Manual para estimar el tiempo requerido en la construcción de vivienda
El presente Manual de Estimación del Tiempo Requerido en la Construcción de una Vivienda es el producto de un análisis sistemático de literatura. Se fundamenta en conocimientos científicos, técnicos y legales. Su contenido está estructurado en seis capítulos titulados: contextualización, marco refer...
- Autores:
-
Matíz Beltrán, Nathalia Katherine
Rueda Gómez, Lizeth Natalia
- Tipo de recurso:
- Trabajo de grado de pregrado
- Fecha de publicación:
- 2020
- Institución:
- Universidad Cooperativa de Colombia
- Repositorio:
- Repositorio UCC
- Idioma:
- OAI Identifier:
- oai:repository.ucc.edu.co:20.500.12494/28498
- Acceso en línea:
- https://hdl.handle.net/20.500.12494/28498
- Palabra clave:
- Construcción
Vivienda
Análisis
Medición
Proceso
Rendimiento
Mano de obra
Consumo
Building
Living place
Analysis
Measurement
Process
Performance
Workforce
Consumption
- Rights
- openAccess
- License
- Atribución – No comercial – Sin Derivar
id |
COOPER2_ea529c1b575e07e7d01ccfecf10c4318 |
---|---|
oai_identifier_str |
oai:repository.ucc.edu.co:20.500.12494/28498 |
network_acronym_str |
COOPER2 |
network_name_str |
Repositorio UCC |
repository_id_str |
|
dc.title.spa.fl_str_mv |
Manual para estimar el tiempo requerido en la construcción de vivienda |
title |
Manual para estimar el tiempo requerido en la construcción de vivienda |
spellingShingle |
Manual para estimar el tiempo requerido en la construcción de vivienda Construcción Vivienda Análisis Medición Proceso Rendimiento Mano de obra Consumo Building Living place Analysis Measurement Process Performance Workforce Consumption |
title_short |
Manual para estimar el tiempo requerido en la construcción de vivienda |
title_full |
Manual para estimar el tiempo requerido en la construcción de vivienda |
title_fullStr |
Manual para estimar el tiempo requerido en la construcción de vivienda |
title_full_unstemmed |
Manual para estimar el tiempo requerido en la construcción de vivienda |
title_sort |
Manual para estimar el tiempo requerido en la construcción de vivienda |
dc.creator.fl_str_mv |
Matíz Beltrán, Nathalia Katherine Rueda Gómez, Lizeth Natalia |
dc.contributor.advisor.none.fl_str_mv |
García Betancourt, Isauro Reyes Ortíz, Sandra Patricia |
dc.contributor.author.none.fl_str_mv |
Matíz Beltrán, Nathalia Katherine Rueda Gómez, Lizeth Natalia |
dc.subject.spa.fl_str_mv |
Construcción Vivienda Análisis Medición Proceso Rendimiento Mano de obra Consumo |
topic |
Construcción Vivienda Análisis Medición Proceso Rendimiento Mano de obra Consumo Building Living place Analysis Measurement Process Performance Workforce Consumption |
dc.subject.other.spa.fl_str_mv |
Building Living place Analysis Measurement Process Performance Workforce Consumption |
description |
El presente Manual de Estimación del Tiempo Requerido en la Construcción de una Vivienda es el producto de un análisis sistemático de literatura. Se fundamenta en conocimientos científicos, técnicos y legales. Su contenido está estructurado en seis capítulos titulados: contextualización, marco referencial, estimación de tiempo, aplicación en una casa de dos niveles, recomendaciones y conclusiones. La contextualización presenta la información suficiente y necesaria que identifica el Manual: Título, antecedentes, formulación, objetivos, justificación y alcance. El Marco de referencial contiene un esbozo amplio de la información conceptual y técnica que fundamenta el manual y las normas específicas tenidas en cuenta en su elaboración. Aborda los temas: suelos, vivienda, proceso constructivo, medición cantidad de obra, administración de personal, programación de obra y rendimientos en construcción. La Estimación del tiempo en la construcción de una vivienda contiene el proceso y los formatos de recolección de información técnica y de tiempo de duración por actividades. La aplicación en la construcción de una vivienda de dos niveles es la verificación del Manual en un prototipo de vivienda específica. Se aplica el proceso y se diligencia los formatos de recolección de datos técnicos y operacionales que llevaron a determinar el tiempo requerido para la construcción de la obra en consideración. El manual presenta recomendaciones específicas en la obtención de la información técnica, que son útiles para los resultados del proceso. Las Conclusiones hacen referencia a la utilidad del manual en la elaboración del presupuesto y la programación de obra. |
publishDate |
2020 |
dc.date.accessioned.none.fl_str_mv |
2020-12-13T02:51:08Z |
dc.date.available.none.fl_str_mv |
2020-12-13T02:51:08Z |
dc.date.issued.none.fl_str_mv |
2020-11-21 |
dc.type.none.fl_str_mv |
Trabajo de grado - Pregrado |
dc.type.coar.none.fl_str_mv |
http://purl.org/coar/resource_type/c_7a1f |
dc.type.driver.none.fl_str_mv |
info:eu-repo/semantics/bachelorThesis |
dc.type.version.none.fl_str_mv |
info:eu-repo/semantics/acceptedVersion |
format |
http://purl.org/coar/resource_type/c_7a1f |
status_str |
acceptedVersion |
dc.identifier.uri.none.fl_str_mv |
https://hdl.handle.net/20.500.12494/28498 |
dc.identifier.bibliographicCitation.spa.fl_str_mv |
Matíz Beltrán, N. K. y Rueda Gómez, L. N. (2020). Manual para estimar el tiempo requerido en la construcción de vivienda [Trabajo de pregrado, Universidad Cooperativa de Colombia]. Repositorio Institucional UCC. http://hdl.handle.net/20.500.12494/28498 |
url |
https://hdl.handle.net/20.500.12494/28498 |
identifier_str_mv |
Matíz Beltrán, N. K. y Rueda Gómez, L. N. (2020). Manual para estimar el tiempo requerido en la construcción de vivienda [Trabajo de pregrado, Universidad Cooperativa de Colombia]. Repositorio Institucional UCC. http://hdl.handle.net/20.500.12494/28498 |
dc.relation.references.spa.fl_str_mv |
Agudelo, O., Gomez, J. B., & Cruz, R. (2009). Manual de construcción. Universidad Nacional. Medellin. Aguilar, R. (2014). Sistemas constructivos en vivienda. Obtenido de https://es.slideshare.net/soycalderon/sistemas-constructivos-41518051 Cano, R. Antonio & Duque, V. Gustavo (2000). Sena CAMACOL rendimientos y consumo de mano de obra. Obtenido de https://www.academia.edu/28454664/sena_camacol_rendimientos_y_consumos_de_mano_de_obra_trabaj0. Castellanos, m. D. (2012). Administración de personal. México: red tercer milenio. Erazo, Y, M. (2012). Administración de personal, definición, objetivos y estructura. Obtenido de https://www.gestiopolis.com/administracion-de-personal-definicion-objetivos-y-estructura/ Fernando, B. L. (2002). Analisis de rendimientos y consumos de manos de obra en actividades de construcción . Universidad EAFIT, 21 Franquet, J. y Querol, A. (2010). Nivelación de terrenos por regresión tridimensional. Universidad Nacional de Educación a Distancia. Obtenido de http://www.eumed.net/librosgratis/2011b/967/explanacion%20y%20nivelacion%20del%20terreno.html SENA. (2009). Planos estructurales. Obtenido de http://es.slideshare.net/wglo/fundamentosestructurales M en E y Gómez, J.L. (s.f). Arquitectura y educación. Obtenido de http://aducarte.weebly.com/uploads/5/1/2/7/5127290/losas_de_entrepiso.pd Garces, V. (s.f). Cartilla Proceso Constructivo en Edificaciones. SENA. Obtenido de http://www.academia.edu/11050598/cartilla_proceso_constructivo_en_edificaciones Microdata. (2020). Conceptos y definiciones básicas. Obtenido de http://microdata.worldbank.org/index.php/catalog/599/download/15786 Montero, e. U. (2007). Prácticas organizacionales y técnicas de entrevista en la gestión del potencial humano. Euned. Muñoz Álzate , M. C. (2016). Guia para elaboración de costos y presupuestos de obra civil. Apuntes de clase. Bogota: segunda edicion. Polanco , L., & Remolina Millan, A. (2014). Estudio de rendimientos para las actividades estructura y mamposteria para un proyecto de construcción en el campus UPB. Bucaramanga : UPB. Recursos en Project Management. (s.f). Diagrama PERT de un proyecto. Obtenido de https://www.recursosenprojectmanagement.com/creacion-del-cronograma-pert/ Sergio, A. (2014). Analisis de productividad, rendimientos y consumos de mano de obra en procesos constructivos, elemento fundamental en la fase de planeación . Medellin: Universidad Nacional de Colombia. Significados. (2018). Significado de ruta crítica. Obtenido de https://www.significados.com/rutacritica/ Universitat de Barcelona. (s.f). ¿Qué es un diagrama de Gantt y para qué sirve?. Project Management. Obtenido de https://obsbusiness.school/es/blog-projectmanagement/diagramas-de-gantt/que-es-un-diagrama-de-gantt-y-para-que-sirve Valencia, J. R. (2007). Administración moderna de personal. International thomson editores, s.a. de c.v. Vía célere. (2020). Tipos de vivienda que existen, Te los contamos. Obtenido de https://www.viacelere.com/blog/tipos-viviendas-que-existen/#tipos-de-viviendas |
dc.rights.license.none.fl_str_mv |
Atribución – No comercial – Sin Derivar |
dc.rights.accessrights.none.fl_str_mv |
info:eu-repo/semantics/openAccess |
dc.rights.coar.none.fl_str_mv |
http://purl.org/coar/access_right/c_abf2 |
rights_invalid_str_mv |
Atribución – No comercial – Sin Derivar http://purl.org/coar/access_right/c_abf2 |
eu_rights_str_mv |
openAccess |
dc.format.extent.spa.fl_str_mv |
201 p. |
dc.publisher.spa.fl_str_mv |
Universidad Cooperativa de Colombia, Facultad de Ingenierías, Ingeniería Civil, Villavicencio |
dc.publisher.program.spa.fl_str_mv |
Ingeniería Civil |
dc.publisher.place.spa.fl_str_mv |
Villavicencio |
institution |
Universidad Cooperativa de Colombia |
bitstream.url.fl_str_mv |
https://repository.ucc.edu.co/bitstreams/da063bac-497f-4b96-820d-edf2f12ce433/download https://repository.ucc.edu.co/bitstreams/ae074a41-0190-4fe7-804a-909d4357865d/download https://repository.ucc.edu.co/bitstreams/da5257ab-1637-48de-9bfa-c7a810d658f1/download https://repository.ucc.edu.co/bitstreams/123eb01e-dbdc-4017-b71e-54c6e31bf8e5/download https://repository.ucc.edu.co/bitstreams/2607903d-1887-4405-bac9-bfcbfb6b6323/download |
bitstream.checksum.fl_str_mv |
3bce4f7ab09dfc588f126e1e36e98a45 33c1b6e3f9fff0c8ab333461e44faf0e dd17b7e7d97b4bf91299276c89656da2 04755f1e8ad429cc77234f27c5192274 79c10879fbb329b374fa11a6a53ff3ea |
bitstream.checksumAlgorithm.fl_str_mv |
MD5 MD5 MD5 MD5 MD5 |
repository.name.fl_str_mv |
Repositorio Institucional Universidad Cooperativa de Colombia |
repository.mail.fl_str_mv |
bdigital@metabiblioteca.com |
_version_ |
1814246601456091136 |
spelling |
García Betancourt, IsauroReyes Ortíz, Sandra PatriciaMatíz Beltrán, Nathalia KatherineRueda Gómez, Lizeth Natalia2020-12-13T02:51:08Z2020-12-13T02:51:08Z2020-11-21https://hdl.handle.net/20.500.12494/28498Matíz Beltrán, N. K. y Rueda Gómez, L. N. (2020). Manual para estimar el tiempo requerido en la construcción de vivienda [Trabajo de pregrado, Universidad Cooperativa de Colombia]. Repositorio Institucional UCC. http://hdl.handle.net/20.500.12494/28498El presente Manual de Estimación del Tiempo Requerido en la Construcción de una Vivienda es el producto de un análisis sistemático de literatura. Se fundamenta en conocimientos científicos, técnicos y legales. Su contenido está estructurado en seis capítulos titulados: contextualización, marco referencial, estimación de tiempo, aplicación en una casa de dos niveles, recomendaciones y conclusiones. La contextualización presenta la información suficiente y necesaria que identifica el Manual: Título, antecedentes, formulación, objetivos, justificación y alcance. El Marco de referencial contiene un esbozo amplio de la información conceptual y técnica que fundamenta el manual y las normas específicas tenidas en cuenta en su elaboración. Aborda los temas: suelos, vivienda, proceso constructivo, medición cantidad de obra, administración de personal, programación de obra y rendimientos en construcción. La Estimación del tiempo en la construcción de una vivienda contiene el proceso y los formatos de recolección de información técnica y de tiempo de duración por actividades. La aplicación en la construcción de una vivienda de dos niveles es la verificación del Manual en un prototipo de vivienda específica. Se aplica el proceso y se diligencia los formatos de recolección de datos técnicos y operacionales que llevaron a determinar el tiempo requerido para la construcción de la obra en consideración. El manual presenta recomendaciones específicas en la obtención de la información técnica, que son útiles para los resultados del proceso. Las Conclusiones hacen referencia a la utilidad del manual en la elaboración del presupuesto y la programación de obra.This Manual for Estimating the Time Required to Build a Home is the product of a systematic literature review. It is based on scientific, technical and legal knowledge. Its content is structured in six chapters entitled: contextualization, reference framework, time estimation, application in a two-level house, recommendations and conclusions. Contextualization presents the sufficient and necessary information that the Manual identifies: Title, background, formulation, objectives, justification and scope. The Reference Framework contains a broad outline of the conceptual and technical information underlying the manual and the specific standards taken into account in its preparation. It addresses the topics: land, housing, construction process, measurement of work quantity, personnel administration, work scheduling and construction performance. The Estimation of time in the construction of a house contains the process and the formats for collecting technical information and time duration by activities. The application in the construction of a two-level house is the verification of the Manual on a specific housing prototype. The process is applied and the technical and operational data collection forms are completed that led to the determination of the time required for the construction of the work under consideration. The manual presents specific recommendations in obtaining technical information, which are useful for the results of the process. The Conclusions refer to the usefulness of the manual in preparing the budget and scheduling work.Resumen -- Abstract – Introducción -- Capítulo 1. Contextualización -- 1.1.Titulo -- 1.2.Antecedentes -- 1.3.Formulación -- 1.4.Objetivos -- 1.4.1.Objetivo General -- 1.4.2.Objetivos Específicos -- 1.5.Justificación-- 1.6.Alcance -- Capítulo 2. Marco Referencial -- 2.1. Marco Teórico -- 2.1.1. Suelos -- 2.1.2. Vivienda -- 2.1.3. Medición de la cantidad de obra -- 2.1.4. Administración de Personal -- 2.1.5. Programación de Obra -- 2.1.6. Rendimientos y Consumo en Construcción -- 2.2 Marco Legal -- 2.2.1. Normas constructivas -- 2.2.2. Normas Institucionales. -- 3. Estimación del Tiempo en la Construcción de una Vivienda -- 3.1 Proceso -- 3.2 formatos -- 4. Aplicación en la Construcción de una Casa Modelo de Dos Niveles -- 4.1 Planos de Construcción -- 4.1.1 Planos Estructurales -- 4.1.2 Planos Arquitectónicos -- 4.2. Datos Geotécnicos y Geométricos -- 4.2.1. Diligenciamiento formato de recolección de datos geotécnicos y geométricos. -- 4.2.2 Memoria de cálculos -- 4.3. Cantidades de Obra-- 4.4. Tiempo de las Actividades o Procesos -- 4.5 Diagramas de Programación de Obra -- 4.5.1 Diagrama de Gantt -- 4.5.2 Diagrama de Pert -- 4.6 Tiempo Total de Ejecución -- 4.6.1. Ruta crítica para construcción obra negra -- 4.6.2. Ruta crítica construcción obra gris y blanca -- 5. Recomendaciones -- 6. Conclusiones -- Bibliografía --nathalia.matizb@campusucc.edu.colizeth.ruedag@campusucc.edu.co201 p.Universidad Cooperativa de Colombia, Facultad de Ingenierías, Ingeniería Civil, VillavicencioIngeniería CivilVillavicencioConstrucciónViviendaAnálisisMediciónProcesoRendimientoMano de obraConsumoBuildingLiving placeAnalysisMeasurementProcessPerformanceWorkforceConsumptionManual para estimar el tiempo requerido en la construcción de viviendaTrabajo de grado - Pregradohttp://purl.org/coar/resource_type/c_7a1finfo:eu-repo/semantics/bachelorThesisinfo:eu-repo/semantics/acceptedVersionAtribución – No comercial – Sin Derivarinfo:eu-repo/semantics/openAccesshttp://purl.org/coar/access_right/c_abf2Agudelo, O., Gomez, J. B., & Cruz, R. (2009). Manual de construcción. Universidad Nacional. Medellin.Aguilar, R. (2014). Sistemas constructivos en vivienda. Obtenido de https://es.slideshare.net/soycalderon/sistemas-constructivos-41518051Cano, R. Antonio & Duque, V. Gustavo (2000). Sena CAMACOL rendimientos y consumo de mano de obra. Obtenido de https://www.academia.edu/28454664/sena_camacol_rendimientos_y_consumos_de_mano_de_obra_trabaj0.Castellanos, m. D. (2012). Administración de personal. México: red tercer milenio.Erazo, Y, M. (2012). Administración de personal, definición, objetivos y estructura. Obtenido de https://www.gestiopolis.com/administracion-de-personal-definicion-objetivos-y-estructura/Fernando, B. L. (2002). Analisis de rendimientos y consumos de manos de obra en actividades de construcción . Universidad EAFIT, 21Franquet, J. y Querol, A. (2010). Nivelación de terrenos por regresión tridimensional. Universidad Nacional de Educación a Distancia. Obtenido de http://www.eumed.net/librosgratis/2011b/967/explanacion%20y%20nivelacion%20del%20terreno.htmlSENA. (2009). Planos estructurales. Obtenido de http://es.slideshare.net/wglo/fundamentosestructuralesM en E y Gómez, J.L. (s.f). Arquitectura y educación. Obtenido de http://aducarte.weebly.com/uploads/5/1/2/7/5127290/losas_de_entrepiso.pdGarces, V. (s.f). Cartilla Proceso Constructivo en Edificaciones. SENA. Obtenido de http://www.academia.edu/11050598/cartilla_proceso_constructivo_en_edificacionesMicrodata. (2020). Conceptos y definiciones básicas. Obtenido de http://microdata.worldbank.org/index.php/catalog/599/download/15786Montero, e. U. (2007). Prácticas organizacionales y técnicas de entrevista en la gestión del potencial humano. Euned.Muñoz Álzate , M. C. (2016). Guia para elaboración de costos y presupuestos de obra civil. Apuntes de clase. Bogota: segunda edicion.Polanco , L., & Remolina Millan, A. (2014). Estudio de rendimientos para las actividades estructura y mamposteria para un proyecto de construcción en el campus UPB. Bucaramanga : UPB.Recursos en Project Management. (s.f). Diagrama PERT de un proyecto. Obtenido de https://www.recursosenprojectmanagement.com/creacion-del-cronograma-pert/Sergio, A. (2014). Analisis de productividad, rendimientos y consumos de mano de obra en procesos constructivos, elemento fundamental en la fase de planeación . Medellin: Universidad Nacional de Colombia.Significados. (2018). Significado de ruta crítica. Obtenido de https://www.significados.com/rutacritica/Universitat de Barcelona. (s.f). ¿Qué es un diagrama de Gantt y para qué sirve?. Project Management. Obtenido de https://obsbusiness.school/es/blog-projectmanagement/diagramas-de-gantt/que-es-un-diagrama-de-gantt-y-para-que-sirveValencia, J. R. (2007). Administración moderna de personal. International thomson editores, s.a. de c.v.Vía célere. (2020). Tipos de vivienda que existen, Te los contamos. Obtenido de https://www.viacelere.com/blog/tipos-viviendas-que-existen/#tipos-de-viviendasPublicationLICENSElicense.txtlicense.txttext/plain; charset=utf-84334https://repository.ucc.edu.co/bitstreams/da063bac-497f-4b96-820d-edf2f12ce433/download3bce4f7ab09dfc588f126e1e36e98a45MD56ORIGINAL2020_manual_estimar_tiempo.pdf2020_manual_estimar_tiempo.pdfTrabajo de gradoapplication/pdf4397739https://repository.ucc.edu.co/bitstreams/ae074a41-0190-4fe7-804a-909d4357865d/download33c1b6e3f9fff0c8ab333461e44faf0eMD542020_manual_estimar_tiempo.pdf2020_manual_estimar_tiempo.pdfLicencia de usoapplication/pdf2365642https://repository.ucc.edu.co/bitstreams/da5257ab-1637-48de-9bfa-c7a810d658f1/downloaddd17b7e7d97b4bf91299276c89656da2MD55THUMBNAIL2020_manual_estimar_tiempo.pdf.jpg2020_manual_estimar_tiempo.pdf.jpgGenerated Thumbnailimage/jpeg2848https://repository.ucc.edu.co/bitstreams/123eb01e-dbdc-4017-b71e-54c6e31bf8e5/download04755f1e8ad429cc77234f27c5192274MD57TEXT2020_manual_estimar_tiempo.pdf.txt2020_manual_estimar_tiempo.pdf.txtExtracted texttext/plain102130https://repository.ucc.edu.co/bitstreams/2607903d-1887-4405-bac9-bfcbfb6b6323/download79c10879fbb329b374fa11a6a53ff3eaMD5820.500.12494/28498oai:repository.ucc.edu.co:20.500.12494/284982024-08-10 22:29:18.543open.accesshttps://repository.ucc.edu.coRepositorio Institucional Universidad Cooperativa de Colombiabdigital@metabiblioteca.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 |