planificada.EspecializaciónEspecialista en Gestión Integrada QHSEapplication/pdfspaEscuela Colombiana de Ingeniería Julio GaravitoEspecialización en Gestión Integrada QHSEDerechos Reservados - Escuela Colombiana de Ingeniería Julio Garavitohttps://creativecommons.org/licenses/by-nc/4.0/info:eu-repo/semantics/openAccessAtribución-NoComercial 4.0 Internacional (CC BY-NC 4.0)http://purl.org/coar/access_right/c_abf2Control de CalidadSalud ocupacionalMedio AmbienteNormasCalidadEnvironmentalOccupational safety and healthQualityNormDiseño y análisis de costos de un sistema de gestión ambiental, seguridad y salud en el trabajo para el proyecto de limpieza de canales y quebradas en la ciudad de Bogotá D.C.Trabajo de grado - Especializacióninfo:eu-repo/semantics/publishedVersionhttp://purl.org/coar/resource_type/c_7a1fTextinfo:eu-repo/semantics/bachelorThesishttp://purl.org/redcol/resource_type/TPhttp://purl.org/coar/version/c_970fb48d4fbd8a85CORPOICAORIGINALRojas Jimenez, Andres Camilo - 2016.pdfPDFapplication/pdf1762380https://repositorio.escuelaing.edu.co/bitstream/001/372/1/Rojas%20Jimenez%2c%20Andres%20Camilo%20-%202016.pdf7bd7b51e86da05c6ddc701f50e57bff3MD51open accessLICENSElicense.txttext/plain1762https://repositorio.escuelaing.edu.co/bitstream/001/372/2/license.txt9480849945fd70c1da11fa639db5a11cMD52open accessTEXTEC-Especialización en Gestión Integrada QHSE-1074414219.pdf.txtExtracted texttext/plain160052https://repositorio.escuelaing.edu.co/bitstream/001/372/3/EC-Especializaci%c3%b3n%20en%20Gesti%c3%b3n%20Integrada%20QHSE-1074414219.pdf.txtfa85485c47246fea9775fcb27f3f25a3MD53open accessRojas Jimenez, Andres Camilo - 2016.pdf.txtRojas Jimenez, Andres Camilo - 2016.pdf.txtExtracted texttext/plain159299https://repositorio.escuelaing.edu.co/bitstream/001/372/7/Rojas%20Jimenez%2c%20Andres%20Camilo%20-%202016.pdf.txt83311c4277526abec3c379b0c1aa0184MD57open accessTHUMBNAILEC-Especialización en Gestión Integrada QHSE-1074414219.pdf.jpgIM Thumbnailimage/jpeg3310https://repositorio.escuelaing.edu.co/bitstream/001/372/5/EC-Especializaci%c3%b3n%20en%20Gesti%c3%b3n%20Integrada%20QHSE-1074414219.pdf.jpg77180d4ff7dea5182ed63f54ed6373b1MD55open accessRojas Jimenez, Andres Camilo - 2016.pdf.jpgRojas Jimenez, Andres Camilo - 2016.pdf.jpgGenerated Thumbnailimage/jpeg6907https://repositorio.escuelaing.edu.co/bitstream/001/372/8/Rojas%20Jimenez%2c%20Andres%20Camilo%20-%202016.pdf.jpg66b04ac8a735eb0588e9ba31369b2135MD58open access001/372oai:repositorio.escuelaing.edu.co:001/3722021-10-01 16:13:25.05open accessRepositorio Escuela Colombiana de Ingeniería Julio Garavitorepositorio.eci@escuelaing.edu.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